Arrakis Results Confirm New High-grade Domain
Released
Released
Announcement PDF
Contact Us
A: Suite 1, Level 3, 1138 Hay Street,
West Perth WA 6005
T: +61 (0)8 9389 9021
E: yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL
Board and Management
Chris Oorschot Managing Director/CEO
Greg Evans Non-Exec Chair
Katina Law Non-Exec Director
Chris Newman Non-Exec Director
Greg Fitzgerald Company Secretary
Further High-Grade Results from Arrakis
Confirm New High-Grade Domain
RC Drilling Highlights
• Yandal Resources has received further assay results from a targeted infill RC
and diamond core drilling program across the Arrakis gold discovery.
• Significant Intercepts include:
o 17.5m @ 2.3g/t Au from 127.5m in 26IWBRC0121D (ETW*1 14m), including
3.8m @ 2.8g/t Au from 130.7m; and
4.8m @ 4.0g/t Au from 135.5m
o 17.0m @ 1.1g/t Au from 162.0m in 26IWBRC0121D (ETW*1 10m), including
1.6m @ 3.8g/t Au from 31m, and
o 10m @ 1.8g/t Au from 42m in 26IWBRC0129 (ETW*1 8m), situated in the
hanging wall of the Arrakis structure, including
4m @ 1.9g/t Au from 42m, and
2m @ 4.8g/t Au from 50m
• The 26IWBRC0121D intercept is situated approximately 50m down-dip of
the previously reported 6m @ 28.3g/t intercept from 26IWBRC0120 (See
ASX release 10 August 2026).
• Geological interpretations indicate these results reside within a 100m to
150m striking zone of higher-grade mineralisation, plunging to the south.
• Significantly, the down-plunge projection of the high-grade domain
remains untested below the Yueh Shear Zone, presenting a clear target
for further drilling.
ASX Announcement
25 August 2026
*1 ETW - Estimated True Width
For further information or to ask questions in response to this announcement, please
visit our Investor Hub at https://yandalresources.com.au/link/P4NM9e
yandalresources.com.au | ASX:YRL 2
Commenting on the RC drilling results, Yandal Resources’ Managing Director, Mr. Chris
Oorschot, said: “Today’s results provide further support for a third high-grade domain
within the Arrakis mineralised system, first defined after the 6m @ 28.3g/t Au
intercept reported two weeks ago. Interpretations suggest a south-plunging
domain of higher-grade mineralisation, striking between 100m to 150m.
Given the interpreted south-plunging geometry of the new high-grade domain,
the new domain remains untested below the Yueh Shear Zone, an intense zone of
mylonitisation where Arrakis mineralisation is structurally disrupted and attenuated,
providing a strong at-depth target for future drilling. Previously reported results from
diamond hole 26IWBRC0066D (with 11.5m @ 1.6g/t Au, including 5.0m @ 3.1g/t Au
and 21.7m @ 0.8g/t Au, including 4m @ 2.1g/t Au) demonstrated that significant
mineralisation occurs below the Yueh Shear Zone.”
Yandal Resources Ltd (ASX: YRL, “Yandal Resources” or the “Company”) is pleased to
provide an exploration update for the Arrakis Prospect within the Ironstone Well-Barwidgee
(IWB) Gold Project, situated in the Yandal Greenstone Belt of Western Australia(see Figures 4
and 5).
Targeted broad-spaced infill RC drilling and subsequent diamond tails on 100m spaced
drilling lines across the currently defined 1.3km Arrakis discovery commenced in early May.
The drilling was designed to test for high-grade domains within the 1.3km striking Arrakis
mineralised system. Complete results from a further eight RC holes between the 6,350mN and
7,250mN drill lines have been received and reported below (see Tables 2, 3).
