First Arrakis RC Results Extend High-grade Mineralisation
Released
Released
Announcement PDF
Contact Us
A: Suite 1, Level 3, 1138 Hay Street,
West Perth WA 6005
T: +61 (0)8 9389 9021
E: yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL
Board and Management
Chris Oorschot Managing Director/CEO
Greg Evans Non-Exec Chair
Katina Law Non-Exec Director
Chris Newman Non-Exec Director
Greg Fitzgerald Company Secretary
Arrakis RC Drilling Results Extend High-Grade Mineralisation
RC Drilling Highlights
• Yandal has received the assay results from the first two extensional RC
drillholes completed southeast of the Arrakis gold discovery.
• Significant Intercepts from the 6,050mN drill line include:
o 27m @ 1.2g/t Au from 87m in 26IWBRC0065 (ETW*1 20m), including
2m @ 5.1g/t Au from 89m, and
5m @ 2.7g/t Au from 100m
o 12m @ 2.3g/t Au from 152m in 26IWBRC0067 (ETW*1 10m), including
6m @ 3.7g/t Au from 152m
o 3m @ 2.0g/t Au from 39m in 26IWBRC0065, including
1m @ 4.1g/t Au from 39m
• These results from the 6,050mN section extend primary mineralisation
approximately 100m to the southeast and confirm the presence of higher-
grade mineralisation within fresh rock, further supporting the concept of
an underground exploration target within the Arrakis gold discovery.
• Extensional RC drilling a further 100-200m to the southeast (assays
pending) suggests the presence of an interpreted north-south offsetting
structure. The ongoing extensional exploration RC program will continue to
target the untested primary Arrakis structure beyond the interpreted offset.
• Further RC results from the Arrakis extensional drilling program are
anticipated in 2-3 weeks' time.
• Three additional diamond drillholes have also been completed at Arrakis,
with assay results pending and expected in 4-6 weeks' time.
• This diamond rig is now being mobilised to Flushing Meadows to commence
eight 200m spaced exploration holes below the shallow 1.9km striking
268koz Mineral Resource.
ASX Announcement
28 April 2026
*1 ETW - Estimated True Width
For further information or to ask questions in reaction to this announcement, please
visit our Investor Hub at https://yandalresources.com.au/link/PQRmzy
yandalresources.com.au | ASX:YRL 2
Commenting on the extensional results, Yandal Resources’ Managing Director, Mr. Chris
Oorschot, said: “We are very pleased to start the 2026 drilling campaign with such
positive results. These extensional RC drilling results at Arrakis continue to strengthen
our confidence in the scale and potential of the early-stage gold discovery made
late in 2025. We are now also starting to see strong evidence of mineralisation
continuity along strike with our first 100m-spaced drill line, and further evidence of
mineralisation continuity down dip.
Critically, the grade of gold mineralisation appears consistent, typically including a
higher-grade zone greater than 2.0 g/t Au within the broader mineralised intercept.
This higher-grade mineralisation is occurring within a similar position, both along
strike and down dip, providing strong support for pursuing exploration across Arrakis
that targets both an open-pit and underground mineralisation opportunities.”
Yandal Resources Ltd (ASX: YRL, “Yandal Resources” or the “Company”) is pleased to
provide an exploration update for the Arrakis Prospect within the Ironstone Well-Barwidgee
Gold Project (see Figures 5 and 6).
RC exploration drilling recommenced at Arrakis in early April. The drilling was designed to
extend primary gold mineralisation south-eastward from the 6,150mN section (local grid),
utilising 100m-spaced lines. To date, three 100m spaced sections have been completed,
which include eight (8) RC holes for 1,800m of drilling. Results from the first two of the eight
RC holes have been received and reported below (see Tables 3, 4 and 5).
Assay results from the first two holes, located on the 6,050mN section, have been received
and are now reported (see Figures 1, 2 and 3). These RC results confirm primary mineralisation
extends a further 100m to the southeast.
