Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
Contact Us
A: Suite 1, Level 3, 1138 Hay Street,
West Perth WA 6005
T: +61 (0)8 9389 9021
E: yandal@yandalresources.com.au
yandalresources.com.au | ASX: YRL
Board and Management
Chris Oorschot Managing Director/CEO
Greg Evans Non-Executive Chair
Katina Law Non-Executive Director
Chris Newman Non-Exec Director
Greg Fitzgerald Company Secretary
June Quarter 2026 – Quarterly Activities Report
Ironstone Well–Barwidgee Gold Project (100% Yandal)
Key Outcomes
• Arrakis RC and diamond drilling expands the scale of the Arrakis gold discovery and
demonstrates mineralisation continuity at depth.
• First diamond drilling results from Flushing Meadows confirm primary fresh rock
mineralisation and demonstrate potential for parallel mineralisation outside of the
current Mineral Resource Estimate.
• Siona RC drilling identifies a new shallow mineralised zone.
• Regional ground gravity dataset expanded and early-stage air-core drilling
underway to assess the untested Giedi Prime target area.
• With a significant volume of samples at the lab, results anticipated throughout
August will inform follow-up drilling program designs and scheduling during the
September Quarter.
Exploration - Arrakis Gold Discovery – Caladan Target Area
• Results received during the quarter from both RC and diamond drilling include:
o 27m @ 1.2g/t Au from 87m in 26IWBRC0065, including
2m @ 5.1g/t Au from 89m, and
o 12m @ 2.3g/t Au from 152m in 26IWBRC0067, including
6m @ 3.7g/t Au from 152m
o 11.5m @ 1.6g/t Au from 347.6m in 26IWBRC0066D, including
5.0m @ 3.1g/t Au from 348m,
o 18.0m @ 1.8g/t Au from 290.0m in 25IWBRC0050D, including
4.1m @ 5.7g/t Au from 301.7m,
• Drilling combined with geological interpretation indicates the mineralised system
remains open at depth.
• Higher-grade mineralisation continues to be associated with the eastern
hanging-wall contact, providing clear vectors for follow-up drilling and targeting of
ASX Announcement
30 July 2026
yandalresources.com.au | ASX:YRL 2
potential high-grade zones at depth that will be scheduled once a majority of
results are received during the September Quarter.
Exploration – Flushing Meadows Deposit
• Eight 200m spaced diamond holes completed below the Flushing Meadows MRE;
results from the first two diamond holes include:
o 20m @ 1.7g/t Au from 55m in 26IWBRC0098DA, including
1m @ 3.5g/t Au from 55m,
9m @ 2.7g/t Au from 64m
o 11.3m @ 1.1g/t Au from 214.3m in 26IWBRC0095D, including
3.6m @ 2.5g/t Au from 222m
o 4.8m @ 2.3g/t Au from 175.2m in 26IWBRC0098DA, including
1m @ 6.5g/t Au from 178m
• Early follow-up RC drilling testing parallel mineralisation at Flushing Meadows was
completed after the Quarter's end.
• Air-core drilling program commenced across the broader Flushing Meadows and
Giedi Prime target areas.
Exploration – Siona Prospect - New England Granite Target Area
• Shallow RC drilling at Siona demonstrated a new shallow mineralisation trend that
remains open along strike, with intercepts including:
o 17m @ 1.3g/t Au from 37m in 26IWBRC0084, including
3m @ 5.0g/t Au from 42m,
o 13m @ 1.5g/t Au from 45m in 26IWBRC0074, including
2m @ 8.1g/t Au from 45m,
Corporate & Financial Summary
• At quarter end, Yandal held approximately $9.7 million in cash, providing a strong
funding position to execute the planned 2026 exploration program.
