Yandal Investor Update
Released
Released
Announcement PDF
Discovery &
Resource Growth
in WA’s Tier-1
Gold Belts
Investor Update | November 2023
ASX:YRL
yandalresources.com.au
1
IMPORTANT INFORMATION
DISCLAIMERS
FORWARD LOOKING STATEMENT
COMPETENT PERSONS STATEMENT
This presentation has been prepared by Yandal Resources Ltd (“Yandal” or “YRL”). The information contained in this presentation is a
The information in this document that relates to Exploration Results, geology and data compilation is
professional opinion only and is given in good faith. Certain information in this document has been derived from third parties and though YRL has
based on information reviewed or compiled by Mr Chris Oorshcot, a Competent Person who is a
no reason to believe that it is not accurate, reliable or complete, it has not been independently audited or verified by YRL. This presentation is in
Member of The Australasian Institute Geoscientists. Mr Oorschot is the Exploration Manager for the
summary form and does not purport to be all inclusive or complete. Recipients should conduct their own investigations and perform their own
Company, is a full-time employee and holds options in the Company. Mr Oorschot has sufficient
analysis in order to satisfy themselves as to the accuracy and completeness of the information, statements and opinions contained.
experience which is relevant to the style of mineralisation and type of deposit under consideration and
to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
This is for information purposes only. Neither this nor the information contained in it constitutes an offer, invitation, solicitation or recommendation
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
in relation to the purchase or sale of YRL shares in any jurisdiction. This does not constitute investment advice and has been prepared without
Oorschot consents to the inclusion in this announcement of the matters based on this information in the
taking into account the recipient’s investment objectives, financial circumstances or particular needs and the opinions and recommendations
form and context in which it appears.
in this presentation are not intended to represent recommendations of particular investments to particular persons. Recipients should seek
professional advice when deciding if an investment is appropriate. All securities transactions involve risks, which include (among others) the risk
The information in this announcement that relates to the Flushing Meadows, Mt McClure and Gordons
of adverse or unanticipated market, financial or political developments.
Dam Mineral Resource Estimates is based on information compiled and generated by Andrew
Bewsher, an employee of BM Geological Services Pty Ltd (“BMGS”). Both Andrew Bewsher and BMGS
To the fullest extent permitted by law, YRL, its officers, employees, related bodies corporate, agents and advisers do not make any
hold shares in the company. BMGS consents to the inclusion, form and context of the relevant
representation or warranty, express or implied, as to the currency, accuracy, reliability or completeness of any information, statements, opinions,
information herein as derived from the original resource reports. Mr Bewsher has sufficient experience
estimates, forecasts or other representations contained in this presentation. No responsibility for any errors or omissions from this arising out of
relevant to the style of mineralization and type of deposit under consideration and to the activity which
negligence or otherwise is accepted.
is being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the JORC
Any forward-looking statements included in this document involve subjective judgment and analysis and are subject to uncertainties, risks and
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.
contingencies, many of which are outside the control of, and may be unknown to YRL. In particular, they speak only as of the date of this
YRL confirms that it is not aware of any new information or data that materially affects the information
document, they assume the success of YRL’s strategies, and they are subject to significant regulatory, business, competitive and economic
included in the original market announcements. The company confirms that the form and context in
uncertainties and risks. Actual future events may vary materially from the forward-looking statements and the assumptions on which the forward-
which the Competent Person’s findings are presented have not been materially modified from the
looking statements are based. Recipients of this document are cautionead to not place undue reliance on such forward-looking statements.
original market announcements.
ASX: YRL | YANDALRESOURCES. COM. AU
2
SIGNIFICANT
DISCOVERY POTENTIAL
EXPLORING FOR BIG DEPOSITS IN TIER 1 BELTS
Outstanding Locations in Tier 1 Belts
Real Potential For Significant Discoveries
Clear Pathways For Resource Growth
Committed, Technically Driven Exploration
Approach
Highly Leveraged For Exploration Success
Exploration Target At Ironstone WellBarwidgee:
12.9M-38.6Mt @ 1.1 to 1.4 g/t Au, for 0.44Moz
to 1.78Moz*
*Refer to Appendix 1 for further details of Exploration Targets. Includes Oblique,
Quarter Moon, Flushing Meadows Extended, New England Granite. Excludes
existing Resources of 268kOz at Flushing Meadows. 10,000oz.
