Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Announcement
27 October 2023
SEPTEMBER 2023 - QUARTERLY ACTIVITIES REPORT
KEY POINTS
Ironstone Well-Barwidgee
• RC drilling at Oblique confirms the continuity and geometry of mineralisation and extends it 300m
to the south for a total strike length of 1,100m. It remains open in all directions and follow-up
drilling is planned for November 2023.
• RC drilling at New England Granite confirms historic intercepts and furthers understanding of
controls and geometry of granite-associated gold mineralisation.
• An Exploration Target for Oblique, Quarter Moon, Flushing Meadows and the New England
Granite Prospects has been generated:
12.9 to 38.6Mt, grading between 1.1 to 1.4 g/t Au, for 0.44Moz to 1.78Moz(1)
This exploration target does not include the current Flushing Meadows Mineral Resource of 268Koz(2).
The potential quantity and grade of the Exploration Target is conceptual in nature and, therefore, is an
approximation. There has been insufficient exploration to estimate a Mineral Resource, and it is uncertain
if further exploration will result in the estimation of a Mineral Resource.
Mt McClure
• Mineral Resource Estimate (“MRE”) update increases the Mt McClure Mineral Resource
Inventory by 34% to 182,200oz @ 1.7 g/t Au.
• Initial Inferred MRE for HMS Sulphur deposit of 1,010,000t @ 1.2g/t Au for 39,000oz reported
above 0.5g/t Au lower cut-off grade.
• Inferred MRE for the Gilmore deposit of 134,000t @ 1.7g/t Au for 7,200oz reported above 1.0g/t
Au lower cut-off grade.
Gordons
• A heritage survey was completed over key southern tenements at the Gordons Project covering
the high priority Gordon Sirdar Shear Zone, with most of the area now cleared for exploration
activities.
Corporate
•
$3.2m in cash and cash equivalents available at the end of the Quarter.
For further information or to ask questions in relation to this announcement, please visit our Investor Hub at
https://investorhub.yandalresources.com.au/link/4r8Kve
(1) Refer to ASX Announcement of 25/10/2023. (2) Refer to ASX Announcement of 20/11/2020.
Registered Address
Board Members
Gold Projects
Yandal Resources Limited
Tim Kennedy
Managing Director/CEO
Greg Evans
Chair
Katina Law
Non-Executive Director
Chris Oorschot
Technical Director
Greg Fitzgerald
Company Secretary
T
+61 8 9389 9021
E
yandal@yandalresources.com.au
W
www.yandalresources.com.au
Ironstone Well (100% owned)
Barwidgee (100% owned)
Mt McClure (100% owned)
Gordons (100% owned)
ACN 108 753 608
A
P
ABN 86 108 753 608
Level 1, Unit 5/62 Ord Street
West Perth WA 6005
PO Box 1104
Nedlands WA 6909
Shares on Issue
Share Price
Market Cap
157,803,079
$0.056
$8.8m
Yandal Resources Ltd (ASX: YRL, “Yandal Resources” or the “Company”) is pleased to provide a
summary of operational and corporate activities undertaken during the quarter ending 30 September 2023.
The Company is focused on exploring its portfolio of highly prospective 100% owned gold projects located
in the Yandal and Norseman-Wiluna Greenstone Belts in Western Australia (Figure 1).
September Quarter Operational Summary and 2023 Outlook
During the September Quarter, the Company focused exploration on its highly prospective Yandal Belt
projects.
An RC drilling program was completed at the Oblique and New England Granite Prospects within the
Ironstone Well-Barwidgee Project. The results of this program confirmed the large scale potential of these
prospects. The Company also generated Exploration Targets for Oblique, Quarter Moon, Flushing
Meadows and New England Granite providing a high level assessment of their exploration potential.
At Mt McClure maiden Resource Estimates were completed for HMS Sulphur and Gilmore, which resulted
in a 34% increase in the Mt McClure Resource inventory.
The focus at Gordons was advancing our understanding of the Gordon Sirdar Shear Zone target
highlighted in 3D geological modelling and completion of a heritage survey in preparation for drill testing.
