Interim Financial Report
for the half-year ended
31 December 2023
Interim Financial Report for the half-year ended 31 December 2023
Contents
Corporate Directory ..................................................................................................................... 1
Directors’ Report ......................................................................................................................... 2
Auditor’s Independence Declaration .......................................................................................... 12
Independent Auditor's Review Report ....................................................................................... 13
Directors’ Declaration ................................................................................................................ 15
Condensed Statement of Profit or Loss and Other Comprehensive Income .............................. 16
Condensed Statement of Financial Position .............................................................................. 17
Condensed Statement of Changes in Equity ............................................................................. 18
Condensed Statement of Cash Flows ....................................................................................... 19
Notes to the Interim Financial Statements ................................................................................. 20
Interim Financial report for the half-year ended 31 December 2023
Corporate Directory
DIRECTORS
Greg Evans
Non-Executive Chairman
Katina Law
Non-Executive Director
Tim Kennedy
Managing Director
Chris Oorschot
Technical Director (appointed 22 September 2023)
COMPANY SECRETARY
Greg Fitzgerald
PRINCIPAL AND REGISTERED OFFICE
Unit 5/62 Ord Street
West Perth WA 6005
Telephone: +61 8 9389 9021
Email:
yandal@yandalresources.com.au
Web:
www.yandalresources.com.au
AUDITORS
HLB Mann Judd (WA Partnership)
Level 4, 130 Stirling Street
Perth WA 6000
SHARE REGISTRY
Automic
Level 5, 191 St George’s Terrace
Perth WA 6000
STOCK EXCHANGE LISTING
Australian Securities Exchange
Home Exchange: Perth
Code: YRL
1
Interim Financial report for the half-year ended 31 December 2023
Directors’ Report
Figure 1 Yandal’s Project Locations.
2
Interim Financial report for the half-year ended 31 December 2023
Directors’ Report
The Directors of Yandal Resources Limited (“Yandal Resources”) submit herewith the financial report for
the half-year ended 31 December 2023. In order to comply with the provisions of the Corporations Act 2001,
the Directors report as follows:
The names of the Directors of the Company during or since the end of the half-year are:
Greg Evans
Katina Law
Tim Kennedy
Chris Oorschot (appointed 22 September 2023)
Directors have been in office since the start of the period to the date of this report unless otherwise stated.
Operating Results
The operating loss of the Company for the six months amounted to $2,088,883 (December 2022: Restated
Loss of $2,917,743).
Review of Operations/Exploration Activity
The Company has a portfolio of strategically located highly prospective gold exploration projects within the
Tier-1 gold producing Yandal and Norseman-Wiluna Greenstone Belts of Western Australia (Figure 1).
Target generation and drilling programs have identified numerous areas that are under explored, have very
favourable geological, geochemical and geophysical attributes and hold excellent potential for new
discoveries.
Exploration was progressed at all projects during the past six months, with drilling activity focussed on
Ironstone Well - Barwidgee and Mt McClure in the Yandal Belt.
Ironstone Well - Barwidgee
The 100% owned Ironstone Well-Barwidgee Project (IWB) covers approximately 370km2 of contiguous,
highly prospective and under-explored tenure located between the Jundee and Bronzewing mines, both
owned by Northern Star (ASX: NST) in the northern Yandal Belt (Figure 2).
During the period the Company completed a project-wide review and ranking exercise of all prospects and
targets within the IWB tenement holdings. The purpose of this exercise was to highlight those prospects
that had the highest potential, based on current information, for the discovery of a significant orebody. The
outcome of this review was to highlight the relatively advanced Oblique and Quarter Moon prospects in the
northern part of the project and the earlier stage but potentially large-scale New England Granite prospect
towards the southern end of the project. Exploration Target sizes were developed for each of these prosects
as part of the review process, the details of which were released to the ASX on 25 October 2023.
Two RC drilling programs for a total of 27 RC holes and three re-entries (4,345m) were completed at Oblique
to test previous historic intercepts and gain an understanding of the stratigraphic and structural controls on
mineralisation.
These programs successfully confirmed broad zones of gold mineralisation associated with structures within
a complex volcano-sedimentary and intrusive stratigraphic package. The prospect is coincident with a
distinct aeromagnetic anomaly interpreted to be due to a 20-35m wide chlorite-magnetite altered
volcaniclastic unit.