04
3
CORPORATE OVERVIEW
CAPITAL STRUCTURE
Shareholders
A STRONGLY SUPPORTIVE SHARE REGISTER
157.8M
31.3M
Shares On Issue
Options/Per Rights
Board, Management, Founders
Gold Road
$3.2M
$0.055
Cash
Share Price
~$8.8M
~$5.6M
Market Cap
Enterprise Value
~$11
~78%
EV/Res Oz
Top 20 Holding
(30/9//23)
Other
Au Xingao
Hall Group
Regal Funds
Datt Capital
ASX: YRL | YANDALRESOURCES. COM. AU
4
BOARD & MANAGEMENT
SUCCESSFUL BOARD & MANAGEMENT TEAM
EXPLORATION & DEVELOPMENT
| PROJECT FINANCE
| STRATEGY
| GOVERNANCE
Tim Kennedy
Managing Director & CEO
Greg Evans
Non Executive Chairman
Katina Law
Non Executive Director
BApp Sc (Geol), MBA, MAusIMM, MGSA
BCom, DipApp Fin, GAICD
BCom, FCPA, MBA, GAICD
- Geologist with +35yrs experience
- Exploration, Feasibility and Development
- Involvement in significant discoveries;
Karlawinda & Tropicana (Au), Rosie (Ni), Triumph (Zn-Cu)
- +25yrs in investment banking in the mining and resources
sector
- Corporate and Financial Advisor to public companies
and large private business owners across multiple
sectors
Chris Oorschot
Technical Director
Eduard Eshuys
Strategic/Technical Advisor
BSc (Hons 1st Class), MAIG, MSEG
BSc, FAusIMM, FAICD
- Geologist with +13yrs experience predominantly in the
Western Australian gold sector
- Expertise in complex stratigraphic environments and
structurally controlled mineralised systems.
ASX: YRL | YANDALRESOURCES. COM. AU
- +30yrs experience in the mining industry covering
corporate and site-based finance roles across several
continents
Has held senior positions at Newmont Mining
Corporation’s head office in Denver, USA
- Highly successful explorer and gold industry executive.
- Led teams in discovery of numerous gold deposits
including Plutonic, Jundee and Bronzewing
- Former Executive Chairman of DGO Gold
5
SIGNIFICANT
DISCOVERY POTENTIAL
STRATEGICALLY LOCATED PROJECTS
Ironstone Well & Barwidgee
• Tenements cover > 53km of strike between Jundee and Bronzewing
Mt McClure
• >12km long gold system on granted mining leases located 15km south-west of
Bronzewing
Gordons
• High grade prospects in similar structural setting to Kanowna Belle and Paddington
30km from Kalgoorlie
All Projects
• Combined Resources of 470,200oz1 gold on granted mining leases
• Located in Proven Tier 1 gold producing belts close to operating
mines and infrastructure
• Large new discovery potential
1. Refer to supplementary information at the back of this presentation for further details of all Resources
ASX: YRL | YANDALRESOURCES. COM. AU
6
SIGNIFICANT
DISCOVERY POTENTIAL
THE YANDAL GREENSTONE BELT
A true Tier 1 gold belt
• 17Moz endowment and growing
• Numerous deposits ranging from +1Moz to +10Moz
Yandal Projects are well-positioned near existing mines and infrastructure
Ironstone Well – Barwidgee
• 268,000oz on granted mining leases 55km from Jundee
• Located centrally between Bronzewing and Jundee
Mt McClure
• 182,200oz on granted mining leases
• Within 15km of Bronzewing plant (care & maintenance)
• 10km south of ASX: NST Orelia Operation
Strong potential for further discoveries
• Relatively short exploration history (ca. 30 years vs. +100 years in other belts)
• Less than 2% outcrop has sidelined traditional prospecting methods
ASX: YRL | YANDALRESOURCES. COM. AU
7
IRONSTONE WELL & BARWIDGEE
A SCIENTIFIC APPROACH NEEDED
> 50m – Moderately Effective
All the ingredients for a discovery
> 100m – Mostly Effective
• 53km of strike (370km2)
• Big structures
• Prospective lithologies
• Centrally located between the two biggest deposits in the belt
Underexplored
• Complex regolith
• Common transported cover
• Deep weathering and geochemical depletion (>100m in places)
Less than 6% of holes deeper than 100m