The remainder of 2023 will see the Company completing a further RC drill test at Oblique, preparing for
diamond drill testing of Oblique and New England Granite in the new year, as well as detailed drill targeting
at Gordons. The Company has also initiated a high-level review of the lithium potential of its extensive
tenement holdings. Initially this will involve prospectivity mapping, together with “bottom-of-hole” pXRF
and multi-element analysis.
Figure 1 – Yandal Resources’ project locations.
ASX Announcement 27 October 2023
Page 2
IRONSTONE WELLBARWIDGEE
The 100% owned IWB
Gold Project covers
approximately 370km² of
contiguous,
highly
prospective and underexplored tenure located
between the Jundee and
Bronzewing mines in the
northern
Yandal
Greenstone Belt.
Yandal
has
an
established Resource of
268,000oz of gold at
Flushing Meadows and
considers there to be
strong potential to make
new discoveries and
expand this resource
base
within
the
extensive
tenure
holding. Refer to the
YRL
ASX
Announcement of 4
November 2020 for
details of the Flushing
Meadows Resource.
The project area has
several prospects where
limited historic and YRL
drilling has returned
Figure 2: Location map of Ironstone Well/Barwidgee (IWB) and Mt McClure
highly
encouraging (MMC) Gold Projects showing key prospects and occurrences in relation to
nearby mines and regional geology
intercepts,
including
Quarter Moon, Oblique
and New England Granite, which are the subject of ongoing exploration. The key activity during the
Quarter was the completion of RC drilling at Oblique and New England Granite. Subsequent to the
Quarters end, the Company released Exploration Targets in accordance with JORC (2012) guidelines
for Oblique, Quarter Moon, Flushing Medows and New England Granite to demonstrate the
exploration potential of these prospects.
Full results of the drilling program and details of the Exploration Targets were announced to the ASX
on 25 October 2023.
ASX Announcement 27 October 2023
Page 3
Figure 3: Ironstone Well / Barwidgee Project Overview showing the outline of YRL tenure, regional
interpreted bedrock geology, and the location of prospects discussed in this report. Dashed red line
is a circle with a 5km radius highlighting the proximity between the Flushing Meadows Deposit and
the Oblique and Quarter Moon Prospects.
ASX Announcement 27 October 2023
Page 4
RC Drilling
Oblique
The Oblique RC program comprised 9 holes for 1,173m across 750m of strike (see Figure 4). The
program was initially planned to comprise 16 holes; however, due to difficult drilling conditions, it was
decided to defer the drilling of these until a rig more suited to the conditions could be mobilised to the
site.
Additionally, not all of the 9 completed holes were able to reach target depths. Regardless of these
difficulties, the program successfully achieved its purpose, namely to:
•
•
•
•
Test the full width of the host stratigraphic sequence,
Assess grade continuity across strike and down dip,
Assess the geometry of mineralisation relative to the host stratigraphic sequence and
Extend mineralisation to the South.
Significant intercepts are summarised below It should be noted that all of these results occur with
oxidised saprolite or saprock within a complex partially stripped regolith setting.
•
24m @ 0.7g/t Au From 26m (YRLRC1156),
o including 8m @ 1.2g/t Au & 3m @ 1.3g/t Au
•
12m @ 1.1g/t Au From 84m EOH (YRLRC1157),
o including 2m @ 2.8g/t Au and 6m @ 1.5g/t Au
•
5m @ 2.8g/t Au from 62m (YRLRC1159),
o including 2m @ 6.0g/t Au
•
14m @ 0.4g/t Au From 45m (YRLRC1162)
The results build on previous RC drilling completed in 2020 (see ASX release 9th March 2021) and
follow a detailed review of the Prospect completed earlier this year. Importantly, they support a largescale Exploration Target. A follow-up program using a rig more suited to the conditions is scheduled
for early November 2023. Testing of some of the deeper targets will be deferred until early in 2024,
when a diamond core rig can be deployed.