Looking Ahead - September Quarter 2026
Key activities and events during the September quarter will include:
• Receipt of final assay results from Arrakis drilling;
• Receipt of assay results for the remaining six Flushing Meadows diamond holes;
• Completion of the broad-scale air-core program across the Flushing Meadows and
Giedi Prime target area;
• Follow-up drilling to be scheduled once the bulk of results are returned during the
September Quarter;
• Commencement of further air-core drilling across NEG regional targets.
yandalresources.com.au | ASX:YRL 3
• Strategic review of exploration priorities and growth opportunities across the IWB
portfolio;
• Developing Exploration Targets across Arrakis, Siona and Flushing Meadows;
Yandal Resources Ltd (ASX: YRL, “Yandal Resources” or the “Company”) is pleased to provide a
summary of operational and corporate activities undertaken during the Quarter ended 30 June
2026.
The Company remains focused on completing an accelerated exploration campaign that will
continue to unlock the value of its portfolio of highly prospective 100% owned gold projects,
located within the Yandal Greenstone Belt in Western Australia (See Figure 1).
Figure 1: Yandal Resource exploration Project locations
within the Yandal Greenstone Belt. The Arrakis prospect is
located within the Caladan target area
June Quarter Operational Summary and 2026 Outlook
The June 2026 quarter saw a significant acceleration in exploration activities across the Ironstone
Well–Barwidgee (IWB) Gold Project. This included a significant volume of both diamond, RC and
air-core drilling across recent discoveries including Arrakis and Siona; the existing Flushing
Meadows deposit and early-stage targets including Giedi Prime. Non-drilling activities for the
King of the Hills
Thunder Box
Darlot
Bellevue
Kathleen Valley
Mt Keith
Wiluna
Jundee
Bronzewing
Wiluna
Leinster
New England Granite
Siona Discovery
Flushing Meadows
Deposit 268koz
Caladan Target area
Arrakis Discovery
0 100km
Ironstone Well-
Barwidgee Gold Project
Mt McClure Gold
Project 182koz
Dingo Range Project
yandalresources.com.au | ASX:YRL 4
quarter included the acquisition of further ground gravity data to facilitate ongoing early-stage
target generation, heritage surveys and baseline environmental surveys.
IRONSTONE WELL-BARWIDGEE GOLD PROJECT
The 100% owned Ironstone Well-Barwidgee (IWB) Gold Project covers approximately 456km²
of highly prospective and under-explored tenure located between the Jundee and
Bronzewing mines in the northern Yandal Greenstone Belt (Figure 1).
Yandal Resources has an established Resource of 268,000oz of gold at Flushing Meadows
(within IBW) and considers there to be strong potential to make new discoveries and expand
this resource base within its extensive tenure holding. (Refer to the ASX announcement of 4
November 2020 for details of the Flushing Meadows Resource and Table1).
The IWB project area also includes two new gold discoveries, the Arrakis and Siona prospects,
both made within the last two years (see Figure 2). These outcomes were driven by the
execution of a targeted exploration program following a systematic, geology-driven
strategy developed in early 2023. The Arrakis prospect is hosted within the Caladan target
area, and the Siona prospect is hosted within the New England Granite target area.
Figure 2: Yandal Resource priority exploration target areas for 2026 from
the Ironstone Well-Barwidgee Gold Project, situated in the northern
Yandal Greenstone Belt.
5km
Salusa
Caladan
Target Area
Siona
Flushing Meadows
(268Koz)
New England
Granite
Nayla Target
Area
Giedi Prime
Target Area
5km
Radius
Arrakis
Discovery
Irulan Dolerite
Complex
yandalresources.com.au | ASX:YRL 5
ARRAKIS GOLD DISCOVERY
The Caladan target area was originally identified in June 2024 through detailed analysis of gravity
and open-file data (see ASX Release 11 June 2024).
RC and Diamond Drilling Results and Geological Interpretation
During the quarter, Yandal completed 8,900m of reverse circulation (RC) drilling across 49 holes.