• Less than 30% of holes deeper than 50m
• “Set and forget” drilling programs were largely ineffective
• Historic shallow vertical RAB/AC often did not test bedrock
ASX: YRL | YANDALRESOURCES. COM. AU
8
IRONSTONE WELL & BARWIDGEE
STRATEGY
Minerals system approach to exploration targeting including
independent consultants with a track-record of discovery to
help develop targets
Rank targets based on empirical and conceptual merit
• Focus on prospects with potential for large-scale discovery
will “move the dial”, or
• provide material Resource growth to existing deposits
Forensically evaluate past exploration to determine where the
real discovery opportunities are
• Ineffective drilling
• Possible depletion in the near-surface
• Structural and stratigraphic re-interpretations
Three standout prospects
• Oblique
• Quarter Moon
• New England Granite
ASX: YRL | YANDALRESOURCES. COM. AU
9
IRONSTONE WELL & BARWIDGEE
TARGETING A GOLD CAMP
Flushing Meadows Exploration Target*
Range
Lower
Upper
Tonnes (kt)
2,400
7,200
Grade (g/t Au)
1.2
1.5
Ounces (Oz)
90,000
350,000
This does not include the current Inferred Resource
268,000oz @ 1.1g/t Au1
Oblique Exploration Target*
Range
Lower
Upper
Tonnes (kt)
3,300
9,100
Grade (g/t Au)
1.2
1.5
Ounces (Oz)
130,000
440,000
Quarter Moon Exploration Target*
Range
Lower
Upper
Tonnes (kt)
2,200
6,800
Grade (g/t Au)
1.4
1.8
Ounces (Oz)
100,000
390,000
7.9 to 23.0Mt, grading between 1.3 to 1.6 g/t Au, for
0.32Moz to 1.17Moz
ASX: YRL | YANDALRESOURCES. COM. AU
* The potential quantity and
grade of the Exploration
Target is conceptual in
nature. There has been
insufficient exploration to
estimate a Mineral Resource
and it is uncertain that
further exploration will result
in the estimation of a
Resource. Key assumptions
of the Exploration Target are
appended
to
this
presentation. Refer to the
supplemental information at
the back of this presentation
for
assumptions
underpinning the target
ranges. Given the range of
estimation
uncertainty,
numbers
have
been
rounded to the nearest
10,000oz.
10
IRONSTONE WELL & BARWIDGEE
OBLIQUE
> 1.9km long system along the Barwidgee Shear
Intercepts include:
• 24m @ 0.7g/t Au from 26m (YRLRC1156),
including 8m @ 1.2g/t Au & 3m @ 1.3g/t Au
• 12m @ 1.1g/t Au from 84m EOH (YRLRC1157),
including 2m @ 2.8g/t Au and 6m @ 1.5g/t Au
• 5m @ 2.8g/t Au from 62m (YRLRC1159),
including 2m @ 6.0g/t Au
• 14m @ 0.4g/t Au from 45m (YRLRC1162)
Open down-dip and along strike and parallel lode positions
Fresh rock is largely un-tested
Complex drilling conditions resulted in limited historic
exploration
ASX: YRL | YANDALRESOURCES. COM. AU
11
IRONSTONE WELL & BARWIDGEE
OBLIQUE
ASX: YRL | YANDALRESOURCES. COM. AU
12
IRONSTONE WELL & BARWIDGEE
QUARTER MOON
> 1.5km long system
Intercepts include:
• 3m @ 11.0g/t Au from 80m (CYPFRC6)
• 8m @ 2.7g/t Au from 141m (GCMQTMC6)
• 12m @ 2.0g/t Au from 5m (YRLRC479)
Open down-dip and along-strike
Dolerite-hosted mineralisation (quartz-magnetite granophyre)
Potential for footwall positions – poorly explored
Sufficient spacing to eventually feed into MRE
ASX: YRL | YANDALRESOURCES. COM. AU
13
IRONSTONE WELL & BARWIDGEE
QUARTER MOON
ASX: YRL | YANDALRESOURCES. COM. AU
14
IRONSTONE WELL & BARWIDGEE
NEW ENGLAND GRANITE
New England Granite (NEG)
• 4.4 x 2km km buried granitic intrusion
• Mineralisation along the eastern margin
• Historic regolith anomalies
• Common setting for gold deposits (e.g. King of
the Hills, Ramone, Montague)
New England Granite Exploration Target*
Range
Lower
Upper
Tonnes (kt)
5,000
15,600
Grade (g/t Au)
0.75
1.2
Ounces (Oz)
120,000
600,000
•
The potential quantity and grade of the Exploration Target is conceptual in nature.
