Arrakis RC Results Show High-Grade Mineralisation Potential
Released
Released
Announcement PDF
Contact Us
A: Suite 1, Level 3, 1138 Hay Street,
West Perth WA 6005
T: +61 (0)8 9389 9021
E: yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL
Board and Management
Chris Oorschot Managing Director/CEO
Greg Evans Non-Exec Chair
Katina Law Non-Exec Director
Chris Newman Non-Exec Director
Greg Fitzgerald Company Secretary
Arrakis RC Drilling Results Highlight Potential
High-Grade Gold Mineralisation Continuity
RC Drilling Highlights
• Yandal has received assays from 10 of 17 RC holes drilled in late 2025.
• Significant Intercepts include:
o 24m*1 @ 1.3g/t Au from 136m in 25IWBRC0051, including
7m @ 2.8g/t Au from 137m
o 18m*1 @ 1.6g/t Au from 45m in 25IWBRC0056, including
9m @ 2.9g/t Au from 45m
o 8m*1 @ 2.7g/t Au from 95m in 25IWBRC0054, including
6m @ 3.3g/t Au from 96m
o 6m*1 @ 1.8g/t Au from 159m in 25IWBRC0053, including
3m @ 3.1g/t Au from 159m
Strategic Implications and Exploration Momentum
• The collective results demonstrate mineralisation occurs in consistent
positions, where higher gold grades are associated with the eastern
hanging-wall contact, providing underground exploration potential.
• Results also demonstrate the potential for shallow oxidised mineralisation
close to the surface below the 4-20m of transported cover.
Next Steps - Arrakis
• Planned closer-spaced drilling will focus on defining and extending the
thicker and higher-grade gold zones within the identified 2.2km-long
mineralised system.
• RC and diamond drilling to re-commence in March with assays from the
remaining 7 RC holes and a recent air-core program due shortly.
ASX Announcement
15 January 2026
*1 Estimated true width is approximately 60% of the down-hole length
For further information or to ask questions in relation to this announcement, please
visit our Investor Hub at https://yandalresources.com.au/link/P2zNVP
yandalresources.com.au | ASX:YRL 2
Commenting on the new results, Yandal Resources’ Managing Director, Mr. Chris Oorschot,
said: “It is great to observe regular consistency in the position and continuity of
higher-grade mineralisation across the Arrakis gold discovery. The higher-grade
mineralisation associated with the eastern hanging-wall provides an opportunity
for Yandal to target and explore for underground mineralisation.
We have also seen evidence of shallow oxide mineralisation, a strategically
important outcome as we look to consolidate recent discoveries and build Mineral
Resources across 2026.
The Team aims to establish the new exploration camp in February to support the
recommencement of drilling by March. Programs are being finalised to advance
exploration across Arrakis, Flushing Meadows and the New England Granite target
area. With the strong cash position and improved infrastructure, we will be aiming
to accelerate exploration following the end of the wet season.”
Yandal Resources Ltd (ASX: YRL, “Yandal Resources” or the “Company”) is pleased to
provide an exploration update for the Arrakis Prospect within the Ironstone Well-Barwidgee
Gold Project (see Figures 5 and 6). A 17-hole, 3,800m RC program was completed in mid-
December across the Arrakis Prospect, testing the mineralised trend along 200m-spaced infill
drill lines. Assay results from the first ten holes have been received and reported (see Figures
2 and 3). RC results confirm a mineralised system with a relatively simple, predictable
geometry, with higher-grade mineralisation occurring in a consistent position along strike and
down dip. Several closer-spaced holes drilled to assess mineralisation continuity and
potential high-grade plunge geometries were also completed, with results showing strong
mineralisation continuity along strike. Results also demonstrate the potential for shallow oxide
mineralisation immediately below the unmineralised transported cover.