Results also continue to demonstrate a consistently higher-grade (>2.0 g/t Au) zone within
broader mineralised intercepts, supporting the concept of an underground exploration
target for Arrakis.
Geological logging from both the 5,950mN and 5,850mN sections (assay results not yet
received) suggests the presence of an offsetting shear zone (see Figure 4). The geological
interpretations indicate the potential for a broad, 100-200m-wide, north-south-striking shear
zone that may offset the Arrakis structure to the north. Extensional RC drilling has now re-
focused and is targeting the offset continuation of the Arrakis structure to the southeast.
In addition to RC drilling results, two diamond holes and one diamond tail have been
completed across the currently defined Arrakis mineralised structure. All three holes have
successfully intercepted the Arrakis structure with assays pending. An Infill ground gravity
survey will also commence in early May to support litho-structural interpretations and identify
additional discovery opportunities across the Arrakis discovery and the broader Caladan
target area.
yandalresources.com.au | ASX:YRL 3
Figure 1: 6,050mN cross-section showing all drilling results from 26IWBRC0065 and
26IWBRC0067. Results for 26IWBRC0069 have not yet been received. The section location is
shown in Figure 2. The section shows all drilling within +/- 25m of the section plane.
Cross-Section
6,050mN
northwest facing
Transported Cover
Surface
Dolerite
TOFR
3m @ 2.0g/t Au
Incl. 1m @ 4.1g/t Au
Pillow
Basalt
12m @ 2.3g/t Au
Incl. 6m @ 3.7g/t Au
27m @ 1.2g/t Au
Incl. 2m @ 5.1g/t Au &
5m @ 2.7g/t Au
Awaiting Results
ETA 1-2 weeks
yandalresources.com.au | ASX:YRL 4
Arrakis Extensional RC Drilling Results
Eight RC holes have been completed on three, 100m spaced lines to identify southeast strike
extensions of the primary Arrakis mineralisation through a zone of interpreted structural
complexity. Assay results from only the first two Arrakis extensional RC holes have been received
from the 6,050mN section (see Figures 1, 2 and 3) and include:
o 27m @ 1.2g/t Au from 87m in 26IWBRC0065 (ETW*1
20m), including
2m @ 5.1g/t Au from 89m, and
5m @ 2.7g/t Au from 100m
o 12m @ 2.3g/t Au from 152m in 26IWBRC0067 (ETW*1
10m), including
6m @ 3.7g/t Au from 152m
These results are located between 80m and 130m along strike from 6,150mN section intercepts
(previously reported, see ASX releases that include 24 November 2025, 8 December 2025 and 15
January 2026), which included:
o 24m @ 1.3g/t Au from 136m in 25IWBRC0051 (ETW*1 16m), including
7m @ 2.8g/t Au from 137m
o 17.70m @ 1.4g/t Au from 309.30m in 25IWBDD0011 (ETW*1 of 12m), including
7.95m @ 2.5g/t Au from 310.25m
o 56.50m @ 1.3g/t Au from 108m in 25IWBRC0040D (ETW*1 32m), including
14.75m @ 3.3g/t Au from 149m
*1 ETW - Estimated True Width m
These latest results also indicate the presence of a parallel zone of mineralisation above (in the
hanging wall of) the Arrakis structure, associated with the interpreted upper margin of a
sedimentary package (see Figure 1). This includes intercepts of:
o 3m @ 2.0g/t Au from 39m in 26IWBRC0065, including
1m @ 4.1g/t Au from 39m
o 12m @ 0.2g/t Au from 87m in 26IWBRC0067 (includes additional internal waste)
Results from the 6,050mN section continue to demonstrate:
• Strong along-strike mineralisation continuity of gold mineralisation with a consistent
mineralisation style and geometry (see Figures 1 and 3),
• A consistent >2.0g/t Au higher-grade zone within broader mineralisation associated with
the eastern (or hanging-wall) margin (contact) of the mineralised zone.
yandalresources.com.au | ASX:YRL 5
The continuous nature of mineralisation and relatively simple geometry provide the Company
with increased confidence in the geological model underpinning the Arrakis Prospect.