There has been insufficient exploration to estimate a Mineral Resource, and it is
uncertain that further exploration will result in the estimation of a Resource. Key
assumptions of the Exploration Target are appended to this presentation. Refer to the
supplemental information at the back of this presentation for assumptions
underpinning the target ranges. Given the range of estimation uncertainty, numbers
have been rounded to the nearest 10,000oz.
ASX: YRL | YANDALRESOURCES. COM. AU
15
IRONSTONE WELL & BARWIDGEE
NEW ENGLAND GRANITE
Small RC program completed in September 2023
Tested interpreted northwest striking structures associated with strong
regolith anomalies
• Highlighted two possible geometries
• Confirmed a clear alteration associated with anomalism and
mineralisation
• Clear magnetite destruction of host granite where mineralisation occurs
The focus will be projecting structures/mineralisation trends onto the
eastern margin if the intrusive and testing these positions
ASX: YRL | YANDALRESOURCES. COM. AU
16
IRONSTONE WELL & BARWIDGEE
NEXT STEPS
Oblique
• ~2,500m RC (November 2023)
• 1,000-1,500m DDH
• Confirm internal continuity and lode geometry
• Extend Mineralisation to the south
• Test mineralisation within fresh rock
Quarter Moon
• ~2,900m RC
• Confirm internal continuity and lode geometry
• Scope larger target, dip extensions
New England Granite
• 800m DDH (EIS Co-funded Drilling)
• Circa 1,200-2,000m RC follow up program in design
• Test structures adjacent to the eastern margin
Lithium
• Preliminary targeting assessment underway
ASX: YRL | YANDALRESOURCES. COM. AU
17
MT MCCLURE
RESOURCE GROWTH AND NEW DISCOVERY
>12km long gold system on granted mining leases
Located adjacent to Northern Star’s (ASX: NST) Orelia mining operation (1.1Moz) and 15km
from the Bronzewing processing plant
Historical mining from shallow oxide open pits
> 100,000 oz @ ca. 3 g/t Au to a maximum depth of 60 - 100m (total Mt McClure mining
center endowment >1.8Moz).
• Majority of mining took place when gold price was AUD$500-1000/oz
•
Yandal initial Mineral Resource Estimates beneath and adjacent to historic open pit mines
and new satellite deposits:
• 182,200oz Au @ 1.4g/t Au
Ample scope down plunge and along strike from MRE’s to increase Resources
Broad spaced deep drilling by Yandal confirms mineralisation extends up to 240m beneath
each historic pit.
Highly prospective and poorly tested footwall and hanging wall positions
04
ASX: YRL | YANDALRESOURCES. COM. AU
18
MT MCCLURE
EXPLORATION MODEL
Stacked plunging high-grade shoots
Similar to nearby + 1Moz Orelia (> 400m down plunge extent)1
All deposits exhibit similar structural control
Orelia Long Section reversed to show same viewing
perspective as Success Long Section
1 Information derived from Echo Resources ASX Announcement 29 April 2019 “Yandal Gold
Project BFS & Growth Strategy” prior to takeover by Northern Star in October 2019.