3
Interim Financial report for the half-year ended 31 December 2023
Directors’ Report
Figure 2 – Ironstone Well and Barwidgee gold project geological interpretation map including prospects,
key structures.
4
Interim Financial report for the half-year ended 31 December 2023
Directors’ Report
Assay results highlighted the presence of multiple mineralised structures cross-cutting the magnetic
stratigraphy. Notable intercepts include:
•
24m @ 1.8 g/t Au from 60m (YRLRC1177),
•
3m @ 11. 4g/t Au from 102m (YRLRC1175),
o
•
9m @ 1.9 g/t Au from 63m (YRLRC1171),
o
•
including 2m @ 16.9g/t Au from 102m
including 2m @ 6.5g/t Au from 66m
13m @ 1.1g/t Au from 93m (YRLRC1169)
Geological interpretation of results suggests a large structure, designated OBL01, as a major prospect scale
control on mineralisation. Significantly, this structure is essentially un-tested to the northwest and southeast,
potentially opening up additional exploration targets peripheral to the main Oblique mineralisation trend.
Results
justify
further
exploration with future
programs to focus on
identifying
new
and
extending
known
mineralised
structures,
with a particular focus on
where these structures
interact with magnetite-rich
stratigraphy. An initial
diamond drilling program is
scheduled for March/April
2024 to provide detailed
information regarding the
host
stratigraphy,
structures, intrusive types
and the nature of the
magnetite-rich unit across
the Oblique Prospect.
Initial drill tests at Quarter
Moon and New England
Granite are planned for the
same period.
Figure 3 - Plan of the Oblique prospect showing all collars colour-coded by max Au in
hole (g/t Au) and all new drilling (not colour-coded). Overlying a composite aerial
magnetic image of reduced to pole (1VD, non-linear) and reduced to pole (2VD, nonlinear). Interpreted surface projections of the magnetite-chlorite altered unit and the
OBL01 structure are also plotted and labelled.
5
Interim Financial report for the half-year ended 31 December 2023
Directors’ Report
Mt McClure
The Mt McClure Project is located 15km SW of the historic Bronzewing gold mine and 10km from Orelia
gold mine both owned by Northern Star Resources Ltd (ASX: NST) in the southern Yandal Belt (Figure 5).
The greater Mt McClure gold camp, which covers a strike length of some 30km and has a total gold
endowment of +1.8Moz.
Yandal’s Mt McClure Project includes several historical open cut pits including Success, Parmelia and
Challenger from which a total of approximately 100,000z of gold was mined to maximum depths of between
60 to 100m mostly in the early 1990’s at a time when the gold price was much lower than at present. Each
of these open cuts together with a number of advanced target areas lie along a 12km long prospective trend
which is located entirely on granted mining leases.
Last year the Company completed initial Mineral Resource Estimates (“MRE’s”) on the margins of the
Success, Parmelia and Challenger historic open cuts. These Resources are all situated on granted mining
leases within a short distance of the haul road infrastructure being used by Northern Star to truck ore from
the Orelia mine to the Thunderbox processing centre.
During the half year the Company completed an RC drilling program comprising 30 holes for 2,576m aimed
at testing the Resource potential of the HMS Sulphur Prospect, located immediately north of, and in the
footwall to, the Success MRE. The drilling returned a number of very positive intercepts and defined
mineralisation over a strike length of 700m to a vertical depth of 150m.
A Resource update was completed incorporating initial MRE’s from HMS sulphur and also Gilmore located
at the southern end of the project as detailed in an announcement dated 3rd October 2023.
•
•
The maiden HMS Sulphur MRE contains a total of 1,010,000t @ 1.2g/t Au for 39,000oz (> 0.5g/t
Au lower cut-off grade).
The maiden Gilmore MRE contains a total of 134,000t @ 1.7g/t Au for 7,200oz (> 1g/t Au lower
cut-off grade).
These MRE’s increased the total Mt McClure Mineral Resource Inventory to 182,200oz @ 1.7g/t Au.
Figure 4 – HMS Sulphur longitudinal section looking south-west showing block model grades and drillhole
traces with grades >0.5 g/t Au.
6
Interim Financial report for the half-year ended 31 December 2023
Directors’ Report
Figure 5 – Mt McClure project geological interpretation map including prospects, key structures
and tenure.