Not all results from the RC program were received during the quarter. Results received extended
mineralisation a further 150m to the southeast and began to delineate high-grade domains of
mineralisation (see Figures 3 and 4) with intercepts including:
• 27m @ 1.2g/t Au from 87m in 26IWBRC0065, including
2m @ 5.1g/t Au from 89m, and
5m @ 2.7g/t Au from 100m
• 12m @ 2.3g/t Au from 152m in 26IWBRC0067, including
6m @ 3.7g/t Au from 152m,
• 13m @ 1.6g/t Au from 206m in 26IWBRC0069m, including
8m @ 2.2g/t Au from 210m, and
• 11m @ 1.7g/t Au from 84m in 26IWBRC0100, including
6m @ 2.8g/t Au from 84m
Results received after the quarter's end demonstrated that the Scytale Shear Zone bounds the
mineralisation to the southeast (see Figure 3).
Diamond drilling completed during the quarter included four holes for approximately 910m of
core drilling. Results from diamond drilling reported after the quarter end included:
• 11.5m @ 1.6g/t Au from 347.6m in 26IWBRC0066D, including
5.0m @ 3.1g/t Au from 348m,
• 18.0m @ 1.8g/t Au from 290.0m in 25IWBRC0050D, including
4.1m @ 5.7g/t Au from 301.7m,
• 21.7m @ 0.8g/t Au from 366m in 26IWBRC0066D, including
4m @ 2.1g/t Au from 370m, and
• 10.2m @ 1.3g/t Au from 240.8m in 26IWBRC0068D, including
3.8m @ 2.9g/t Au from 242.3m
Results from 25IWBRC0050D highlighted a steep plunging high-grade domain to the southeast
adjacent to the offsetting Scytale Shear Zone, striking between 100-150m open at depth. While
results from 26IWBRC0066D and 26IWBRC0068D demonstrated strong mineralisation continuity
below and an interpreted zone of complexity.
yandalresources.com.au | ASX:YRL 6
Subsequent to the quarter's end, a small RC program was also completed to test the fresh rock
position below the parallel Anders regolith anomaly located approximately 900m south of Arrakis.
Results from the completed drilling will inform a formal exploration target for the Arrakis discovery
during August.
Figure 3: A collar plan over the Arrakis Prospect within the Caladan target area,
overlying a ground gravity image (BA267 0.5VD non-linear colour scale, with northeast
shade). All Yandal drilling is plotted (historic drilling has been excluded). Collars are
thematically coloured by max Au (g/t) in the hole. Dashed yellow polygons represent
air-core regolith anomalies (Results include ~4m @ 0.1 g/t Au or greater, with the upper
profile or the bottom-of-hole sample is 0.1g/t Au or greater).
yandalresources.com.au | ASX:YRL 7
Figure 4: A longitudinal section displaying intercept midpoints within the main Arrakis mineralised structure
(intercepts from subordinate structures are excluded). Grade accumulation (length multiplied by Au grade) is
based on down-hole length, with no true width correction applied. This longitudinal section has been prepared
to show the distribution of recent intercepts across the interpreted Arrakis trend.
FLUSHING MEADOWS
RC and Diamond Drilling Results
The Flushing Meadows deposit hosts a 268koz @ 1.1g/t Mineral Resource Estimate (see ASX
release 4 November 2020 and Table1) with mineralisation occurring over 1.9km of strike and
is located approximately 8km west-northwest of the Arrakis discovery (see Figure 5). A
majority of previous drilling was completed to define the predominantly oxide and
transitional gold mineralisation, with minimal fresh rock drilling below the Mineral Resource.
Regional soil sampling and ground gravity surveys have highlighted several targets either
along strike or parallel to the currently defined extent of mineralisation at Flushing
Meadows.
The June Quarter has seen a significant ramp-up of activity across the Flushing Meadows deposits
and broader target area. The Flushing Meadows framework diamond drilling program
commenced in late April. The program saw eight 200m spaced diamond holes completed below
the current Flushing Meadows MRE, covering 1.6 km of strike. Diamond drilling is targeting down-
dip intercepts, approximately 100m below the fresh rock boundary.