In addition to RC drilling results, further results from the 2025 Arrakis diamond drilling program
have also been received. The diamond drilling program comprised four re-entries (diamond
tails to previously reported RC holes) and four new holes drilled for a total of 1,931m. Results
from a further three of the eight diamond holes have been received, with two holes yet to
be reported. Results from diamond drilling have further confirmed the extensive strike nature
of the Arrakis mineralised structure and provide invaluable geological and structural data to
support ongoing exploration across the Arrakis gold discovery.
yandalresources.com.au | ASX:YRL 3
Figure 1: 6,350mN cross-section showing all drilling results from 25IWBRC0053, 25IWBRC0054
and 25IWBRC0056, highlighting the strong high-grade continuity on the eastern hanging-wall
contact of the Arrakis trend. The section location is shown in Figure 2. The section shows all
drilling within +/- 50m of the section plane.
Cross-Section
6,350mN
northwest facing
Transported Cover
Surface
BOCO
Dolerite
TOFR
18m @ 1.6g/t Au
Incl. 9m @ 2.9g/t Au
Pillow
Basalt
8m @ 2.7g/t Au
Incl. 6m @ 3.3g/t Au
6m @ 1.8g/t Au
Incl. 4m @ 2.6g/t Au
yandalresources.com.au | ASX:YRL 4
Arrakis RC Drilling Results
Assay results from the first ten Arrakis RC holes have been received, with results from a further
seven holes yet to be received. The program was designed to map out the extent of the Arrakis
mineralised system by targeting the structure and host stratigraphy across 200m spaced sections
ahead of closer spaced drilling scheduled to commence in March 2026. Intercepts from the
6,350mN section (see Figures 1, 2 and 3) include:
o 6m @ 1.8g/t Au from 159m in 25IWBRC0053, including
3m @ 3.1g/t Au from 159m
o 8m @ 2.7g/t Au from 95m in 25IWBRC0054, including
6m @ 3.3g/t Au from 96m
o 18m @ 1.6g/t Au from 45m in 25IWBRC0056, including
9m @ 2.9g/t Au from 45m or
3m @ 6.9g/t Au from 45m
Intercepts from the 6,750mN section include:
o 18m @ 0.6g/t Au from 127m in 25IWBRC0048, including
3m @ 2.0g/t Au from 141m
o 12m @ 0.6g/t Au from 246m in 25IWBRC0049, including
3m @ 1.6g/t Au from 248m
Results from these two sections highlight:
• A laterally continuous northwest striking mineralised structure that maintains a consistent
sub-vertical geometry.
• The potential for shallow oxide mineralisation below a thin veneer of transported cover.
The continuous nature of mineralisation and relatively simple geometry provide the Company
with increased confidence in the geological model underpinning the Arrakis Prospect.
Furthermore, the consistent presence of higher-grade mineralisation along the eastern margin
provides an opportunity to target deeper, higher-grade mineralisation as drilling advances in
2026.
RC holes 25IWBRC0049 and 25IWBRC0051 are located along strike of the drilling on the previously
reported 6,150mN section (see Figure 3). These two RC holes and one diamond pre-collar were
drilled in order to provide an initial assessment of mineralisation continuity along strike. Significant
intercepts include:
yandalresources.com.au | ASX:YRL 5
o 24m @ 1.3g/t Au from 136m in 25IWBRC0051, including
7m @ 2.8g/t Au from 137m
o 32m @ 0.5g/t Au from 194m in 25IWBRC0049, including
3m @ 2.1g/t Au from 194m
These results confirm strong mineralisation continuity along strike (see the longitudinal section in
Figure 3). RC pre-collar 25IWBRC0050 will be extended with a diamond tail in February.
Figure 2: A collar plan over the Arrakis Prospect within the Caladan target area, showing simplified
bedrock geology interpretation. All Yandal drilling is plotted (historic drilling has been excluded).
Collars are thematically coloured by max Au (g/t) in the hole. Dashed yellow polygons represent
air-core regolith anomalies (Results include ~4m @ 0.1 g/t Au or greater, with the upper profile or
the bottom-of-hole sample is 0.1g/t Au or greater). Dashed purple lines represent heritage-
surveyed 100m-spaced lines to support 2026 drilling.