ASX: YRL | YANDALRESOURCES. COM. AU
Success Long Section showing block model colored according to grade, historic pit
outline (grey) and Yandal broad spaced drilling (blue traces)
19
MT MCCLURE
EXPLORATION SUCCESS
HMS Sulphur – confirming the potential for new Resources
•
•
•
•
•
Located immediately to the north of the Success deposit
+ 700m striking system down to 170m vertical (open)
Initial Inferred MRE for HMS Sulphur deposit of 1,010,000t @ 1.2g/t Au for 39,000oz1
Discovery cost less than $20/oz
78% of ounces fall within shallow oxide and transitional material
Clear potential to build on the initial MRE with shallow RC drilling
04
MT MCCLURE
NEXT STEPS
Follow-up drilling at HMS Sulphur in design
- Test south of the MRE in the footwall of the Success deposit
Review of Project stratigraphy and structural controls
• Structural interpretation underway
• Identify favourable foot-wall and hanging-wall targets
• Identify favourable un-tested positions
• Follow-up AC anomalies
Evaluate the down-plunge potential of existing deposits
ASX: YRL | YANDALRESOURCES. COM. AU
21
GORDONS
TIER 1 LOCATION
Strategic Ground Position
• Tenements cover ~56km 2
• 30km from Kalgoorlie
• Within haulage distance to multiple gold processing plants
Compelling Geological Setting
• Eastern flank of the Scotia-Kanowna Dome
• Straddles the mineralised Gordon-Sirdar Shear Zone
• Similar structural setting to Kanowna Belle (+6.4M Oz) and Paddington (+1Moz)
Fertile system
• Mines, historic gold workings and occurrences
Poorly explored
• Ineffective or no drilling
• Deep weathering and depletion
22
GORDONS
3D STRUCTURAL MODELLING
Consultant Ben McCormack (Outlier Geoscience) has interpreted a significant structural
corridor (Gordon Sirdar-Shear Zone or “GSSZ”)
• GSSZ extends through the Star of Gordon Prospect to the immediate south of the
Gordon Project towards the +6.4Moz Kanowna Belle
• Contains geological architecture permissive for the formation of significant gold
deposits
• Stratigraphy interpreted to be the same or equivalent to that at Kanowna Belle
Historic exploration hampered by salt lakes
Exploration on the margins of salt lakes has highlighted gold anomalous trends
Newly acquired tenure takes coverage of GSSZ within 8km of Kanowna Belle
This represents a significant new exploration opportunity for Yandal
23
GORDONS
NEXT STEPS
Gordons South
• Compilation of historic data complete
• Lithology and structural interpretation underway
• Target generation to be completed by December 2023
• Awaiting grant of exploration license
Gordons
• Re-prioritization of targets around the GSSZ complete
• RC drilling design is underway
24
NEXT STEPS
VERY ACTIVE WORK PROGRAM
Projects
Ironstone Well
/Barwidgee
Q4 - CY2023
Q1 - CY2024
Q2 - CY2024
Integrate external target generation study
results & update geological model
RC Drill test Oblique +/Quarter Moon
Assess drilling results and plan next phase
of drilling
RC Drill test Oblique, Quarter Moon,
New England Granite
Preliminary lithium targeting assessment
Review Project Stratigraphy and structural controls
Mt McClure
RC test Sulphur extensions and
strat/structural targets
Preliminary lithium targeting assessment
Gordons
Integrate results of 3D geological model
and prioritise prospects for drill test
Expedite grant of Gordon Sth ELA
ASX: YRL | YANDALRESOURCES. COM. AU
AC/RC drilling of initial
targets
Follow-up AC/RC drilling
Preliminary lithium targeting assessment
Note: Work program and timing may change according to results
25
YANDAL RESOURCES HIGHLIGHTS
KEY INVESTMENT HIGHLIGHTS
Three Strategically Located Projects
each with multiple discovery opportunities
Emerging Significant (km-scale) Discoveries
at Ironstone Well/Barwidgee; Oblique, Quarter Moon, New England Granite
testing an Exploration Target of 12.9M-38.6Mt @ 1.1 to 1.4 g/t Au, for 0.44Moz
to 1.78Moz
Substantial Resource Inventory (470,200oz)
on granted mining leases near current mining operations (EV of ~$5.6m)
Immediate Opportunity For Resource Growth
at Mt McClure expanding existing Resources and through new discoveries
in untested stratigraphic positions
Well-funded And Technically Driven
exploration that is focused on making significant discoveries
26
For further info
Contact Tim Kennedy
+61 (0)8 9389 9021
yandal@yandalresources.com.au
Or come chat at the YRL Booth
Lvl 1, Suite 5, 62 Ord St West Perth, WA, 6005