7
Interim Financial report for the half-year ended 31 December 2023
Directors’ Report
Gordons Project
The 100%-owned Gordons Project is located 35km north of Kalgoorlie. The project covers approximately
112km2 of tenure adjacent to operating mines at Gordon Sirdar and Mulgarrie and is close to both third party
and publicly owned haulage infrastructure. Significantly, it is located on the flank of the Scotia-Kanowna
Dome, a key regional geological feature, that is an important control on the formation of gold mineralisation,
including the multi-million ounce Kanowna Belle and Paddington deposits (Figure 7).
The project contains several prospects where previous drilling by the Company has highlighted high-grade
gold potential, notably Malone, Star of Gordon and Zoehrer. Earlier in 2023 the company commissioned a
3D geological modelling and targeting exercise over the entire Gordons Project, designed to determine the
structural and stratigraphic controls on mineralisation to enable prioritisation of future exploration activities.
This work highlighted that a key prospective feature in the region is the Gordon-Sirdar Shear Zone (“GSSZ”)
and associated splays which extend through the Gordons Project and is coincident with Star of Gordon
prospect and the nearby Gordon-Sirdar mine (Figure 6). The GSSZ is associated with a steepening of the
eastern margin of the main Scotia-Kanowna Granite Dome. This geometry provides opportunities for
enhanced fluid permeability and strain partitioning making it an ideal location for targeting larger-scale gold
mineralisation. In association with the GSSZ the study also interpreted a keel of mixed greenstones
interpreted to be similar to the
Kanowna
Belle
lithologies
extending south of the Gordons
Project. Prospects proximal to
the GSSZ have the highest
potential for large discoveries
and will be the focus of
exploration moving forward.
In response to the findings of
the
study
the
Company
acquired a new exploration
licence (E27/701 – still in
application)
covering
key
interpreted extensions of the
GSSZ and in the half year,
dedicated its efforts to reviewing
and compiling all historic
exploration
data
and
undertaking preliminary drill
targeting.
The Company
expects to commence drill
testing key targets upon grant of
E27/701, likely in the second
half of FY24.
Figure 6 – Gordons Project geological map showing tenure, previous
drilling coloured max- down-hole gold and location of interpreted
boundaries of the Gordon Sirdar Shear Zone (GSSZ)
8
Interim Financial report for the half-year ended 31 December 2023
Directors’ Report
Figure 7 – Gordons Project geological map including prospects and mines and Yandal and major
competitor tenure.
9
Interim Financial report for the half-year ended 31 December 2023
Directors’ Report
CORPORATE ACTIVITY
On 22 September 2023, the Company announced the appointment of Technical Director, Mr Chris
Oorschot to the Board effective immediately.
The following Unlisted Options were approved by shareholders at the Company’s annual general
meeting held on 28 November 2023 and issued to directors:
Greg Evans
Tim Kennedy
Katina Law
Chris Oorschot
550,000 Unlisted Options expiring on 30 November 2026 at $0.134
950,000 Unlisted Options expiring on 30 November 2026 at $0.134
450,000 Unlisted Options expiring on 30 November 2026 at $0.134
750,000 Unlisted Options expiring on 30 November 2026 at $0.134
During the period 31 December 2023, the Company completed a placement, raising $4,000,000
before costs). Tranche 1 of 30,102,665 shares were issued at a price of 5.2 cents per New Share.
Tranche 1a of 5,348,103 shares and Tranche 2 of 41,472,309 shares were issued also at a price of
5.2 cents per New Share after shareholder approval was given at the Company’s annual general
meeting held on 28 November 2023.
The Placement Shares include a free attaching New Option for every two Placement Shares
subscribed for with an exercise price of 11 cents and an expiry date of 17 November 2025.
The new capital and its application was to accelerate the Company’s exploration programs in 2024.
There were no significant changes in the state of affairs of the Company during the period.
Competent Person Statement
The information in this document related to Exploration Targets and Exploration Results, geology and data
compilation is based on information reviewed or compiled by Mr Christopher Oorschot, a Competent Person
who is a Member of The Australasian Institute Geoscientists. Mr Oorschot is the Exploration Manager and
Technical Director for the Company, is a full-time employee and holds shares and options in the Company.
Mr Oorschot has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves’. Mr Oorschot consents to the inclusion in this announcement of the matters based on this
information in the form and context in which it appears.