Caladan
Fold
Arrakis
Air-core
Trend
25IWBRC0041D
37m @ 0.6 g/t Au incl.
6.5m @ 1.5g/t Au
25IWBRC0042
50m @ 1.3 g/t Au incl.
28m @ 1.9g/t Au
25IWBRC0040D
56.50m @ 1.3 g/t Au incl.
14.75m @ 3.3 g/t Au
25IWDD0011
17.7m @ 1.4g/t Au
incl. 7.95m @ 2.5g/t Au
25IWBRC0043
16m @ 1.1 g/t Au
1000m
25IWBRC0056
18m @ 1.6g/t Au from 45m
Incl. 9m @ 2.9g/t Au Incl.
3m @ 6.9g/t Au
yandalresources.com.au | ASX:YRL 6
Figure 3: A longitudinal section displaying intercept midpoints within the main Arrakis mineralised structure (intercepts from subordinate structures are
excluded). Grade accumulation (length multiplied by Au grade) is based on down-hole length, with no true width correction applied. This longitudinal section
has been prepared to show the distribution of recent intercepts across the interpreted Arrakis trend. While there is some preliminary evidence of mineralisation
continuity, additional drilling is needed to confirm mineralisation continuity on a larger scale. For this reason, grade contours and high-grade plunge
interpretations have not been applied.
Scale
250m
NORTHWEST
Surface
Arrakis
Longitudinal Section
southwest facing
SOUTHEAST
Local Grid
Arrakis Trend >2000m
25IWBRC0048
18m @ 0.6g/t Au
Incl. 3m @ 2.0g/t Au
25IWBDD0011
17.7m @ 1.4 g/t Au
Incl. 7.95m @ 2.5g/t Au
25IWBRC0041D
37m @ 0.6 g/t Au
25IWBRC0042
50m @ 1.3 g/t Au
Incl. 8m @ 2.1g/t Au &
6m @ 2.8g/t Au
25IWBRC0043
16m @ 1.1 g/t Au
25IWBRC0051
24m @ 1.3g/t Au
Incl. 7m @ 2.8g/t Au
25IWBRC0049
6m @ 1.8g/t Au
25IWBRC0040D
56.5m @ 1.3 g/t Au
Incl. 9.75m @ 4.4g/t Au
25IWBRC0052
39m @ 0.4g/t Au
Incl. 3m @ 2.1g/t Au
25IWBRC0053
6m @ 1.8g/t Au
Incl. 4m @ 2.6g/t Au
25IWBRC0054
8m @ 2.7g/t Au
Incl. 6m @ 3.3g/t Au
25IWBRC0056
18m @ 1.6g/t Au
Incl. 9m @ 2.9g/t Au
25IWBDD0012
9m @ 0.5g/t Au
yandalresources.com.au | ASX:YRL 7
Next Steps
Results from a further seven RC holes, along with the remaining diamond holes, are anticipated
over the coming weeks (see Figures 2 and 3). RC and diamond drilling are scheduled to
recommence in March once the expanded field camp has been established. Drilling will then
be completed on 100m-spaced drill lines across the Arrakis trend, along with preliminary
metallurgical test work.
Arrakis Diamond Drilling Results
Eight diamond holes were completed across the Arrakis Prospect in late 2025, testing the Arrakis
trend over more than 2km of strike. The diamond drilling program was completed to refine a
geological model for Arrakis, support exploration targeting, and future drilling. Results from three
more diamond holes are reported within this release, including 25IWBRC0036D, 25IWBRC0044D
and 25IWBDD0012 (see Figure 4). Significant intercepts from these diamond holes include:
o 9.0m @ 0.5g/t Au from 281m in 25IWBDD0012,
o 5.6m @ 0.5g/t Au from 267m in 25IWBDD0012,
o 2.8m @ 0.8g/t Au from 375m in 25IWBRC0036D.