ASX:YRL
yandalresources.com.au
27
YANDAL RESOURCES LIMITED
Relevant Previous Announcements
Further details relating to the information provided in this Presentation can be found in the following Yandal Resources Limited ASX announcements:
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Drilling at Oblique Confirms Large Scale Potential (25/10/2023)
Ironstone Well-Barwidgee Drilling Update (20/09/2023)
Operations Update (25/08/2023)
HMS Sulphur RC Drilling Defines Shallow Mineralisation (17/07/2023)
Strategic Tenement Acquisition Expands Gordons Project (19/06/2023)
AC drilling extends key mineralised structures - Yandal Belt (08/06/2023)
Initial Mineral Resource Estimate at Gordons Dam (06/04/23)
RC drilling at Mt McClure intersects high-grade gold (23/02/2023)
Encouraging drill results at Mt McClure (17/11/2022)
Phase 1 Resource Expansion Drilling Program at Mt McClure (08/11/2022)
Resource Update boosts Yandal's gold inventory to 404,000oz (20/09/2022)
Initial Mineral Resource Estimate of 75,000oz Au at Success (06/09/2022)
Initial Resource Estimate of 44,000oz Au at Challenger (22/08/2022)
New High Grade Gold Drill Results - Gordon's Project (11/07/2022)
New High-Grade Intercept - Malone Gold Prospect (23/02/2022)
Exploration Update - Gordons Gold Project (12/01/22)
High-Grade Depth Extension Confirmed at Star of Gordon (01/12/21)
Newport Gold Anomaly Underscores Yandal Belt Potential (17/11/21)
High-Grades Intersected - Gordons Gold Project (28/09/21)
Discovery Potential Confirmed - Malone Gold Project (11/08/21)
Exploration Update (01/07/21)
Exploration Update - Gordons Gold Project (27/05/21)
Further Promising Intercepts - Gordons Gold Prospect (13/04/21)
New Lode Confirmed - Mt McClure Gold Project (23/03/21)
High-Grade Gold Intercepts - Flinders Park Prospect (09/03/21)
Multiple High-Grades Confirm Shallow Gold Discovery (03/02/21)
Exploration Update - Gordons Gold Project (24/02/21)
Mineral Resource Update - Flushing Meadows Gold Deposit (04/11/20)
Development Update - Flushing Meadows Gold Deposit (23/09/20) Exploration
Update - Yandal Belt Gold Projects (06/07/20)
• Exploration Update - Flushing Meadows Gold Prospect (23/06/20)
• Air-core Drilling Results at Gordons Gold Project (06/05/19)
• Replacement Prospectus (12/12/18)
•
•
•
•
•
•
ASX: YRL | YANDALRESOURCES. COM. AU
28
YANDAL RESOURCES LIMITED
MINERAL RESOURCE SUMMARY
Due to the effects of rounding, totals may not represent the sum of the individual components. 1- Reported above 0.5g/t Au lower cut-off
grade; refer to Yandal Resources Ltd ASX announcement dated 4 November 2020 for full details. 2- Reported above 1.0g/t Au lower cut-off grade;
refer to Yandal Resources Ltd ASX announcement dated 22 August 2022 for full details. 3- Reported above 1.0g/t Au lower cut-off grade; refer to
Yandal Resources Ltd ASX announcement dated 6 September 2022 for full details. 4- Reported above 1.0g/t Au lower cut-off grade; refer to Yandal
Resources Ltd ASX announcement dated 20 September 2022 for full details. 5- Reported above 0.5g/t Au lower cut-off grade; refer to Yandal
Resources Ltd ASX announcement dated 3 October 2022 for full details. 6- Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources
Ltd ASX announcement dated 3 October 2022 for full details. 7- Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX
announcement dated 3 October 2022 for full details. 8- All Resources are reported as global estimates, not constrained by optimised pit shells.
ASX: YRL | YANDALRESOURCES. COM. AU
29
IRONSTONE WELL & BARWIDGEE
Appendix 1: Exploration Target
The potential quantity and grade of the exploration target is conceptual in nature and,
therefore, is an approximation. There has been insufficient exploration to estimate a Mineral
Resource, and it is uncertain if further exploration will result in the estimation of a Mineral
Resource. The exploration target is based on the current geological understanding of the
mineralisation geometry, the continuity of mineralisation and the regional geological setting.
This understanding is driven by an extensive drill hole database, aerial magnetic data and
regional mapping, coupled with the current level of understanding of mineralisation across the
four prospects. The Exploration Target has been prepared and reported in accordance with
the 2012 edition of the JORC Code.