The information in this announcement that relates to the Flushing Meadows, Mt McClure and Gordons Dam
Mineral Resource Estimates is based on information compiled and generated by Andrew Bewsher, an
employee of BM Geological Services Pty Ltd (“BMGS”). Both Andrew Bewsher and BMGS hold shares in
the company. BMGS consents to the inclusion, form and context of the relevant information herein as
derived from the original resource reports. Mr Bewsher has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration and to the activity which is being undertaken to qualify
as a Competent Person as defined in the 2012 Edition of the JORC ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’.
YRL confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement. The company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
10
Interim Financial report for the half-year ended 31 December 2023
Directors’ Report
Forward Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include, but
are not limited to, statements concerning Yandal Resources Limited’s (Yandal’s) current expectations,
estimates and projections about the industry in which Yandal operates, and beliefs and assumptions
regarding Yandal’s future performance. When used in this document, words such as “anticipate”, “could”,
“plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are
forward-looking statements. Although Yandal believes that its expectations reflected in these forwardlooking statements are reasonable, such statements are subject to known and unknown risks, uncertainties
and other factors, some of which are beyond the control of Yandal and no assurance can be given that
actual results will be consistent with these forward-looking statements. Drilling results presented indicate
geological potential for mineralisation but there can be no certainty that these results will eventually form
part of a Mineral Resource Estimate.
Subsequent Events
•
On 9 February 2024, the Company announced that 31,208,923 ordinary shares had been issued at
a price of $0.08 per share (raising $2,496,714 before costs) to fund the expansion and further
acceleration of drilling at the Ironstone Well-Barwidgee, Mt McClure and Gordons Projects.
Apart from the above event, in the opinion of the Directors of the Company, there are no other matters or
circumstances that have arisen since 31 December 2023 that have or may significantly affect the operations,
results, or state of affairs of the Company in future financial periods.
Dividends Paid or Recommended
No dividends were paid during the period and no recommendation is made as to payments of future
dividends.
Auditor’s Independence Declaration
The auditor’s independence declaration is included on page 12 of the half-year financial report.
Signed in accordance with a resolution of directors made pursuant to s.306(3)(a) of the Corporations Act
2001.
On behalf of the Directors
Mr Tim Kennedy
Director
26 February 2024
11
AUDITOR’S INDEPENDENCE DECLARATION
As lead auditor for the review of the financial report of Yandal Resources Limited for the half-year
ended 31 December 2023, I declare that to the best of my knowledge and belief, there have been no
contraventions of:
a)
the auditor independence requirements of the Corporations Act 2001 in relation to the review;
and
b)
any applicable code of professional conduct in relation to the review.
Perth, Western Australia
26 February 2024
B G McVeigh
Partner
12
INDEPENDENT AUDITOR’S REVIEW REPORT
To the members of Yandal Resources Limited
Report on the Condensed Half-Year Financial Report
Conclusion
We have reviewed the accompanying interim financial report of Yandal Resources Limited (“the
company”) which comprises the condensed statement of financial position as at 31 December 2023, the
condensed statement of profit or loss and other comprehensive income, the condensed statement of
changes in equity and the condensed statement of cash flows for the half-year ended on that date, notes
comprising a summary of significant accounting policies and other explanatory information, and the
directors’ declaration, for the entity.
Based on our review, which is not an audit, we have not become aware of any matter that makes us
believe that the interim financial report of Yandal Resources Limited does not comply with the
Corporations Act 2001 including:
(a)
giving a true and fair view of the company’s financial position as at 31 December 2023 and of its
performance for the half-year ended on that date; and
(b)
complying with Accounting Standard AASB 134 Interim Financial Reporting and the Corporations
Regulations 2001.
Basis for conclusion
We conducted our review in accordance with ASRE 2410 Review of a Financial Report Performed by
the Independent Auditor of the Entity. Our responsibilities are further described in the Auditor’s
responsibilities for the review of the financial report section of our report. We are independent of the
company in accordance with the auditor independence requirements of the Corporations Act 2001 and
the ethical requirements of the Accounting Professional and Ethical Standards Board’s APES 110 Code
of Ethics for Professional Accountants (including Independence Standards) (the Code) that are relevant
to our audit of the annual financial report in Australia. We have also fulfilled our other ethical
responsibilities in accordance with the Code.
Responsibility of the directors for the financial report
The directors of the company are responsible for the preparation of the interim financial report that gives
a true and fair view in accordance with Australian Accounting Standards and the Corporations Act 2001
and for such internal control as the directors determine is necessary to enable the preparation of the
interim financial report that gives a true and fair view and is free from material misstatement, whether
due to fraud or error.