Assay results include significant intercepts approximately 50 m down-dip of the high-grade
26IWBRC0120 results (see ASX release 10 August 2026), located on the 6,650mN section (see
Figure 1). The results confirm the presence of an additional high-grade domain (see Figure 2,
Domain C) within the Arrakis gold discovery, with interpretations suggesting a possible steep-
to-moderate south plunge. This represents the third potential high-grade domain identified
within the Arrakis mineralised system to date (See Figure 2, Domains 1, 2 and 3). The
extrapolation of the high-grade domain down-plunge offers a strong target for further drilling
below the Yueh Shear Zone.
Results from a further two diamond tails (Figure 2) are anticipated in early September.
yandalresources.com.au | ASX:YRL 3
Figure 1: Arrakis 6,650mN cross-section showing all recently received drilling results, including significant
intercepts from 26IWBRC0120 and 26IWBRC0121D. The section location is shown in Figure 3. The section
shows all drilling within +/- 25m of the section plane.
Cross-Section
6,650mN
northwest facing
Transported Cover
Surface
BOCO
Dolerite
TOFR
Pillow
Basalt
15m @ 1.2g/t Au
Incl. 5m @ 2.4g/t Au
6m @ 1.5g/t Au
Incl. 3.8m @ 2.9g/t Au
14m @ 0.5g/t Au
20m @ 8.7g/t Au
Incl. 6m @ 28.3g/t Au
Incl. 3m @ 52.8g/t Au
12m @ 1.8g/t Au
Incl. 2m @ 2.7g/t Au
& 3m @ 4.9g/t Au
17.5m @ 2.3 g/t Au
Incl. 3.8m @ 2.8g/t Au,
& 4.8m @ 4.0g/t Au
17.0m @ 1.1 g/t Au
Incl. 1.6m @ 3.8g/t Au
< Diamond Core Tail Start
yandalresources.com.au | ASX:YRL 4
Arrakis Targeted Infill RC Drilling Results
Assay results from a further seven (7) RC holes and one (1) diamond core tail have been received
from between the 6,350mN and 7,350mN drill lines (see Figures 2 and 3). Significant Arrakis
intercepts from these holes include:
o 17.5m @ 2.3g/t Au from 127.5m in 26IWBRC0121D (ETW*1 14m), including
3.8m @ 2.8g/t Au from 130.7m; and
4.8m @ 4.0g/t Au from 135.5m
o 17.0m @ 1.1g/t Au from 162.0m in 26IWBRC0121D (ETW*1 10m), including
1.6m @ 3.8g/t Au from 31m,
(RC pre-collar results previously reported on 10 August 2026)
*1 ETW - Estimated True Width
Results from the Arrakis 6,650mN section (Figure 1) demonstrate an emerging high-grade domain
situated in the footwall of the Arrakis structure, and directly below an intermediate porphyry. Up
to three parallel zones of mineralisation are evident within the 6,650mN section.
Results from 26IWBRC0119, 26IWBRC0120, and 26IWBRC0121D, combined with previously reported
intercepts from 25IWBRC0042 (see ASX release 24 September 2025) that intercepted 50m @ 1.3g/t
Au, including 28m @ 1.9g/t Au, define a new high-grade domain (Domain 3 in Figure 2) within the
1.3km striking Arrakis system (see Figure 2). Diamond tail 26IWBRC0117D located on the 6,450mN
line intercepts the projected down-plunge position of the new high-grade domain; however, this
intercept sits within the projected influence of the Yueh Shear Zone (a series of shallow-dipping
mylonite shears that disrupt and attenuate Arrakis mineralisation). An interpreted ten-metre
interval of mylonitised equivalent of the Arrakis host structure has been identified in
26IWBRC0117D. Results are anticipated in early September.