The lower range target grade was derived from the average grade of intercepts, including
RAB/AC, which increased by 20%, based on the assumption that the grade improved
moderately with depth. The upper range target grade was based on the same value but
increased by 50%, assuming a significant improvement in grade with depth. The strike length for
the upper range target was also increased to reflect the increased strike length of
mineralisation identified in broad-spaced RC drilling based on the results from the recently
completed RC program. There is evidence for several parallel mineralised structures across the
Oblique Prospect. For the lower-range target, only a single structure was applied; however, for
the upper-range target, three mineralised structures were applied.
Prospect Exploration Target Assumptions
Quarter Moon
Oblique
The Exploration Target for the Quarter Moon Prospect was derived from a limited amount of RC
and AC/RAB drilling that is insufficient to define a Mineral Resource Estimate but provides some
indication of the volume and grade of potential mineralisation. Historic RC drilling across
Oblique was completed on 100m spaced sections across 700m of strike, in addition to AC/RAB
drilling on a similar spacing. Historic RC drilling tests mineralisation down to a maximum vertical
extent of 140m. Historic RC drilling has been validated by limited YRL RC drilling.
The Exploration Target for the Oblique Prospect was derived from a limited amount of RC and
AC/RAB drilling that is insufficient to define a Mineral Resource Estimate but provides some
indication of the volume and grade of potential mineralisation. Historic RC drilling across
Oblique was completed on approximately 100m spaced sections across 700m of strike, in
addition to AC/RAB drilling on a similar spacing. Historic RC drilling tests mineralisation to a
maximum vertical extent of 140m. Historic RC drilling has been validated by limited YRL RC
drilling.
The mineralisation strike was derived from the extent of >1.0 g/t intercepts across the prospect
based on drilling prior to the recently completed RC program. The average width of significant
intercepts (>0.3 g/t) was used as an assumption for the width of mineralisation, which was then
projected down dip by 250m (approximately 200m vertical). The volume was converted to a
tonnage range by using a density of 2.5 g/cm3 for the lower range and 2.6 g/cm3 for the
upper range, assuming deeper and shallower weathering, respectively, within a chert
dominant host (oxide + transitional material to 100m down dip, fresh to 200m down dip).
The mineralisation strike was derived from the extent of >1.0 g/t intercepts across the prospect.
The average width of significant intercepts (>0.3 g/t) was used as an assumption for the width
of mineralisation, which was then projected down dip by 250m (approximately 200m vertical).
The volume was converted to a tonnage range by using a density of 2.5 g/cm3 for the lower
range and 2.7 g/cm3 for the upper range, assuming deeper and shallower weathering,
respectively, within a basalt or dolerite host (oxide + transitional material to 100m down dip,
fresh to 200m down dip.
ASX: YRL | YANDALRESOURCES. COM. AU
30
IRONSTONE WELL & BARWIDGEE
Appendix 1: Exploration Target (Continued)
The lower range target grade was derived from the average grade of intercepts, including
RAB/AC, which increased by 20%, based on the assumption that the grade improved
moderately with depth. The upper range target grade was based on the same value but
increased by 50%, assuming a significant improvement in grade with depth. There is evidence
for parallel mineralised structures across the Quarter Moon Prospect, which are poorly tested.
For the lower-range target, only a single structure was applied; however, for the upper-range
target, two mineralised structures were applied.
Flushing Meadows
The exploration target for the Flushing Meadows was derived by extending a portion of the
current Mineral Resource Estimate for the deposit down dip an additional 80-120m to an
approximate vertical depth of 200m; a depth consistent with open-cut extraction methods. An
average density of 2.6g/cm3 was applied to the volume, assuming material at depth will be
transitional to fresh, with a density of 2.52 g/cm3 and 2.7 g/cm3 being applied for transitional
and fresh rock in the 2020 MRE, respectively. Flushing Meadows exhibits several parallel
mineralised structures; for the low-range assumption, only a single mineralised volume was
extended beyond the current bounds of the MRE. For the upper range, two additional
mineralised structures were projected down to 200m vertical. The grade for the lower range
was based on the average of mineralised intercepts >0.5g/t Au below a depth greater than
50m from the surface within YRL RC drilling. The upper range grade assumes a moderate 25%
increase in grade within fresh rock at depth.
The above exploration target for Flushing Meadows does not include the Current Mineral
Resource Estimate of 268,000 Oz @ 1.1 g/t Au (see ASX; YRL release dated 4th of November
2020).
New England Granite
The Exploration Target for the New England Granite
Share your feedback
Discover