Auditor’s responsibility for the review of the financial report
Our responsibility is to express a conclusion on the interim financial report based on our review. ASRE
2410 requires us to conclude whether we have become aware of any matter that makes us believe that
the interim financial report is not in accordance with the Corporations Act 2001 including giving a true
and fair view of the entity’s financial position as at 31 December 2023 and its performance for the half
year ended on that date, and complying with Accounting Standard AASB 134 Interim Financial Reporting
and the Corporations Regulations 2001.
13
A review of a interim financial report consists of making enquiries, primarily of persons responsible for
financial and accounting matters, and applying analytical and other review procedures. A review is
substantially less in scope than an audit conducted in accordance with Australian Auditing Standards
and consequently does not enable us to obtain assurance that we would become aware of all significant
matters that might be identified in an audit. Accordingly, we do not express an audit opinion.
Independence
In conducting our review, we have complied with the independence requirements of the Corporations
Act 2001.
HLB Mann Judd
Chartered Accountants
B G McVeigh
Partner
Perth, Western Australia
26 February 2024
14
Interim Financial report for the half-year ended 31 December 2023
Directors’ Declaration
The Directors of the Company declare that:
1.
2.
The financial statements and notes set out on pages 16 to 31 are in accordance with the
Corporations Act 2001, including:
(a)
complying with Australian Accounting Standard AASB 134: Interim Financial Reporting, the
Corporations Regulations 2001 and other mandatory professional reporting requirements;
and
(b)
giving a true and fair view of the Company’s financial position as at 31 December 2023 and
of its performance, as represented by the results of its operations and its cash flow, for the
half-year ended on that date.
In the Directors’ opinion there are reasonable grounds to believe that the Company will be able to
pay its debts as and when they become due and payable.
This declaration is made in accordance with a resolution of the Board of Directors.
Mr Tim Kennedy
Director
Date: 26 February 2024
15
Interim Financial report for the half-year ended 31 December 2023
Condensed Statement of Profit or Loss and Other
Comprehensive Income for the half-year ended 31
December 2023
NOTE
Half-year
ended
31 Dec 2023
$
Half-year
ended
31 Dec 2022
Restated
$
Continuing Operations
Interest income
Other income
55,836
122
13,468
-
Total Revenue from Continuing Operations
55,958
13,468
(1,746,479)
(133,533)
(102,792)
(69,465)
(5,278)
(44,657)
(42,637)
(2,392,872)
(108,783)
(161,121)
(23,000)
(127,972)
(354)
(91,788)
(25,321)
(2,088,883)
(2,917,743)
-
-
(2,088,883)
(2,917,743)
-
-
-
-
Other comprehensive income for the period
-
-
Total comprehensive loss for the period
attributable to owners of Yandal Resources
Limited
(2,088,883)
(2,917,743)
(1.22)
(2.25)
Exploration expenditure
Employee and contractors expenses
Administration expenses
Bad debt expense
Consultants expenses and professional costs
Finance costs
Travel expenses
Share based payments
Depreciation and amortisation
7
Loss from continuing operations before
income tax
Income tax (expense)/benefit
Loss from continuing operations after income
tax for the period
Other comprehensive income for the period
Items that will not be reclassified subsequently to
profit or loss
Items that may be reclassified subsequently to
profit or loss
6
Basic loss (cents per share)
The above Statement of Profit or Loss and Other Comprehensive Income should be read in conjunction with the accompanying
notes.
16
Interim Financial report for the half-year ended 31 December 2023
Condensed Statement of Financial Position
as at 31 December 2023
31 Dec 2023
Current Assets
Cash and cash equivalents
Trade and other receivables
Other assets
NOTE
$
3
5,756,774
134,590
32,456
4,217,239
50,981
7,007
5,923,820
4,275,227
184,705
30,715
201,147
-
215,420
201,147
6,139,240
4,476,374
374,313
25,284
11,033
401,105
-
410,630
401,105
6,706
-
6,706
417,336
401,105
5,721,904
4,075,269
33,272,176
1,398,856
(28,949,128)
29,715,384
1,220,130
(26,860,245)
5,721,904
4,075,269
Total Current Assets
Non-Current Assets
Property, plant and equipment
Right of use asset
4
Total Non-Current Assets
Total Assets
Current Liabilities
Trade and other payables
Lease liabilities
Provisions
4
Total Current Liabilities
Non-Current Liabilities
Lease liabilities
4
Total Non-Current Liabilities
Total Liabilities
Net Assets
Equity
Issued capital
Reserves
Accumulated losses
5
Total Equity
30 June 2023
Restated
$
The above Statement of Financial Position should be read in conjunction with the accompanying notes.