Twenty-four (24) RC holes have been completed on targeted 100 m-spaced lines across the
Arrakis gold discovery from the 6,250mN to 7,250mN drill lines. Short diamond tails were
completed on three RC holes that failed to reach the designed depth. Previously reported results
from 16 holes of the program have already been disclosed in ASX releases dated 9 June 2026
and 10 August 2026.
yandalresources.com.au | ASX:YRL 5
Several intercepts outside of the main Arrakis structure have also been intercepted, including:
o 10m @ 1.8g/t Au from 42m in 26IWBRC0129 (ETW*1 8m), situated in the
hanging wall of the Arrakis structure, including
4m @ 1.9g/t Au from 42m, and
2m @ 4.8g/t Au from 50m
This follows previously reported intercepts (See ASX release 10 August 2026) outside of the main
Arrakis mineralised structure, including:
o 2m @ 3.6g/t Au from 139m in 26IWBRC0115
o 13m @ 0.5g/t Au from 139m in 26IWBRC0115 (ETW*1 10m)
o 6m @ 0.7g/t Au from 139m in 26IWBRC0117
In all instances, these intercepts are located within either weathered or partially weathered rock
(see Figure 2 for approximate position of mineralisation relative to main Arrakis structure), with no
significant intercepts down-dip within the equivalent fresh rock position. This suggests the
mineralisation is secondary in nature. Broadly, this style of mineralisation is striking parallel to the
main Arrakis trend but dipping approximately 40º to the northeast. See Figure 1 for an example
of hanging wall mineralisation in the upper portion of 26IWBRC0121D.
Results from a further two (2) diamond core tails are yet to be received. Results are anticipated
in early September.
yandalresources.com.au | ASX:YRL 6
Figure 2: A longitudinal section displaying intercept midpoints within the main Arrakis mineralised structure (intercepts from subordinate structures are excluded). Grade
accumulation (length multiplied by Au grade) is based on down-hole length, with no true width correction applied. This longitudinal section has been prepared to show the
distribution of recent intercepts across the interpreted Arrakis trend. Contours are based on grade (g/t Au) multiplied by down-hole length (m) values, and are presented to
provide a visual interpretation of high-grade domains across the Arrakis mineralised system. Please note that closer-spaced drilling is needed to verify geological and grade
continuity along strike. Closer-spaced drilling is also needed to verify the geometry and extent of the higher-grade domains contoured in this longitudinal section.
Scale
200m
NORTHWEST
Surface
BOCO
Arrakis
Longitudinal Section
southwest facing
SOUTHEAST
Primary Arrakis Structure >1.3km
26IWBRC0120
20m @ 8.7g/t Au
Incl. 6m @ 28.3g/t Au
Incl. 3m @ 52.8g/t Au
Long-section Plots Confirmed Intercepts
Within the Primary Arrakis Structure Only
Transported Cover
26IWBRC0121D
15m @ 1.2g/t Au, Incl. 5 m @ 2.4g/t (Prev. Rptd)
17.5m @ 2.3 g/t Au, Incl. 3.8m @ 2.8g/t Au,
& 4.8m @ 4.0g/t Au, followed by
17.0m @ 1.1 g/t Au, Incl. 1.6m @ 3.8g/t Au
Domain A
Domain B
Domain C
26IWBRC0117D
Assays Pending
26IWBRC0116D
Assays Pending
25IWBRC0042
50m @ 1.3 g/t Au incl.
28m @ 1.9g/t Au
ASX 24 September 2025
26IWBRC0066D- 11.5m @ 1.6g/t Au, Incl. 5.0m @
3.1g/t Au & 21.7m @ 0.8g/t Au Incl. 4m @ 2.1g/t Au
yandalresources.com.au | ASX:YRL 7
Figure 3: A collar plan over the Arrakis Prospect within the Caladan target area, overlying a
ground gravity image (BA267 1VD linear colour scale, with northeast shade). All Yandal drilling is
plotted (historic drilling has been excluded). Collars are thematically coloured by max Au (g/t) in
the hole. Dashed yellow polygons represent air-core regolith anomalies (Results include ~4m @ 0.1
g/t Au or greater, with the upper profile or the bottom-of-hole sample is 0.1g/t Au or greater).