New England Granite
Results from the small 4-hole, 598m RC drilling program at the New England Granite Prospect have
confirmed mineralisation and provided valuable insights into the geometry of low-level anomalism and
mineralisation with the two largest gold in regolith anomalies (see Figure 5). Intercepts include:
•
25m @ 0.3g/t Au From 95m (YRLRC1151)
•
11m @ 0.7g/t Au From 138m (YRLRC1152),
o Including 6m @ 1.1g/t Au
•
20m @ 0.6g/t Au From 42m (YRLRC1153),
o Including 3m @ 3.2g/t Au
ASX Announcement 27 October 2023
Page 5
These results represent the first RC within the NEG prospect since Newmont completed two holes in
the early 2000’s.
Figure 4: Plan of the Oblique prospect showing all collars colour-coded by max Au in hole (g/t Au)
and all new drilling (not colour-coded). Overlying a composite aerial magnetic image or Total
Magnetic Intensity (east shade, linear) and reduced to pole (2VD, non-linear).
Logging combined with assay results shows a clear correlation between low-level gold anomalism and
mineralisation with pervasive silica-sericite +/- albite alteration and replacement of the mafic interstitial
mineral phases (chlorite-carbonate-magnetite) with pyrite-carbonate +/- arsenopyrite-chalcopyrite. The
alteration is seen alongside weak to moderate foliation and minor fine quartz-filled fracturing or veining.
Drilling to date suggests two possible mineralisation geometries:
o
Northwest striking and moderate to shallowly west-dipping, or
o
Northwest striking and steep to sub-vertical dipping mineralisation.
ASX Announcement 27 October 2023
Page 6
The above trends will be projected onto the intrusions interpreted eastern contact to define more precise
targets for a larger follow-up RC program.
Figure 5: Plan of the New England Granite prospect showing all collars colour-coded by max Au in
hole (g/t Au) and all new drilling (not colour-coded). Overlying a composite aerial magnetic image or
Total Magnetic Intensity and reduced to pole (1VD, non-linear).
ASX Announcement 27 October 2023
Page 7
Exploration Targets
Exploration Targets have been completed for Oblique, Quarter Moon, Flushing Meadows and New
England Granite as a guide to the exploration potential of these prospects. Refer to the announcement
of 25 October 2023 for details concerning the generation of Exploration Target ranges, including
methodology and inputs.
The potential quantity and grade of the Exploration Targets is conceptual in nature and, therefore, is an
approximation. There has been insufficient exploration to estimate a Mineral Resource, and it is uncertain
if further exploration will result in the estimation of a Mineral Resource. The exploration target is based
on the current geological understanding of the mineralisation geometry, the continuity of mineralisation
and the regional geological setting. This understanding is driven by an extensive drill hole database,
aerial magnetic data and regional mapping, coupled with the current level of understanding of
mineralisation across the four prospects. The Exploration Targets have been prepared and reported in
accordance with the 2012 edition of the JORC Code. Due to the effects of rounding, totals in Tables 1
and 2 may not represent the sum of the individual components.
Ironstone Well Gold Camp
Results from recent drilling combined with previous/historic exploration drilling, mapping and geophysical
data have enabled Yandal Resources to generate an Exploration Target for the Oblique, Quarter Moon
and Flushing Meadows Prospects/deposits (see Table 1 and Figure 6 below). The scale of the Exploration
Targets and the nearby Flushing Meadows Resource highlight that these are compelling prospects and
provide significant scope to define an open pit gold camp.
Table 1: Summary of exploration targets for the Oblique, Quarter Moon and Flushing Meadows
Prospects/Deposits
Project
Target
IWB
IWB
IWB
Oblique
Quarter Moon
Flushing Meadows
Lower Range
Tonnes
Grade
Ounces
(kt)
(g/t Au)
(Oz)
3,300
1.2
130,000
2,200
1.4
100,000
2,400
1.2
90,000
Total
7,900
1.3
320,000
Tonnes
(kt)
9,100
6,800
7,200
23,000
Upper Range
Grade
Ounces
(g/t Au)
(Oz)
1.5
440,000
1.8
390,000
1.5
350,000
1.6
1,170,000
This exploration target does not include the current Flushing Meadows Mineral Resource of
268Koz @ 1.1 g/t Au.