The key aims of the framework program included:
• Completing the first effective and systematic test of primary fresh rock mineralisation
across the Flushing Meadows deposit,
• Assessing the potential for high-grade mineralisation within fresh rock, and
Scale
250m
NORTHWEST
Surface
Arrakis
Longitudinal Section
southwest facing
SOUTHEAST
Primary Arrakis Structure >1.3km
26IWBRC0066D
11.5m @ 1.6g/t Au
Incl. 5.0m @ 3.1g/t Au
& 21.7m @ 0.8g/t Au
Incl. 4m @ 2.1g/t Au
Interpreted
Scytale Shear
Zone Offsetting
Stratigraphy
26IWBRC0068D
10.2m @ 1.3g/t Au
Incl. 3.8m @ 2.9g/t Au
Long-section Only Plots Confirmed Intercepts Within
the Primary Arrakis Structure Only
RC Drilling of Southeast
Offset Extension –
Results Pending
26IWBRC0070D
1.2m @ 0.6g/t Au
Remnants of Arrakis
within shear
25IWBRC0050D
18.0m @ 1.8g/t Au
Incl. 4.1m @ 5.7g/t Au
yandalresources.com.au | ASX:YRL 8
• Identifying key stratigraphic, intrusive and structural controls on mineralisation to inform
a preliminary geological model.
While all diamond holes were completed during the quarter, results from the first two holes
were only received after the quarter's end, with the results from the remaining six diamond
holes anticipated in the current Quarter. Significant intercepts from the framework diamond
drilling program include:
• 20m @ 1.7g/t Au from 55m in 26IWBRC0098DA, including
1m @ 3.5g/t Au from 55m,
9m @ 2.7g/t Au from 64m
• 5m @ 0.8 g/t Au from 113m in 26IWBRC0098DA, including
1m @ 3.0g.t Au from 115m
• 0.2m @ 3.1g/t Au from 144.3m in 26IWBRC0098DA
• 4.8m @ 2.3g/t Au from 175.2m in 26IWBRC0098DA, including
1m @ 6.5g/t Au from 178m
• 2m @ 2.9g/t Au from 188m in 26IWBRC0098DA,
• 2.2m @ 1.2g/t Au from 225.2m in 26IWBRC0098DA
• 11.3m @ 1.1g/t Au from 214.3m in 26IWBRC0095D, including
o 3.6m @ 2.5g/t Au from 222m
• 0.4m @ 3.1g/t Au from 266m in 26IWBRC0095D,
• 1.9m @ 2.0g/t Au from 280.3m in 26IWBRC0095D, and
• 2.9m @ 0.5g/t Au from 290.8m in 26IWBRC0095D.
The above results demonstrate that iron-rich sediments are the primary host for fresh rock gold
mineralisation, with a similar mineralisation style intercepted in both 26IWBRC0098DA and
26IWBRC0095D, spaced 400m to the north (see Figures 6 and 7). Narrow higher-grade intervals
(3-7g/t Au) are linked to 5cm to 30cm wide veins or intervals of strong silica alteration within the
sedimentary units.
Significantly, all the primary mineralised intercepts are positioned outside of the current Flushing
Meadows MRE. The majority of mineralised intercepts are in the hanging-wall (above and to the
east of) known mineralisation, indicating several new, untested mineralised structures that remain
open at depth and to the southeast.
Four RC holes have recently been completed below reported RC pre-collar intercepts from
26IWBRC0098DA and 26IWBRC0099D to assess the continuity of parallel mineralisation into fresh
rock (see Figure 5). Further follow-up RC targets will be refined as diamond drilling results are
received across the remainder of July and throughout August.
yandalresources.com.au | ASX:YRL 9
Figure 5: Flushing Meadows collar plan overlaid on a ground gravity image (BA267 0.5VD non-
linear colour scale, with northeast shading). All Yandal drilling is plotted, with only effective (>20m
down-hole depth) historic drilling displayed. Collars are thematically coloured by max Au (g/t) in
the hole. The section lines for Figures 6 and 7 are also displayed. The diagram shows that previous
drilling has been very ineffective around the current MRE, particularly to the east and southeast.