These diamond drilling results reaffirm the current geological model and highlight the potential
for larger-scale structural controls on gold mineralisation across the more than 2.2km long Arrakis
trend.
yandalresources.com.au | ASX:YRL 8
Figure 4: 6,550mN cross-section showing all drilling results from 25IWBDD0012 with a simple
preliminary interpretation of geology. The section location is shown in Figure 2. The section
shows all drilling within +/- 50m of the section plane.
Cross-Section
6,550mN
northwest facing
Transported Cover
Surface
Dolerite
Pillow
Basalt
6m @ 0.3 g/t Au
50m @ 1.3 g/t Au incl.
28m @ 1.9 g/t Au
6m @ 0.8 g/t Au
16m @ 0.7g/t Au
12m @ 0.5 g/t Au
12m @ 1.1 g/t Au
7m @ 0.3g/t Au
5.6m @ 0.5g/t Au
5.6m @ 0.5g/t Au
yandalresources.com.au | ASX:YRL 9
Arrakis Geology & Mineralisation
The Arrakis Prospect is located at the centre of the Ironstone Well-Barwidgee Gold Project, within
the Yandal Greenstone Belt of Western Australia. The prospect is defined by a >2.2km mineralised
trend defined by air-core drilling. The prospect lies beneath between 4-20m of transported cover.
The depth of weathering varies along strike, with the base of fresh rock typically between 80-
120m from the surface.
Arrakis mineralisation is hosted within a sequence of deformed sediments that have been variably
intruded by a suite of intermediate intrusive bodies that vary in thickness both along strike and
down dip. Steeply north-east dipping mineralisation is bracketed by a sequence of pillow basalts
to the east and a dolerite unit to the west.
A compilation of RC and diamond drilling results and geological observations demonstrates two
separate styles of mineralisation at Arrakis:
• A broad lower-grade style of mineralisation hosted within a silica-sericite altered
intermediate intrusive unit that has been broadly and weakly fractured to brecciated
with chlorite-biotite-filled fractures that also contain pyrite, and with fine disseminated
pyrite throughout. The position and thickness of this intrusive vary along strike and down
dip.
• A higher-grade style of mineralisation that is associated with a more intense level of
brittle-ductile deformation and strong silica-pyrite alteration appears to be strata-bound
and linked to the hanging wall or eastern margin of the host stratigraphy. This style of
mineralisation can also be sheared and intercalated (mixed) with the bounding basalts
and dolerites.
Structural observations from diamond drilling indicate significant strike slip, sinistral shearing.
Mineral lineations broadly plunge shallowly to the northwest. Two dominant ductile shear fabrics
have been observed: a subparallel fabric and a shallower-dipping, northwest-striking fabric (see
Figure 4). The latter often exhibits as a mylonite and may offset or structurally thin mineralisation.
The position of the intermediate intrusion and the thickness of the higher-grade mineralisation are
likely to be structurally controlled.
yandalresources.com.au | ASX:YRL 10
Looking Ahead
The Company maintains a strong cash position and a very active exploration schedule
across 2026. Notable near-term activities and news flow include;
Arrakis Discovery
• Further assay results from the 2025 Arrakis RC (seven holes) and diamond drilling
(two holes) program are anticipated throughout January;
• Air-core results from three 400m spaced lines southeast of Arrakis are anticipated
shortly;
• RC and limited diamond drilling across 100m lines is scheduled to commence in
March 2026;
New England Granite Target Area
• All results from AC drilling across the New England Granite target area are
anticipated shortly;
Flushing Meadows (MRE 268koz @ 1.1g/t Au, see Table 1)
• Heritage surveys are being scheduled for the March Quarter;
Key Exploration Infrastructure
• Operational and scheduling preparations are underway for a ramp-up of
exploration following the wet season in Q1 CY2026, including the establishment
of a 21-person camp and the expansion of the operational team.