Furthermore, the consistent presence of higher-grade mineralisation along the eastern margin
supports targeting deeper, higher-grade mineralisation as drilling advances throughout 2026.
Figure 2: A collar plan over the Arrakis Prospect within the Caladan target area, overlying a
ground gravity image (BA267 1VD linear colour scale, with northeast shade). All Yandal drilling is
plotted (historic drilling has been excluded). Collars are thematically coloured by max Au (g/t) in
the hole. Dashed yellow polygons represent air-core regolith anomalies (Results include ~4m @ 0.1
g/t Au or greater, with the upper profile or the bottom-of-hole sample is 0.1g/t Au or greater).
Caladan
Fold
Arrakis Air-core
Trend
25IWBRC0041D
37m @ 0.6 g/t Au incl.
6.5m @ 1.5g/t Au
25IWBRC0042
50m @ 1.3 g/t Au
incl. 28m @ 1.9g/t Au
25IWDD0011
17.7m @ 1.4g/t Au
incl. 7.95m @ 2.5g/t Au
25IWBRC0043
16m @ 1.1 g/t Au
1000m
25IWBRC0056
18m @ 1.6g/t Au from 45m
Incl. 9m @ 2.9g/t Au Incl.
3m @ 6.9g/t Au
1.2km Surface
Projection of
Arrakis Structure
Parallel Air-core
Trend
25IWBAC096
9m @ 1.2 g/t Au
OWRB33 (hist.)
8m @ 0.4 g/t Au
25IWBRC0040D
56.50m @ 1.3 g/t Au incl.
14.75m @ 3.3 g/t Au OWRB34 (hist.)
28m @ 0.2 g/t Au
26IWBRC0067
12m @ 2.3g/t Au
Incl. 6m @ 3.7g/t Au
26IWBRC0065
27m @ 1.2g/t Au
Incl. 2m @ 5.1g/t Au &
5m @ 2.7g/t Au
Gravity
1VD Lin
yandalresources.com.au | ASX:YRL 6
Figure 3: A longitudinal section displaying intercept midpoints within the main Arrakis mineralised structure (intercepts from subordinate structures are
excluded). Grade accumulation (length multiplied by Au grade) is based on down-hole length, with no true width correction applied. This longitudinal section
has been prepared to show the distribution of recent intercepts across the interpreted Arrakis trend. Grade contours and high-grade plunge interpretations
have not been applied due to the early stage of exploration across the late 2025 gold discovery.
Scale
250m
NORTHWEST
Surface
Arrakis
Longitudinal Section
southwest facing
SOUTHEAST
Primary Arrakis Structure >1.2km
26IWBRC0065
27m @ 1.2g/t Au
Incl. 2m @ 5.1g/t Au
& 5m @ 2.7g/t Au
26IWBRC0067
12m @ 2.3g/t Au
Incl. 6m @ 3.7g/t Au
Interpreted Offsetting
Fault Zone
26IWBRC0073
Assays Pending
26IWBRC0069
Assays Pending
25IWBRC0050D
Assays Pending
26IWBRC0068D
Assays Pending
26IWBRC0066D
Assays Pending
Long-section Only Plots
Confirmed Intercepts Within the
Primary Arrakis Structure
yandalresources.com.au | ASX:YRL 7
Arrakis Diamond Drilling
In addition to RC drilling, two diamond holes have been completed on the 6,550mN and 6,350mN
lines to test and assess the continuity of high-grade mineralisation at depth, between vertical
depths of 250m and 350m (see Figures 2 and 3). 26IWBRC0066D was completed below the
previous diamond hole 25IWBDD0012 on the 6,550mN line, and 26IWBRC0068D was completed
below RC hole 25IWBRC0053. A diamond tail has been completed on 25IWBRC0050D (targeting
an intercept on the 6,100mN line), which failed to reach its target depth during the last RC
program of 2025. All three diamond holes have successfully intercepted the Arrakis structure, and
assay results are anticipated in 4-6 weeks’ time.