Caladan
Fold
1000m
25IWBAC096
9m @ 1.2 g/t Au
Anders Air-core
Trend
26IWBRC0120
20m @ 8.7g/t Au
Incl. 6m @ 28.3g/tAu
26IWBRC0121D
15m @ 1.2g/t Au,
Incl. 5m @ 2.4g/t
17.5m @ 2.3 g/t Au,
Incl. 3.8m @ 2.8g/t Au,
& 4.8m @ 4.0g/t Au,
17.0m @ 1.1 g/t Au,
Incl. 1.6m @ 3.8g/t Au
26IWBRC0129
10m @ 1.8g/t Au
Incl. 4m @ 1.9g/t Au
& 2m @ 4.8g/t Au
yandalresources.com.au | ASX:YRL 8
Next Steps and Looking Ahead
Results from a further two diamond core tails are anticipated in early September. Drilling activities
on site have been paused to allow time for all outstanding assays to be received.
Notable near-term activities and news flow from recently completed and ongoing drilling
programs include;
Arrakis Discovery
• Final diamond core drilling results from targeted infill drilling across the Arrakis
discovery are expected in early September;
• First results from the Anders (parallel to Arrakis) target are anticipated in early
September
Flushing Meadows (MRE 268koz @ 1.1g/t Au, see Table 1)
• Further results from the diamond drilling program are expected throughout
August and September.
• Air-core drilling is complete over the broader Flushing Meadows and parallel
Giedi Prime target areas, with first results expected in September.
• Follow-up RC drilling to the 26IWBRC0098DA and 26IWBRC0099D intercepts (see
ASX release 15 June 2026) is complete, with results expected in early September.
New England Granite Target Area
• Drilling of the high-grade target (6m @ 6.3g/t Au from 36m, including 2m @
18.2g/t from 36m) identified at the Salusa Prospect is complete, with results
expected in early September.
• Follow-up RC drilling testing recently reported oxide intercepts at Siona (see ASX
release 13 July 2026) is complete, with results expected in early September.
• Further air-core drilling across the western side of the New England Granite
target area will commence pending final heritage clearance.
Authorised by the board of Yandal Resources
Chris Oorschot
Managing Director
Yandal Resources Limited
yandal@yandalresources.com.au
Lucas Robinson
Corporate Storytime
+61 408 228 889
lucas@corporatestorytime.com
yandalresources.com.au | ASX:YRL 9
Arrakis Geology & Mineralisation Overview
The Arrakis Prospect is located at the centre of the IWB Gold Project, within the Yandal
Greenstone Belt of Western Australia. The prospect is defined by a > 2.2 km regolith gold anomaly
defined by air-core drilling in 2025. The prospect lies beneath 4m to 20m of transported cover.
The depth of weathering varies along strike, with the base of fresh rock typically between 80m to
120m from surface. To date, primary fresh rock mineralisation has been defined over more than
1.3km of strike, with true widths ranging from 4m to > 30m.
Arrakis mineralisation is hosted within a deformed porphyritic dacite intrusive that varies in
thickness both along strike and down-dip. The intrusive appears to be intruding parallel to
stratigraphy (stratiform), possibly along a narrow sedimentary horizon between two mafic units.
Steep north-east dipping mineralisation hosted within the intrusive is bracketed by a sequence of
pillow basalts to the east and a dolerite unit to the west.
A compilation of RC and diamond drilling results and geological observations demonstrates two
separate styles of mineralisation at Arrakis:
• A broad lower-grade style of mineralisation hosted within a silica-sericite altered dacite
porphyritic intrusive unit that has been weakly to moderately fractured. The chlorite-
biotite-filled fractures also contain pyrite and minor arsenopyrite. Fine pyrite and
arsenopyrite are also disseminated throughout the altered intrusive host. This style of
mineralisation is often associated with wider zones of mineralisation.