New England Granite
Combining Yandal drilling results together with historic exploration drilling, mapping and geophysical
data, the Company has reported an Exploration Target for the early-stage New England Granite
Prospect (see Table 2 below).
Table 2: Summary of the Exploration Targets for New England Granite
Project
Target
IWB
NEG
Lower Range
Tonnes
Grade
Ounces
(kt)
(g/t Au)
(Oz)
5,000
0.75
120,000
ASX Announcement 27 October 2023
Upper Range
Tonnes
Grade
Ounces
(kt)
(g/t Au)
(Oz)
15,600
1.2
600,000
Page 8
Figure 6: Plan of the Oblique, Quarter Moon and Flushing Meadows Prospects/Deposit, highlighting
the proximity between the three locations and detailing the reported Exploration Targets for each. This
exploration target does not include the current Flushing Meadows Mineral Resource of 268Koz @ 1.1
g/t Au (see ASX release 4th November 2020). Due to the effects of rounding, totals may not represent
the sum of the individual components.
ASX Announcement 27 October 2023
Page 9
Mt McClure
The Mt McClure Project is located 15km south-west of the historic Bronzewing gold mine and 10km
from the Orelia gold mine, both owned by Northern Star Resources Ltd (ASX: NST) in the southern
Yandal Belt (Figure 7). The project covers a total strike length of 17km of prospective stratigraphy
and includes several shallow historical open cut pits.
Figure 7: Mt McClure tenement plan showing the location of the HMS Sulphur and
Gilmore deposits, major prospects, interpreted bedrock lithology, major structures and
proximity to nearby mines.
ASX Announcement 27 October 2023
Page 10
MRE Update
During the Quarter the Company completed an MRE update for Mt McClure, incorporating the
outcomes of initial Resource Estimates for the HMS Sulphur and Gilmore prospects
The Mt McClure Mineral Resource Inventory is now 182,200oz @ 1.7 g/t Au
Refer to the YRL ASX Announcement of 3 October 2023 for details of the MRE update.
HMS Sulphur
The maiden HMS Sulphur MRE contains a total of 1,010,000t @ 1.2g/t Au for 39,000oz (> 0.5g/t Au
lower cut-off grade).
Table 3 below shows the Mineral Resource Estimate for HMS Sulphur by weathering profile at the 0.5 g/t
Au lower cut-off grade.
Table 3 – 2023 HMS Sulphur Mineral Resource Estimate (0.5g/t Au Lower Grade Cut-off) above
170m vertical depth
Weathering
Domain
Oxide
Transitional
Fresh
Total
Tonnes
Au Grade
Au Ounces
470,000
352,000
191,000
1,012,000
1.1
1.3
1.5
1.2
16,000
14,000
9,000
39,000
(g/t Au)
Note: Due to the effects of rounding, totals may not represent the sum of all
individual components. Resources are reported as global estimates, not
constrained within optimised pit shells.
The HMS Sulphur deposit includes mineralisation hosted within both oxidised, transitional and fresh
bedrock material. Mineralisation is hosted within a 2-12m wide (true width) iron-rich chert and shale
sequence that forms a laterally continuous unit across the length of the deposit. The host unit is overlain
by a broad sequence of fine-grained pelitic and volcanic sediments; underlying the host unit is a mafic
basalt/dolerite sequence. Mineralisation is structurally controlled with a possible northwest striking fault or
shear system cross-cutting the sequence and resulting in the preferential development of fracturing,
veining and brecciation within the host unit. Rheological contrast between the rigid mafic footwall and more
ductile sedimentary hanging-wall sequence is interpreted as the primary driver for mineralisation within the
host unit. Higher grade mineralisation demonstrates a possible moderate south plunge, comparable to the
strong south plunging controls evident across the adjacent Success deposit (See Figure 8) and the nearby
+1.1Moz Orelia deposit, currently being mined by Northern Star (ASX: NST). Mineralisation is associated
with quartz veining, quartz-carbonate-sulphide-filled fractures and/or breccia, and sericite carbonate
alteration. Weathering is deep across the deposit, with the base of complete oxidation extending variably
down to 50m to 120m vertical.