Authorised by the board of Yandal Resources
For further information, please contact:
Chris Oorschot
Managing Director
Yandal Resources Limited
yandal@yandalresources.com.au
Greg Fitzgerald
Company Secretary
+61 8 9389 9021
yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL 11
About Yandal Resources Limited
Yandal Resources has a portfolio of advanced gold exploration projects in the highly prospective Yandal
and Norseman-Wiluna Greenstone Belts of Western Australia.
Ironstone Well-Barwidgee Gold Project
The 100% owned Ironstone Well-Barwidgee (IWB) Gold Project covers approximately 370km² of highly
prospective and under-explored tenure located between the Jundee and Bronzewing mines in the
northern Yandal Greenstone Belt. Yandal has an established Resource of 268,000oz of gold at Flushing
Meadows (within IBW) and considers there to be strong potential to make new discoveries and expand
this resource base within its extensive tenure holding. (Refer to the ASX announcement of 4 November
2020 for details of the Flushing Meadows Resource).
The IWB project area also includes two new gold discoveries, the Arrakis and Siona Prospects, both made
within the last twelve months. These outcomes were driven by the execution of a targeted exploration
program that followed a systematic, geologically driven strategy that was developed in early 2023. The
Arrakis prospect is hosted within the Caladan fold, and the Siona prospect is hosted within the New
England Granite.
Both discoveries are currently at an early stage but progressing well, with future activities focused on
delineating the scale of each of the newly defined mineralised systems.
The IWB Gold Project also includes several advanced prospects, where limited historic and YRL drilling has
returned robust gold intercepts, indicating the potential for shallow oxide mineralisation. Both the early-
stage and more advanced prospects are the focus of ongoing exploration.
Mt McClure
The Mt McClure Gold Project, acquired in August 2022, is located ~15km southwest of the historic
Bronzewing Mine and includes three mining leases with JORC 2012 Resources totalling 81,675oz Au.
The project has prospectivity for new shallow gold deposits adjacent to current Resources and in the
footwall and hanging wall of the stratigraphy. Ground gravity survey data from the prior Quarter support
ongoing structural/stratigraphic interpretations for 2026 targeting.
yandalresources.com.au | ASX:YRL 12
Figure 5: Yandal Resource exploration Project locations within the Yandal
Greenstone Belt. The Arrakis Prospect is located within the Caladan target area.
King of the Hills
Thunder Box
Darlot
Bellevue
Kathleen Valley
Mt Keith
Wiluna
Jundee
Bronzewing
Wiluna
Leinster
Ironstone Well-
Barwidgee
Mt McClure
NEG |Siona Discovery
Flushing
Meadows Caladan | Arrakis Discovery
0 20 40 60 80km
yandalresources.com.au | ASX:YRL 13
Figure 6: Yandal Resource exploration target areas and prospect locations within the northern
Yandal Greenstone Belt. The Arrakis Prospect is located within the Caladan target area.
yandalresources.com.au | ASX:YRL 14
Table 1 – Yandal Resources Ltd - Mineral Resource Summary
Deposit
Indicated Inferred Total
Tonnes
(‘000s)
Grade
(g/t)
Au
(oz)
Tonnes
(‘000)
Grade
(g/t)
Au
(oz)
Tonnes
(000’s)
Grade
(g/t)
Au
(Oz)
Ironstone Well
Flushing Meadows1 2,141 1.3 91,000 5,245 1.1 177,000 7,386 1.1 268,000
Mt McClure
Challenger2 718 1.9 44,000 718 1.9 44,000
Success3 1,255 1.9 75,000 1,255 1.9 75,000
Parmelia4 252 2.1 17,000 252 2.1 17,000
HMS Sulphur5 1010 1.2 39,000 1010 1.2 39,000
Gilmore6 134 1.7 7,200 134 1.7 7,200
Sub-total - MMC 3,369 1.7 182,200 3,369 1.7 182,200
Grand-total7 2,141 1.3 91,000 8,614 1.3 359,200 10,755 1.3 450,200
Due to the effects of rounding, totals may not represent the sum of the individual components.