• A second style of higher-grade mineralisation is associated with a more intense level of
brittle-ductile deformation and strong silica-pyrite-arsenopyrite alteration of the dacitic
porphyry margins, often presenting as a clast-supported breccia that is pervasively silica-
altered. This style of mineralisation can also be sheared and intercalated (mixed) with
the bounding basalts and dolerites.
Structural observations from diamond drilling indicate strong strike-slip, sinistral shearing. Mineral
lineations broadly plunge shallowly to the northwest. Two dominant ductile shear fabrics have
been observed: a subparallel fabric and a shallower-dipping, northwest-striking fabric. The latter
often exhibits as a mylonite and may disrupt or attenuate mineralisation.
The position of the dacitic intrusion and the thickness of the higher-grade mineralisation are likely
to be structurally controlled.
yandalresources.com.au | ASX:YRL 10
About Yandal Resources Limited
Yandal Resources has a portfolio of advanced gold exploration projects in the highly prospective Yandal
and Norseman-Wiluna Greenstone Belts of Western Australia.
Ironstone Well-Barwidgee Gold Project
The 100% owned Ironstone Well-Barwidgee (IWB) Gold Project covers approximately 456km² of highly
prospective and under-explored tenure located between the Jundee and Bronzewing mines in the
northern Yandal Greenstone Belt. Yandal has an established Resource of 268,000oz of gold at Flushing
Meadows (within IBW) and considers there to be strong potential to make new discoveries and expand
this resource base within its extensive tenure holding. (Refer to the ASX announcement of 4 November
2020 and Table 1 for details of the Flushing Meadows Resource).
The IWB project area also includes two new gold discoveries, the Arrakis and Siona Prospects, both made
within the last two years. These outcomes were driven by the execution of a targeted exploration
program that followed a systematic, geologically driven strategy that was developed in early 2023. The
Arrakis Prospect is hosted within the Caladan fold, and the Siona Prospect is hosted within the New
England Granite.
Both discoveries are currently at an early stage but progressing well, with future activities focused on
delineating the scale of each of the newly defined mineralised systems.
The IWB Gold Project also includes several advanced prospects, where limited historic and YRL drilling has
returned robust gold intercepts, indicating the potential for shallow oxide mineralisation. Both the early-
stage and more advanced prospects are the focus of ongoing exploration.
Mt McClure
The Mt McClure Gold Project, acquired in August 2022, is located ~15 km southwest of the historic
Bronzewing Mine and includes three mining leases with JORC 2012 Resources totalling 182,200oz Au.
The project has prospectivity for new shallow gold deposits adjacent to current Resources and in the
footwall and hanging wall of the stratigraphy. Ground gravity survey data support ongoing
structural/stratigraphic interpretations for 2026 targeting.
yandalresources.com.au | ASX:YRL 11
Figure 4: Yandal Resource exploration Project locations within the Yandal Greenstone Belt.
The Arrakis Prospect is located within the Caladan target area.
King of the Hills
Thunder Box
Darlot
Bellevue
Kathleen Valley
Mt Keith
Wiluna
Jundee
Bronzewing
Wiluna
Leinster
New England Granite
Siona Discovery
Flushing Meadows
Deposit 268koz
Caladan Target area
Arrakis Discovery
0 100km
Ironstone Well-
Barwidgee Gold Project
Mt McClure Gold
Project 182koz
Dingo Range Project
yandalresources.com.au | ASX:YRL 12
Figure 5: Yandal Resource exploration target areas and prospect locations within the northern
Yandal Greenstone Belt. The Arrakis Prospect is located within the Caladan target area.