Flushing
Meadows
268koz MRE
500m
< 26IWBRC0090D
< 26IWBRC0096DA
26IWBRC0098DA
RC Pre-Collar
20m @ 1.7g/t Au
Incl. 9m @ 2.7g/t Au
Diamond Core Tail
4.8m @ 2.3g/t Au
< 26IWBRC0094D
26IWBRC0097D
RC Pre-Collar
13m @ 0.4g/t Au
Awaiting Results
from Diamond Core
< 26IWBRC0092D
Surface
Projection of
Parallel
Mineralisation
26IWBRC0095D
11.3m @ 1.1g/t Au
Incl. 3.6m @ 2.5g/t Au
26IWBRC0099D
RC Pre-Collar
2m @ 3.2g/t Au
Awaiting Results
from Diamond Core
yandalresources.com.au | ASX:YRL 10
Figure 6: 10,125mN cross-section showing mineralised intervals from 26IWBRC0098DA at Flushing
Meadows. The section location is shown in Figure 5. The section shows all drilling within +/- 25m of
the section plane.
Cross-Section
10,125mN
northwest facing
Surface
BOCO
TOFR < Start of diamond core
20m @ 1.7g/t Au
Incl. 9m @ 2.7g/t Au
5m @ 0.8g/t Au
Incl. 1m @ 3.0g/t Au
0.2m @ 3.1g/t Au
4.8m @ 2.3g/t Au
Incl. 1m @ 6.5g/t Au
2m @ 2.9g/t Au
2.2m @ 1.2g/t Au
RC Assays
Pending
yandalresources.com.au | ASX:YRL 11
Figure 7: 10,525mN cross-section showing mineralised intervals from 26IWBRC0095D. The section location is
shown in Figure 5. The section shows all drilling within +/- 12.5m of the section plane.
EARLY STAGE EXPLORATION
During the quarter, a ground gravity survey was completed across parts of the IWB Gold Project,
infilling and expanding the datasets acquired in 2024 and 2025. The updated dataset and
imagery will be used to:
• Refine the stratigraphic and structural interpretations around Arrakis, Giedi Prime and
Flushing Meadows; and
• Generate new early-stage exploration targets within the IWB Gold Project.
Cross-Section
10,525mN
northwest facing
Surface
BOCO
TOFR
< Start of diamond core
11.3m @ 1.1g/t Au
Incl. 3.6m @ 2.5g/t Au
1.9m @ 2.0g/t Au
2.9m @ 0.5g/t Au
2.1m @ 0.5g/t Au
yandalresources.com.au | ASX:YRL 12
Towards the end of the June Quarter, a large-scale air-core program across the broader Flushing
Meadows and Giedi Prime target areas commenced. The approximately 10,000m program is
ongoing with completion scheduled in August (see Figure 8). The program is designed to map
out the boundaries of the Flushing Meadows mineralised system and complete the first test across
the Giedi Prime gravity target area, first identified in 2024. First results are anticipated in
September.
Figure 8: Broader scale plan showing the Flushing Meadows and Giedi Prime target areas overlaid
on a ground gravity image (BA267 0.5VD non-linear colour scale, with northeast shading). All Yandal
drilling is plotted, with only effective (>20m down-hole depth) historic drilling displayed. Collars are
thematically coloured by max Au (g/t) in the hole. The plan shows the planned air-core lines.