1. Reported above 0.5g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 4 November 2020 for full
details. 2. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 22 August 2022 for
full details 3. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 6 September
2022 for full details. 4. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 20
September 2022 for full details. 5. Reported above 0.5g/t Au lower cut-off grade within this announcement 6. Reported above 1.0g/t
Au lower cut-off grade within this announcement. 7. All Resources are reported as global estimates, not constrained by optimised pit
shells.
Competent Person Statement
The information in this document related to Exploration Targets and Exploration Results, geology and data
compilation is based on information reviewed or compiled by Mr Christopher Oorschot, a Competent
Person who is a Member of The Australasian Institute Geoscientists. Mr Oorschot is the Managing Director
of the Company, is a full-time employee and holds shares and options in the Company. Mr Oorschot has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Oorschot consents to the inclusion in this announcement of the matters based on this information in the
form and context in which it appears.
The information in this announcement that relates to the Flushing Meadows and Mt McClure Mineral
Resource Estimates is based on information compiled and generated by Andrew Bewsher, an employee
of BM Geological Services Pty Ltd (“BMGS”). Both Andrew Bewsher and BMGS hold shares in the company.
BMGS consents to the inclusion, form and context of the relevant information herein as derived from the
original resource reports. Mr Bewsher has sufficient experience relevant to the style of mineralisation and
type of deposit under consideration and to the activity which is being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the JORC ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’.
YRL confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
yandalresources.com.au | ASX:YRL 15
Forward Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include, but
are not limited to, statements concerning Yandal Resources Limited’s (Yandal’s) current expectations,
estimates and projections about the industry in which Yandal operates, and beliefs and assumptions
regarding Yandal’s future performance. When used in this document, words such as “anticipate”, “could”,
“plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are
forward-looking statements. Although Yandal believes that its expectations reflected in these forward-
looking statements are reasonable, such statements are subject to known and unknown risks, uncertainties
and other factors, some of which are beyond the control of Yandal and no assurance can be given that
actual results will be consistent with these forward-looking statements. Drilling results presented indicate
geological potential for mineralisation but there can be no certainty that these results will eventually form
part of a Mineral Resource Estimate.
Table 2 – Arrakis RC drilling program collar location summary. Please note that collars have not yet
been formally surveyed; the coordinates below are derived from a handheld GPS and are
accurate to within +/- 5m.
Hole ID
Hole
type
East
(m)
North
(m)
RL
(mAHD)
Azimuth
(degrees)
Dip
(degrees)
Total
Depth
(m)
25IWBRC0047 RC 286919 7027443 522.7 222 -60 172
25IWBRC0048 RC 286989 7027499 522.6 222 -60 238
25IWBRC0049 RC 287037 7027557 522.5 222 -57 292
25IWBRC0050 RC 287365 7027022 523.4 60 -57 262
25IWBRC0051 RC 287487 7027164 523.2 195 -58 240
25IWBRC0052 RC 287500 7027174 523.2 245 -57 252
25IWBRC0053 RC 287314 7027263 522.5 225 -60 226
25IWBRC0054 RC 287289 7027235 522.6 222 -60 184
25IWBRC0055 RC 286086 7028293 523.1 222 -60 184
25IWBRC0056 RC 287261 7027207 522.8 222 -60 202
25IWBRC0057 RC 286031 7028235 523.4 222 -60 160
25IWBRC0058 RC 287655 7027037 523.5 220 -60 269
25IWBRC0059 RC 286142 7028350 522.9 222 -60 298
25IWBRC0060 RC 287627 7027009 523.6 222 -60 232
25IWBRC0061 RC 287758 7026851 524.1 222 -60 220
25IWBRC0062 RC 287951 7026768 524.6 222 -60 148
25IWBRC0063 RC 286452 7028092 522.5 222 -60 238
Table 3 – Arrakis diamond drilling program collar location summary. Please note that collars have
not yet been formally surveyed; the coordinates below are derived from a handheld GPS and are
accurate to within +/- 5m.