5km
Salusa
Caladan
Target Area
Siona
Flushing Meadows
(268Koz)
New England
Granite
Nayla Target
Area
Geidi Prime
Target Area
5km
Radius
Arrakis
Discovery
Irulan Dolerite
Complex
yandalresources.com.au | ASX:YRL 13
Table 1 – Yandal Resources Ltd - Mineral Resource Summary
Deposit
Indicated Inferred Total
Tonnes
(‘000s)
Grade
(g/t)
Au
(oz)
Tonnes
(‘000)
Grade
(g/t)
Au
(oz)
Tonnes
(000’s)
Grade
(g/t)
Au
(Oz)
Ironstone Well
Flushing Meadows1 2,141 1.3 91,000 5,245 1.1 177,000 7,386 1.1 268,000
Mt McClure
Challenger2 718 1.9 44,000 718 1.9 44,000
Success3 1,255 1.9 75,000 1,255 1.9 75,000
Parmelia4 252 2.1 17,000 252 2.1 17,000
HMS Sulphur5 1010 1.2 39,000 1010 1.2 39,000
Gilmore6 134 1.7 7,200 134 1.7 7,200
Sub-total - MMC 3,369 1.7 182,200 3,369 1.7 182,200
Grand-total7 2,141 1.3 91,000 8,614 1.3 359,200 10,755 1.3 450,200
Due to the effects of rounding, totals may not represent the sum of the individual components.
1. Reported above 0.5g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 4 November 2020 for full
details. 2. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 22 August 2022 for
full details 3. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 6 September
2022 for full details. 4. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 20
September 2022 for full details. 5. Reported above 0.5g/t Au lower cut-off grade within this announcement 6. Reported above 1.0g/t
Au lower cut-off grade within this announcement. 7. All Resources are reported as global estimates, not constrained by optimised pit
shells.
Competent Person Statement
The information in this document related to Exploration Targets and Exploration Results, geology and data
compilation is based on information reviewed or compiled by Mr Christopher Oorschot, a Competent
Person who is a Member of The Australasian Institute of Geoscientists. Mr Oorschot is the Managing Director
of the Company, is a full-time employee and holds shares and options in the Company. Mr Oorschot has
sufficient experience, which is relevant to the style of mineralisation and type of deposit under
consideration, and to the activity which he is undertaking to qualify as a Competent Person as defined in
the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr Oorschot consents to the inclusion in this announcement of the matters based on this
information in the form and context in which it appears.
The information in this announcement that relates to the Flushing Meadows and Mt McClure Mineral
Resource Estimates is based on information compiled and generated by Andrew Bewsher, an employee
of BM Geological Services Pty Ltd (“BMGS”). Both Andrew Bewsher and BMGS hold shares in the company.
BMGS consents to the inclusion, form and context of the relevant information herein as derived from the
original resource reports. Mr Bewsher has sufficient experience relevant to the style of mineralisation and
type of deposit under consideration and to the activity which is being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the JORC ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’.
YRL confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
yandalresources.com.au | ASX:YRL 14
Forward Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include, but
are not limited to, statements concerning Yandal Resources Limited’s (Yandal’s) current expectations,
estimates and projections about the industry in which Yandal operates, and beliefs and assumptions
regarding Yandal’s future performance. When used in this document, words such as “anticipate”, “could”,
“plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are
forward-looking statements. Although Yandal believes that its expectations reflected in these forward-
looking statements are reasonable, such statements are subject to known and unknown risks, uncertainties
and other factors, some of which are beyond the control of Yandal, and no assurance can be given that
actual results will be consistent with these forward-looking statements. Drilling results presented indicate
geological potential for mineralisation, but there can be no certainty that these results will eventually form
part of a Mineral Resource Estimate.
Table 2 – Arrakis RC drilling program collar location summary; please note that three holes have
diamond tails. The coordinates below are derived from a DGPS and are accurate to within +/- 0.1m.
Hole type RCD indicates RC holes with diamond tails.