1km
Giedi Prime
Target Area
Flushing
Meadows
268koz MRE
Planned Air-
core Lines
yandalresources.com.au | ASX:YRL 13
NEW ENGLAND GRANITE (NEG) TARGET AREA
RC Results – Siona
The Siona RC Program was completed to follow up on several previously reported Siona
intercepts that are situated outside of the main mineralised trend. A total of nine RC holes for
approximately 950m were drilled (see Figure 10). Results from all nine RC holes have been
received. Significant intercepts from the RC drilling include:
• 17m @ 1.3g/t Au from 37m in 26IWBRC0084, including
3m @ 5.0g/t Au from 42m,
• 13m @ 1.5g/t Au from 45m in 26IWBRC0074, including
2m @ 8.1g/t Au from 45m,
• 10m @ 0.9g/t Au from 36m in 26IWBRC0086, including
1m @ 2.0g/t Au from 36m,
2m @ 3.2g/t Au from 40m
• 10m @ 0.9g/t Au from 58m in 26IWBRC0080, including
1m @ 3.7g/t Au from 67m,
• 15m @ 0.5g/t Au from 48m in 26IWBRC0076,
• 2m @ 1.5g/t Au from 33m in 26IWBRC0088, and
• 1m @ 3.3g/t Au from 37m in 26IWBRC0082
Figure 9 demonstrates the flat-lying nature of the mineralisation in cross-section, which appears
to be gently dipping (-10º) to the northwest. The mineralisation intercepted currently sits to the
southwest of the currently defined Siona mineralisation.
The strongly weathered and oxidised nature of the intercepts currently makes it difficult to
determine whether the mineralisation is linked to a primary mineralised structure or represents a
blanket of secondary mineralisation within the regolith profile (supergene gold).
Further RC drilling will be scheduled for the second half of 2026 to determine whether the
mineralisation is primary in nature and whether the flat-dipping gold mineralisation continues
along the main Siona mineralised trend.
Air-core drilling – NEG Target Area
A circa 5,000m air-core program will commence across the western margin of the NEG once final
access conditions are met. The program is designed to test several deformed granite-margin
settings comparable to that of the late 2024 Siona gold discovery (see Figure 11).
yandalresources.com.au | ASX:YRL 14
Figure 9: Siona cross-section showing mineralised intercepts from 26IWBRC0082, 26IWBRC0084
and 26IWBRC0086. The section location is shown in Figure 10. The section shows all drilling within
+/- 12.5m of the section plane.
yandalresources.com.au | ASX:YRL 15
Figure 10: Siona collar plan overlaid on a ground gravity image (BA267 1VD linear colour scale, with
northeast shading). All Yandal drilling is plotted. Collars are thematically coloured by max Au (g/t) in the
hole. The section lines for cross-section A (Figure 9) are also displayed. See Figures 2 and 11 for the
location of Siona within the NEG target area.
26IWBRC0074
13m @ 1.5g/t Au
Incl. 2m @ 8.1g/t Au
Surface Projection of
Previously Defined Main
Siona Mineralised
Structure
200m
26IWBRC0084
17m @ 1.3g/t Au
Incl. 3m @ 5.0g/t Au
26IWBRC0086
10m @ 0.9g/t Au
Incl. 1m @ 2.0g/t Au
& 2m @ 3.2g/t Au
26IWBRC0080
10m @ 0.9g/t Au
Incl. 1m @ 3.7g/t Au
26IWBRC0076
15m @ 0.5g/t Au
yandalresources.com.au | ASX:YRL 16
Figure 11: Plan showing processed infill ground gravity dataset (BA267 1VD
northwest shade linear colour scale) across the New England Granite area. The
plan includes the updated interpretation of the intrusive margin and a
preliminary interpretation of structures interacting with the intrusion. Western
targets NEG01, NEG02, and NEG03 will be tested in the June Quarter. Broad
structural targets, including Salusa and NEG01-NEG04, are shown along with the
Figure 2 area.
New England
Granite
Siona
Salusa
NEG01
NEG02
NEG04
NEG03
yandalresources.com.au | ASX:YRL 17
MT McCLURE
The Mt McClure Gold Project, acquired in August 2022, is located ~15km southwest of the
historic Bronzewing Mine and includes three mining leases with combined Mineral
Resources totalling 182,200oz Au (see Table 1).