The HMS Sulphur MRE has a strike length of 750m and extends from the near-surface down to a vertical
depth of 170m in the south and 110m in the North. Mineralisation is open down dip and along strike
to the south. The HMS sulphur host unit continues south below the footwall of the current Success open
cut and remnant MRE of 75koz @ 1.9g/t Au.
ASX Announcement 27 October 2023
Page 11
Future exploration options across the HMS Sulphur and Success deposits will be evaluated for
opportunities to advance the two deposits further, including:
•
•
•
•
Exploration drilling targeting the HMS Sulphur host unit in the footwall of the Success open cut and
current Success MRE,
Exploration drilling aiming to extend the HMS Sulphur mineralisation at depth, to a nominal vertical
depth of 200m,
Additional shallow RC drilling to improve the definition of mineralisation within 30m of the surface,
Diamond core drilling to support future MRE updates.
Figure 8: HMS Sulphur longitudinal section looking south-west showing block model grades and drillhole traces
with grades >0.5g/t Au
Gilmore
The maiden Gilmore MRE contains a total of 134,000t @ 1.7g/t Au for 7,200oz (> 1g/t Au lower cutoff grade).
Table 4 below shows the Mineral Resource Estimate for Gilmore by weathering profile at the 1.0 g/t Au
lower cut-off grade.
Table 4 –2023 Gilmore Mineral Resource Estimate (1.0g/t Au Lower Grade Cut-off) above 120m
vertical depth
Weathering
Domain
Oxide
Transitional
Fresh
Total
Tonnes
Au Grade
Au Ounces
16,000
39,000
79,000
134,000
1.4
1.5
1.8
1.7
800
1,800
4,600
7,200
(g/t Au)
Note: Due to the effects of rounding, totals may not represent the sum of all
individual components. Resources are reported as global estimates, not
constrained within optimised pit shells.
ASX Announcement 27 October 2023
Page 12
The Gilmore deposit includes mineralisation within oxidised, transitional and fresh bedrock material.
Mineralisation is hosted within a mafic sequence (basalt and dolerite) that is cross-cut by sub-parallel to
oblique intermediate porphyry intrusions and shear zones. Mineralisation occurs within sheared mafic, on
the contact with the porphyry intrusion, and within the intrusion itself. Mineralisation is associated with
quartz veining and minor disseminated pyrite within the intrusive bodies. Within the mafic lithologies,
mineralisation is associated with chlorite-biotite alteration, disseminated sulphide, and quartz veining with
shearing. Shallow to moderate south plunging mineralisation is apparent across the deposit; however,
mechanisms controlling this geometry are not definitive.
The Gilmore MRE has a strike length of 230m and extends from the near-surface down to a vertical depth
of 120m in the north (see Figure 9). Mineralisation is open down dip and along strike to the south beyond
the southern limits of the Company’s tenement boundary into M 36/107 held by Northern Star Ltd (ASX:
NST).
Figure 9: Gilmore longitudinal section looking south-west showing block model grades and drillhole traces
with grades >0.5 g/t Au.
ASX Announcement 27 October 2023
Page 13
GORDONS
The 100%-owned Gordons Project is located 35km north of Kalgoorlie. The project covers approximately
52km2 of tenure adjacent to operating mines at Gordon Sirdar and Mulgarrie and is close to both third
party and publicly owned haulage infrastructure. Significantly, it is located on the flank of the ScotiaKanowna Dome, a key regional geological feature, that is an important control on the formation of gold
mineralisation, including the multi-million ounce Kanowna Belle and Paddington deposits (Figure 10).
Figure 10: Gordons tenement plan showing location of the Gordons Project and major
prospects in relation to nearby mines
ASX Announcement 27 October 2023
Page 14
Heritage Survey/Drill Testing
During the quarter the Company completed a cultural heritage survey with members of the
Maduwongga Native Title Claimant Group and the Kakarra Part A Native Title Claimant Group.