Hole ID
Hole
type
East
(m)
North
(m)
RL
(mAHD
)
Azimuth
(degrees)
Dip
(degrees)
RC Total
Depth
(m)
Diamond
Core Depth
(m)
26IWBRC0116D RCD 286942.8 7027595.0 522.4 225 -60 159 273.3
26IWBRC0117D RCD 287286.2 7027367.0 522.3 225 -57 157 306.2
26IWBRC0121D RCD 287067.1 7027446.1 522.5 225 -60 232 231.7
26IWBRC0123 RC 286766.2 7027692.8 522.8 225 -55 222 -
26IWBRC0124 RC 286788.8 7027716.8 522.7 225 -58 262 -
26IWBRC0125 RC 286814.6 7027743.8 522.6 225 -60 311 -
26IWBRC0126 RC 286620.7 7027831.5 522.9 225 -55 177 -
26IWBRC0127 RC 286631.6 7027842.2 523.0 225 -60 242 -
26IWBRC0128 RC 286659.0 7027869.0 522.8 225 -60 250 -
26IWBRC0129 RC 286896.3 7027555.6 522.6 225 -60 247 -
26IWBRC0130 RC 287238.7 7027189.0 522.8 225 -55 137 -
yandalresources.com.au | ASX:YRL 15
Table 3 – Arrakis Prospect - Summary of significant RC assay results >0.3g/t Au with no more than 4m of
continuous internal waste included unless otherwise stated. All intercept lengths are reported as down-
hole lengths.
Hole
ID
Sample
type / Sub
Interval
From
(m)
To
(m)
Interval
(m)
Au
(g/t)
Comment
26IWBRC0116D 1m RC 60 69 9 0.5 Completely weathered, RC pre-collar only
26IWBRC0121D HQ Core 127.5 145 17.5 2.3
Weakly weathered to fresh rock, RC pre-
collar previously reported
26IWBRC0121D Including 130.7 134.5 3.8 2.8 Weakly Weathered
26IWBRC0121D Including 135.5 140.3 4.8 4.0 Weakly Weathered
26IWBRC0121D Including 142.9 144.3 1.4 2.6 Fresh rock
26IWBRC0121D HQ Core 162.0 179.0 17 1.1 Fresh rock
26IWBRC0121D Including 164.0 165.6 1.6 3.8 Fresh rock
26IWBRC0123 1m RC 38 39 1 1.8 Completely weathered
26IWBRC0123 1m RC 93 94 1 0.6 Completely weathered
26IWBRC0123 1m RC 104 105 1 0.5 Moderately weathered
26IWBRC0124 1m RC 97 103 6 1.7 Completely weathered
26IWBRC0124 1m RC 215 216 1 0.5 Fresh rock
26IWBRC0124 1m RC 221 222 1 0.5 Fresh rock
26IWBRC0125 1m RC 119 120 1 0.5 Moderately weathered
26IWBRC0125 1m RC 273 274 1 0.5 Fresh rock
26IWBRC0125 1m RC 278 279 1 0.3 Fresh rock
26IWBRC0125 1m RC 284 286 2 0.4 Fresh rock
26IWBRC0126 1m RC 108 109 1 1.8 Completely weathered
26IWBRC0126 1m RC 140 141 1 0.9 Fresh rock
26IWBRC0126 1m RC 149 150 1 0.4 Fresh rock
26IWBRC0126 1m RC 157 162 5 0.9 Fresh rock
26IWBRC0127 1m RC 195 197 2 0.7 Fresh rock
26IWBRC0128 1m RC 104 105 1 2.2 Moderately weathered
26IWBRC0129 1m RC 42 52 10 1.8
Moderately weathered, HW structure,
Arrakis intercept previously reported
26IWBRC0129 Including 42 46 4 1.9 Moderately weathered
26IWBRC0129 Including 50 52 2 4.8 Moderately weathered
26IWBRC0130 1m RC 157 164 7 0.8 Fresh rock
yandalresources.com.au | ASX:YRL 16
Relevant Previous ASX Announcements
• Arrakis Returns 20m @ 8.7g/t Au from 84m, 10 August 2026
• Arrakis Diamond Drilling Confirms High-Grade Gold at Depth, 6 July 2026
• Gold Discoveries Expanding Across the IWB Project, 9 June 2026
• First Arrakis RC Results Extend High-grade Mineralisation, 28 April 2026
• 2026 Exploration Commences Across the IWB Gold Project, 23 March 2026
• Arrakis RC Results Show High-Grade Mineralisation Potential, 15 January 2026
• Arrakis Diamond Drilling Delivers Strong Results, 8 December 2025
• First Arrakis Diamond Results & RC Drilling Underway, 24 November 2025
• Final Arrakis RC Results with Diamond Drilling to Commence, 13 October 2025