Hole ID
Hole
type
East
(m)
North
(m)
RL
(mAHD)
Azimuth
(degrees)
Dip
(degrees)
Pre-collar
Depth
(m)
Total
Depth
(m)
25IWBRC0040D RCD 287381 7027046 523.3 049.6 -58.8 162 304
25IWBRC0041D RCD 287513 7027189 523.2 228.6 -57.6 186 294
25IWBRC0044D RCD 286563 7027921 523.0 230.9 -59.9 168 216
25IWBRC0046D RCD 288075 7026618 525.1 230.9 -60.1 210 370
25IWBDD0011 DD 287541 7027217 523.0 229.6 -59.7 N/A 369
yandalresources.com.au | ASX:YRL 16
Hole ID
Hole
type
East
(m)
North
(m)
RL
(mAHD)
Azimuth
(degrees)
Dip
(degrees)
Pre-collar
Depth
(m)
Total
Depth
(m)
25IWBDD0012 DD 287207 7027427 522.5 230.1 -58.7 N/A 360
25IWBRC0036D RCD 286954 7027757 523.0 228.4 -60.0 138 456
25IWBDD0013 DD 286061 7027962 525.0 46.9 -60.1 N/A 417
Table 4 – Arrakis Prospect - Summary of significant RC and diamond core assay results >0.3g/t Au with
no more than 4m of continuous internal waste included unless otherwise stated. All intercept lengths are
reported as down-hole lengths.
Hole
ID
Sample
type / Sub
Interval
From
(m)
To
(m)
Interval
(m)
Au
(g/t)
Comment
25IWBRC0036D HQ Core 151.95 152.5 0.55 0.6 Weakly weathered
25IWBRC0036D HQ Core 156.8 161.95 5.15 0.3 Weakly weathered
25IWBRC0036D HQ Core 374.95 377.7 2.75 0.8 Fresh rock
25IWBRC0044D HQ Core NSA
25IWBDD0012 HQ Core 238 239 1 0.8 Fresh rock
25IWBDD0012 HQ Core 245 252 7 0.3 Fresh rock
25IWBDD0012 HQ Core 267 272.55 5.55 0.5 Fresh rock
25IWBDD0012 HQ Core 281 290.05 9.05 0.5 Fresh rock
25IWBRC0048 1m RC 115 116 1 0.5 Weakly weathered
25IWBRC0048 1m RC 127 133 6 0.6 Weakly weathered
25IWBRC0048 1m RC 141 145 4 1.7 Weakly weathered
25IWBRC0048 Alternative 127 145 18 0.6 Using a lower >0.1g/t Au lower cut-off
25IWBRC0048 1m RC 154 157 3 0.7 Fresh rock
25IWBRC0049 1m RC 229 231 2 0.3 Fresh rock
25IWBRC0049 1m RC 238 239 1 0.4 Fresh rock
25IWBRC0049 1m RC 246 258 12 0.6 Fresh rock
25IWBRC0049 including 248 251 3 1.6 Fresh rock
25IWBRC0047 1m RC NSA Drilled west of the structure
25IWBRC0050 1m RC NSA Diamond pre-collar
25IWBRC0051 1m RC 61 62 1 0.8 Moderately weathered
25IWBRC0051 1m RC 66 67 1 0.3 Moderately weathered
25IWBRC0051 1m RC 77 78 1 0.3 Moderately weathered
25IWBRC0051 1m RC 87 91 4 1.7 Moderately weathered
25IWBRC0051 1m RC 136 160 24 1.3 Fresh rock
25IWBRC0051 Including 137 144 7 2.8 Fresh rock
25IWBRC0051 1m RC 204 206 2 0.4 Fresh rock
25IWBRC0051 1m RC 216 217 1 0.5 Fresh rock
25IWBRC0052 1m RC NSA 0
25IWBRC0053 1m RC 159 165 6 1.8 Fresh rock
25IWBRC0053 Including 159 162 3 3.1 Fresh rock
yandalresources.com.au | ASX:YRL 17
Hole
ID
Sample
type / Sub
Interval
From
(m)
To
(m)
Interval
(m)
Au
(g/t)
Comment
25IWBRC0054 1m RC 95 103 8 2.7 Moderately weathered
25IWBRC0054 Including 96 102 6 3.3 Moderately weathered
25IWBRC0055 1m RC 97 98 1 0.3 Weakly weathered
25IWBRC0056 1m RC 45 63 18 1.6 Completely weathered
25IWBRC0056 Including 45 54 9 2.9 Completely weathered
25IWBRC0056 1m RC 84 95 11 0.6 Moderately weathered
25IWBRC0056 1m RC 105 107 2 0.4 Moderately weathered