The project has prospectivity for new shallow gold deposits adjacent to current Resources
and in the footwall and hanging wall of the stratigraphy. Preparations are underway for
targeted diamond drilling at the Success and Permelia deposits (see Figure 12) to assess
higher-grade mineralisation at depth and provide material for metallurgical assessment. In
addition, RC drilling focused on extending the HMS Sulphur mineralisation to the south will
also be considered in 2026.
Figure 11: Mt McClure tenement plan showing major prospects,
interpreted bedrock lithology, major structures, and proximity to nearby
mines.
yandalresources.com.au | ASX:YRL 18
LOOKING AHEAD
Key priorities for the September quarter include:
• Receipt of final Assay results from Arrakis drilling;
• Receipt of assay results for the remaining six Flushing Meadows diamond holes;
• Completion of the broad-scale air-core program across the Flushing Meadows and Giedi
Prime target area;
• Once a majority of results from completed programs are received, follow-up drilling
programs will be designed and scheduled;
• Commencement of further air-core drilling across NEG regional targets;
• Strategic review of exploration priorities and growth opportunities across the IWB portfolio;
and
• Results from completed drilling will inform the development of formal Exploration Targets
for Arrakis, Siona and Flushing Meadows.
CORPORATE SUMMARY
Issued Capital
The movements in securities on issue during the quarter were as follows:
• Issue of 1,130,954 ordinary shares at a price of $0.22 per share to settle amounts owing
for drilling services rendered pursuant to a drill-for-equity agreement (DFE) as disclosed
in the March 2026 Quarterly Activities Report. The DFE allowed YRL to issue up to
$250,000 worth of YRL shares to settle amounts owing.
The securities on issue at the start and end of the quarter are summarised in the table below.
Type of Security 31 March 2026 Movement in
June Qtr
30 June 2026
Ordinary shares 381,508,932 1,130,954 382,639,886
Options 15,400,000 - 15,400,000
TOTAL 396,908,932 1,130,954 398,039,886
Summary of Exploration Expenditure
In accordance with Listing Rule 5.3.1, Yandal confirms that, as disclosed in the Cashflow
Report (item 1.2(a)), Yandal’s exploration expenditure for the quarter was approximately $4.2
million. Details of the exploration activities underlying this expenditure are as set out in the
Activities Report.
yandalresources.com.au | ASX:YRL 19
Payments to Related Parties and their Associates
Payments to Related Parties and their Associates in accordance with ASX Listing Rule 5.3.5,
$112,000 was paid to related parties or their associates during the quarter, comprising
Executive Director salaries, Non-executive Director fees, and superannuation.
Recent ASX Releases Referenced in Announcement
ASX Releases:
13 July 2026 “RC Drilling Intercepts Shallow Gold at Siona”
06 July 2026 “Arrakis Diamond Drilling Confirms High-Grade Gold at Depth”
25 June 2026 “First Diamond Core Results from Flushing Meadows”
15 June 2026 “ Flushing Meadows RC Pre-Collar Delivers 20m @1.7g/t Au
09 June 2026 “Gold Coast Investment Showcase Presentation”
09 June 2026 “Gold Discoveries Expanding Across IWB Project”
06 May 2026 “ Investor Presentation – RIU Sydney Resource Roundup”
28 April 2026 “ First Arrakis RC Results Extend High-Grade Mineralisation”
20 April 2026 “Exploration Update April 2026”
Authorised by the Board of Yandal Resources
For further information, please contact:
Chris Oorschot
Managing Director
Yandal Resources Limited
yandal@yandalresources.com.au
Lucas Robinson
Corporate Storytime
+61 408 228 889
lucas@corporatestorytime.com
For further information or to ask questions in relation to this announcement, please visit our
Investor Hub at https://yandalresources.com.au/link/PB24OP
yandalresources.com.au | ASX:YRL 20
About Yandal Resources Limited
Ironstone Well-Barwidgee Gold Project
The 100% owned Ironstone Well-Barwidgee (IWB) Gold Project covers approximately 370km² of highly
prospective and under-explored tenure located between the Jundee and Bronzewing mines in the
northern Yandal Greenstone Belt. Yandal has an established Resource of 268,000oz of gold (see Table 1)
at Flushing Meadows (within IBW) and considers there to be strong potential to make new discoveries
and expand this resource base within its extensive tenure holding. (Refer to the ASX announcement of 4
November 2020 for details of the Flushing Meadows Resource).