• Arrakis Gold Discovery Extended by 400m, 24 September 2025
• Arrakis Gold Discovery Confirmed With 54m @ 1.2g/t Au, 22 September 2025
• Arrakis RC Drilling Complete & All AC Results Now Received, 17 September 2025
• RC Drilling Commences Across Arrakis, 1 September 2025
• Arrakis Extended to Over 2.2km in Strike, 18 August 2025
• Caladan AC Results Further Extend Arrakis Mineralisation, 31 July 2025
• Caladan AC Shows Early Signs of Scale, 10 July 2025
• Caladan Air-Core Drilling Program Commences, 5 June 2025`
• RIU Sydney Presentation, 7 May 2025
• Arrakis RC Drilling Results, 30 April 2025
• Ironstone Well-Barwidgee Exploration Update, 25 February 2025
• Caladan Air-Core Drilling Demonstrates Discovery Potential, 15 January 2025
• Air-core Drilling Commences Across Caladan and Irulan, 10 October 2024
• Oblique Diamond Drilling Results, 3 September 2024
• IWB Soil Results and NEG Diamond Drilling Complete, 12 August 2024
• Large-scale Gold Anomalies Across Emerging Targets, 15 July 2024
• Gold Coast Investment Showcase Presentation, 20 June 2024
• Exploration Update – IWB Ground Gravity Survey, 11 June 2024
ASX Announcement 25 August 2026 Page 17
Appendix 1 – Ironstone Well-Barwidgee Gold Project, Arrakis RC and Diamond Core
JORC Code (2012) Table 1, Sections 1 and 2
Mr Christopher Oorschot, Managing Director of Yandal Resources, compiled the information in Section 1 and Section 2 of the following JORC Table 1 and
is the Competent Person for those sections. The following Table and Sections are provided to ensure compliance with the JORC Code (2012 edition)
requirements for the reporting of Exploration Results.
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
• Yandal Resources has completed RC drilling across both 100m lines covering the Arrakis
Prospect, where primary gold mineralisation has been identified along 1.3km of strike
• The drilling involved a 139mm face sampling bit down to between 140m and 286m. Holes were
drilled at an angle of -60 ° to the southwest or northeast.
• Yandal Resources (YRL) RC drilling samples were collected via a rig-mounted static cone
splitter, splitting approximately 12.5% of the total sample volume. Two splits are collected for
each metre: a primary and a duplicate sample. The primary 1m samples are then sent to a lab
for further analysis. The duplicate samples are retained on-site unless they are submitted as
routine duplicates.
• Yandal Resources has completed several short diamond core tails on RC pre-collars above, in
order to achieve target depths. All diamond tail extensions utilised HQ (diameter of ~63.5mm)
diamond core. The core was halved with a core saw, with the right-hand side (looking
downhole) sampled. Before sampling, a company geologist logs the core for lithology type,
veining, alteration, and deformation. Sample lengths vary according to logged geological
intervals of interest, with a minimum of 0.2 metres and a maximum of 1.0 metres. Sample quality
is considered high.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• For YRL RC drilling, the cone splitter is regularly cleaned and inspected. The 1m bulk samples
are laid out in drill order. These bulk samples are regularly inspected for contamination, and
the volu
Share your feedback
Discover