Relevant Previous ASX Announcements
yandalresources.com.au | ASX:YRL 18
• Arrakis Diamond Drilling Delivers Strong Results, 8 December 2025
• First Arrakis Diamond Results & RC Drilling Underway, 24 November 2025
• Final Arrakis RC Results with Diamond Drilling to Commence, 13 October 2025
• Arrakis Gold Discovery Extended by 400m, 24 September 2025
• Arrakis Gold Discovery Confirmed With 54m @ 1.2g/t Au, 22 September 2025
• Arrakis RC Drilling Complete & All AC Results Now Received, 17 September 2025
• RC Drilling Commences Across Arrakis, 1 September 2025
• Arrakis Extended to Over 2.2km in Strike, 18 August 2025
• Caladan AC Results Further Extend Arrakis Mineralisation, 31 July 2025
• Caladan AC Shows Early Signs of Scale, 10 July 2025
• Caladan Air-Core Drilling Program Commences, 5 June 2025`
• RIU Sydney Presentation, 7 May 2025
• Arrakis RC Drilling Results, 30 April 2025
• Ironstone Well-Barwidgee Exploration Update, 25 February 2025
• Caladan Air-Core Drilling Demonstrates Discovery Potential, 15 January 2025
• Air-core Drilling Commences Across Caladan and Irulan, 10 October 2024
• Oblique Diamond Drilling Results, 3 September 2024
• IWB Soil Results and NEG Diamond Drilling Complete, 12 August 2024
• Large-scale Gold Anomalies Across Emerging Targets, 15 July 2024
• Gold Coast Investment Showcase Presentation, 20 June 2024
• Exploration Update – IWB Ground Gravity Survey, 11 June 2024
ASX Announcement 15 January 2026 Page 19
Appendix 1 – Ironstone Well-Barwidgee Gold Project, Arrakis Diamond Drilling
JORC Code (2012) Table 1, Sections 1 and 2
Mr Christopher Oorschot, Managing Director of Yandal Resources, compiled the information in Section 1 and Section 2 of the following JORC Table 1 and
is the Competent Person for those sections. The following Table and Sections are provided to ensure compliance with the JORC Code (2012 edition)
requirements for the reporting of Exploration Results.
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
• Yandal Resources has completed RC drilling along several 200m spaced lines across the Arrakis
Prospect, mineralisation associated with a >2.2km air-core trend. The drilling involved a 139mm
face sampling bit down to between 148m and 292m. Holes were drilled at an angle of -60 ° to
the southwest or northeast.
• Yandal Resources (YRL) RC drilling samples were collected via a rig-mounted static cone
splitter, splitting approximately 12.5% of the total sample volume. Two splits are collected for
each metre: a primary and a duplicate sample. The primary 1m samples are then sent to a lab
for further analysis. The duplicate samples are retained on-site unless they are submitted as
routine duplicates.
• Yandal Resources has completed diamond drilling across the Arrakis Prospect. The drilling
involved a mix of RC pre-collars or rock-rolling down to fresh rock, followed by HQ (diameter of
~63.5mm) diamond core drilling to an avera
Share your feedback
Discover