17
Interim Financial report for the half-year ended 31 December 2023
Condensed Statement of Changes in Equity
for the half-year ended 31 December 2023
Attributable to equity holders
Issued
Capital
$
Share
Based
Payments
Reserve
$
Accumulated
Losses
$
Total Equity
$
29,715,384
1,220,130
(26,860,245)
4,075,269
Comprehensive income for the half-year
Loss for the half-year
-
-
(2,088,883)
(2,088,883)
Total comprehensive loss for the half-year
-
-
(2,088,883)
(2,088,883)
Transactions with owners in their capacity
as owners:
Issue of shares during the period
Share issue costs
Issue of performance rights (refer Note 7)
Issue of options (refer Note 7)
4,000,000
(443,208)
-
11,263
167,463
-
4,000,000
(443,208)
11,263
167,463
Balance at 31 December 2023
33,272,176
1,398,856
(28,949,128)
5,721,904
Balance at 1 July 2023 (restated)
Attributable to equity holders
Share
Based
Payments
Reserve
$
Accumulated
Losses
Restated
$
Total Equity
$
25,154,568
866,797
(2,804,234)
23,217,131
-
-
(19,382,704)
(19,382,704)
25,154,568
866,797
(22,186,938)
3,834,427
-
-
(2,917,743)
(2,917,743)
-
-
(2,917,743)
(2,917,743)
Issue of shares during the period
Share issue costs
Issue of performance rights (refer Note 7)
Issue of options (refer Note 7)
5,006,708
(445,892)
-
14,343
139,951
-
5,006,708
(445,892)
14,343
139,951
Balance at 31 December 2022
29,715,384
1,021,091
(25,104,681)
5,631,794
Restated
Balance at 1 July 2022
Issued
Capital
$
Retrospective adjustment upon change in
accounting policy
Restated balance at 1 July 2022
Comprehensive income for the half-year
Loss for the half-year
Total comprehensive loss for the half-year
Transactions with owners in their capacity
as owners:
The above Statement of Changes in Equity should be read in conjunction with the accompanying notes.
18
Interim Financial report for the half-year ended 31 December 2023
Condensed Statement of Cash Flows
for the half-year ended 31 December 2023
Half-year
ended
31 Dec 2023
$
Half-year
ended
31 Dec 2022
Restated
$
Cash flows from operating activities
Payments to suppliers and employees
Interest received
Payments for Exploration and evaluation expenditure
Payments for acquisition of tenements
(320,930)
48,830
(1,851,810)
-
(338,094)
13,381
(1,979,177)
(22,500)
Net cash used in operating activities
(2,123,910)
(2,326,390)
Cash flows from investing activities
Payments for purchase of plant and equipment
Payments for right of use asset
(7,766)
(19,650)
(58,029)
-
Net cash used in investing activities
(27,416)
(58,029)
Cash flows from financing activities
Proceeds from issues of ordinary shares
Proceeds from exercising of options
Share issue costs
4,000,000
(309,139)
5,005,083
1,625
(383,385)
Net cash provided by financing activities
3,690,861
4,623,323
Net increase/(decrease) in cash and cash equivalents
Cash and cash equivalents at the beginning of the half-year
1,539,535
4,217,239
2,238,904
3,730,000
Cash and cash equivalents at the end of the half-year
5,756,774
5,968,904
The above Statement of Cash Flows should be read in conjunction with the accompanying notes.
.
19
Interim Financial report for the half-year ended 31 December 2023
Notes to the Interim Financial Statements
for the half-year ended 31 December 2023
1.
Basis of Accounting and Statement of Compliance
The half-year financial report is a general purpose financial report prepared in accordance with the
requirements of the Corporations Act 2001, Australian Accounting Standard AASB 134 Interim Financial
Reporting and other mandatory professional reporting requirements. The interim financial statements were
approved by the Board of Directors. The accounting policies and methods of computation applied by the
Company in this interim financial report are the same as those applied by the Company in its financial report
for the year ended 30 June 2023.
It is also recommended that the half-year financial report
Share your feedback
Discover