The IWB project area also includes two new gold discoveries, the Arrakis and Siona prospects, both made
within the last twelve months. These outcomes were driven by the execution of a targeted exploration
program that followed a systematic, geologically driven strategy that was developed in early 2023. The
Arrakis prospect is hosted within the Caladan fold, and the Siona prospect is hosted within the New
England Granite.
Both discoveries are currently at an early stage but progressing well, with future activities focused on
delineating the scale of each of the newly defined mineralised systems.
The IWB Gold Project also includes several advanced prospects, where limited historic and YRL drilling has
returned robust gold intercepts, indicating the potential for shallow oxide mineralisation. Both the early-
stage and more advanced prospects are the focus of ongoing exploration.
Mt McClure
The Mt McClure Gold Project, acquired in August 2022, is located ~15km southwest of the historic
Bronzewing Mine and includes three mining leases with JORC 2012 Resources totalling 182,200oz Au (see
Table 1).
The project has prospectivity for new shallow gold deposits adjacent to current Resources and in the
footwall and hanging wall of the stratigraphy. Ground gravity survey data support ongoing
structural/stratigraphic interpretations for 2026 targeting.
Table 1: Yandal Resources Ltd - Mineral Resource Summary
Deposit
Indicated Inferred Total
Tonnes
(‘000s)
Grade
(g/t)
Au
(oz)
Tonnes
(‘000)
Grade
(g/t)
Au
(oz)
Tonnes
(000’s)
Grade
(g/t)
Au
(Oz)
Ironstone Well
Flushing Meadows1 2,141 1.3 91,000 5,245 1.1 177,000 7,386 1.1 268,000
Mt McClure
Challenger2 718 1.9 44,000 718 1.9 44,000
Success3 1,255 1.9 75,000 1,255 1.9 75,000
Parmelia4 252 2.1 17,000 252 2.1 17,000
HMS Sulphur5 1010 1.2 39,000 1010 1.2 39,000
Gilmore6 134 1.7 7,200 134 1.7 7,200
Sub-total - MMC 3,369 1.7 182,200 3,369 1.7 182,200
Grand-total7 2,141 1.3 91,000 8,614 1.3 359,200 10,755 1.3 450,200
Due to the effects of rounding, totals may not represent the sum of the individual components.
1. Reported above 0.5g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 4 November 2020 for full
details. 2. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 22 August 2022 for
full details 3. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 6 September
yandalresources.com.au | ASX:YRL 21
2022 for full details. 4. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 20
September 2022 for full details. 5. Reported above 0.5g/t Au lower cut-off grade within this announcement 6. Reported above 1.0g/t
Au lower cut-off grade within this announcement. 7. All Resources are reported as global estimates, not constrained by optimised pit
shells.
Competent Person Statement
The information in this document related to Exploration Targets and Exploration Results, geology and data
compilation is based on information reviewed or compiled by Mr Christopher Oorschot, a Competent
Person who is a Member of The Australasian Institute Geoscientists. Mr Oorschot is the Managing Director
of the Company, is a full-time employee and holds shares and options in the Company. Mr Oorschot has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Oorschot consents to the inclusion in this announcement of the matters based on this information in the
form and context in which it appears.
The information in this announcement that relates to the Flushing Meadows and Mt McClure Mineral
Resource Estimates is based on information compiled and generated by Andrew Bewsher, an employee
of BM Geological Service
Share your feedback
Discover