Following the survey, heritage approval was received to undertake exploration activities on
tenements at the southern end of the project (Refer to Figure 11).
The tenements cleared for exploration include a group of prospecting licences (P P27/2325 and
P27/2359-64) that were originally part of the IPO of Yandal Resources Limited in 2018, which until
now have not been accessible for exploration drilling by Yandal due to heritage constraints.
Exploration licence E27/701 (under application), recently acquired from Moho Resources Limited
(ASX:MOH), was also cleared for exploration as part of the survey.
Area of heritage
clearance for
exploration
Figure 11: Gordon Project location map showing drill collars coloured by max Au
and the location of the Gordon Sirdar Shear Zone and splays over geology and the
approximate boundary of the heritage survey completed during the quarter.
ASX Announcement 27 October 2023
Page 15
These tenements are strategically important to the Company as they encompass the area
highlighted during our recent 3D geological modelling exercise as containing extensions of a
significant mineralised structural corridor (the Gordon Sirdar Shear Zone “GSSZ”). The GSSZ
extends through the Star of Gordon prospect and Gordon-Sirdar Gold Mine, then to the immediate
south of the Gordon Project towards the +6.4Moz Kanowna Belle mine (ASX: NST). Importantly, it
includes geological architecture permissive for the formation of significant gold deposits, including
stratigraphy interpreted to be the same or equivalent to that at Kanowna Belle, and is therefore a
high priority exploration target.
The Company is currently finalising drilling targets with the intention of commencing drill testing
priority targets in H1 2024.
LOOKING AHEAD
The Company has a very active Q4 2023 planned with priority exploration activities, including;
1. Follow-up exploration drilling is scheduled for early November across the Oblique Prospect;
this will include a number of shallow RC holes to further test the stratabound mineralisation
within the currently defined limit and to test for the host stratigraphy further south. In addition
to this, preparations are underway for diamond drilling in early 2024.
2. The refinement of exploration targets for follow-up RC drilling across the 4.2km eastern
granite margin of the NEG Prospect is underway. This will be assisted through EIS co-funding
to support the completion of two deep (400m) diamond holes across the NEG prospect.
Drilling is being scheduled for early in the 2024 field season.
3. Preparation for drill testing Quarter Moon (IWB Project) in H1 2024
4. Finalisation of exploration targets and drilling strategy across the expanded Gordons Gold
Project.
5. Review lithium potential of all three 100% owned Projects, including “bottom of hole” multielement sampling and analysis and prospectivity mapping.
CORPORATE SUMMARY
Issued Capital
The only movement in securities on issue during the September quarter was the lapsing of 500,000 Class
C Performance Rights.
As at 30 September 2023, the Company had the following securities on issue:
Type of Security
Number
Ordinary shares
157,803,079
Options
30,804,535
ASX Announcement 27 October 2023
Page 16
Performance rights
TOTAL
500,000
189,107,614
Appointment of Technical Director
During the quarter, the Company announced the appointment of Mr Chris Oorschot to the Board as a
Technical Director.
Mr Oorschot joined the Company in February 2023 as its Exploration Manager. In addition to his clear
technical expertise, Chris has quickly demonstrated his strong commercial and strategic acumen and, as
a result, has been asked to join the Board as its Technical Director.
Dedicated Investor Hub Launched
In August 2023, the Company announced the launch of its Investor Hub. The Investor Hub is a dedicated
platform for investors to learn more about Yandal and to keep up to date with our latest activities.
Visit the Investor Hub here: https://investorhub.yandalresources.com.au/
In line with our commitment to deliver transparency to all investors, Yandal will be regularly uploading new
content to the hub, including videos accompanying select announcements, education material and
interviews.
Summary of Exploration Expenditure
In accordance with Listing Rule 5.3.1, Yandal confirms that as disclosed in the Cashflow Report (item
1.2(a)), Yandal’s exploration expenditure for the quarter was approximately $774k, details of the
exploration activities underlying this expenditure are as set out in the Activities Report.
Payments to Related Parties and their Associates
In accordance with ASX Listing Rule 5.3.5, $116k was paid to related parties or their associates during
the quarter, comprising Executive Director salaries, Non-executive Director fees and superannuation.
Authorised by the board of Yandal Resources
For further information please contact:
Tim Kennedy
Managing Director
Yandal Resources Limited
yandal@yandalresources.com.au
ASX Announcement 27 October 2023
Greg Fitzgerald
Company Secretary
+61 8 9389 9021
cosec@yandalresources.com.au
Page 17
About Yandal Resources Limited
Yandal Resources listed on the ASX in December 2018 and has a portfolio of advanced gold exploration
projects in the highly prospective Yandal and Norseman-Wiluna Greenstone Belts of Western Australia.
Yandal Resources Ltd - Mineral Resource Summary
Deposit
Ironstone Well
Flushing Meadows1
Mt McClure
Challenger2
Success3
Parmelia4
HMS Sulphur5
Gilmore6
Sub-total - MMC
Gordons
Gordons Dam7
Grand-total8
Indicated
Tonnes Grade
(‘000s)
(g/t)
2,141
2,141
1.3
1.3
Au
(oz)
91,000
91,000
Inferred
Tonnes
Grade
(‘000)
(g/t)
Au
(oz)
Tonnes
(000’s)
Total
Grade
(g/t)
Au
(Oz)
5,245
1.1
177,000
7,386
1.1
268,000
718
1,255
252
1010
134
3,369
1.9
1.9
2.1
1.2
1.7
1.7
44,000
75,000
17,000
39,000
7,200
182,200
718
1,255
252
1010
134
3,369
1.9
1.9
2.1
1.2
1.7
1.7
44,000
75,000
17,000
39,000
7,200
182,200
365
8,979
1.7
1.3
20,000
379,200
365
11,120
1.7
1.4
20,000
470,200
Due to the effects of rounding, totals may not represent the sum of the individual components.
1. Reported above 0.5g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 4 November 2020 for
full details. 2. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 22 August
2022 for full details 3. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 6
September 2022 for full details.4. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement
dated 20 September 2022 for full details 5. Reported above 0.5g/t Au lower cut-off grade within this announcement 6. Reported
above 1.0g/t Au lower cut-off grade within this announcement 7. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal
Resources Ltd ASX announcement dated 6 April 2023 for full details 8. All Resources are reported as global estimates, not
constrained by optimised pit shells.
Competent Person Statements
The information in this document that relates to Exploration Results, geology and data compilation is based
on information reviewed or compiled by Mr Christopher Oorschot, a Competent Person who is a Member
of The Australasian Institute Geoscientists. Mr Oorschot is the Exploration Manager for the Company, is
a full-time employee and holds options in the Company. Mr Oorschot has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration and to the activity which he
is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Oorschot consents to the
inclusion in this announcement of the matters based on this information in the form and context in which it
appears.
The information in this announcement that relates to the Flushing Meadows, Mt McClure and Gordons
Dam Mineral Resource Estimates is based on information compiled and generated by Andrew Bewsher,
an employee of BM Geological Services Pty Ltd (“BMGS”). Both Andrew Bewsher and BMGS hold shares
in the company. BMGS consents to the inclusion, form and context of the relevant information herein as
derived from the original resource reports. Mr Bewsher has sufficient experience relevant to the style of
mineralization and type of deposit under consideration and to the activity which is being undertaken to
ASX Announcement 27 October 2023
Page 18
qualify as a Competent Person as defined in the 2012 Edition of the JORC ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’.
YRL confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement. The company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
Forward Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include, but
are not limited to, statements concerning Yandal Resources Limited’s (Yandal’s) current expectations,
estimates and projections about the industry in which Yandal operates, and beliefs and assumptions
regarding Yandal’s future performance. When used in this document, words such as “anticipate”, “could”,
“plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are
forward-looking stateme
Share your feedback
Discover