Arrakis Offset to the Southeast
The recently completed and ongoing extensional RC drilling combined with litho-structural
interpretations using both magnetic and gravity geophysical datasets indicate the potential for
a broad 100-200m wide, approximately north-south striking shear zone to cross-cut and
potentially offset the Arrakis structure to the north (see Figure 4 below). The interpreted offset
Arrakis target is coincident with a historic regolith Au anomaly (see Figure 2) and a parallel As
anomaly. Extension RC drilling is now re-focused on targeting this potential offset of the Arrakis
mineralisation.
Figure 4: Schematic plan demonstrating how the north-south striking shear zone may
disrupt and displace Arrakis mineralisation, and showing where extensional RC drilling will
be re-focused to account for this potential offset.
Arrakis Prospect
Plan View
Schematic Diagram
400m
Revised Extensional
RC drilling Focus
Area
ApparentStrike-
slip Offset
Arrakis
Conceptual
Target
Arrakis
Surface
Projection
yandalresources.com.au | ASX:YRL 8
Arrakis Geology & Mineralisation Overview
The Arrakis Prospect is located at the centre of the Ironstone Well-Barwidgee Gold Project, within
the Yandal Greenstone Belt of Western Australia. The prospect is defined by a >2.2km mineralised
trend defined by air-core drilling. The prospect lies beneath 4-20m of transported cover. The
depth of weathering varies along strike, with the base of fresh rock typically between 80-120m
below the surface. To date, primary fresh rock mineralisation has been defined over more than
1.2km of strike, with true widths ranging from 10m to >30m.
Arrakis mineralisation is hosted within a deformed porphyritic dacite intrusive that varies in
thickness both along strike and down dip. The intrusive appears to be broadly intruding parallel
to stratigraphy (strataform). Steep north-east dipping mineralisation hosted within the intrusive is
bracketed by a sequence of pillow basalts to the east and a dolerite unit to the west.
A compilation of RC and diamond drilling results and geological observations demonstrates two
separate styles of mineralisation at Arrakis:
• A broad lower-grade style of mineralisation hosted within a silica-sericite altered dacite
porphyritic intrusive unit that has been weakly to moderately fractured. The chlorite-
biotite-filled fractures also contain pyrite and minor arsenopyrite. Fine pyrite and
arsenopyrite are also disseminated throughout the altered intrusive host. This style of
mineralisation is often associated with wider zones of the host intrusive.
• A second style of higher-grade mineralisation is associated with a more intense level of
brittle-ductile deformation and strong silica-pyrite-arsenopyrite alteration of the dacitic
porphyry, often presenting as a clast-supported breccia, and that is pervasively silica-
altered. This style of mineralisation can also be sheared and intercalated (mixed) with
the bounding basalts and dolerites. This style of higher-grade gold mineralisation
typically occurs on the hanging-wall or eastern margin of the mineralised structure.
Structural observations from diamond drilling indicate strong strike-slip, sinistral shearing. Mineral
lineations broadly plunge shallowly to the northwest. Two dominant ductile shear fabrics have
been observed: a subparallel fabric and a shallower-dipping, northwest-striking fabric. The latter
often exhibits as a mylonite and may offset or structurally control mineralisation.
The position of the dacitic intrusion and the thickness of the higher-grade mineralisation are likely
to be structurally controlled.
yandalresources.com.au | ASX:YRL 9
Next Steps and Looking Ahead
Results from a further six RC holes, along with results from the ongoing extensional RC drilling
program, are anticipated over the coming weeks. This will be followed by targeted RC drilling
designed to refine geological models across the late 2025 gold discovery of Arrakis.
Results from the three diamond holes completed are anticipated in in 4 to six weeks’ time.
An infill ground gravity survey will also shortly commence (in early May) across the Arrakis
discovery and broader Caladan target area to aid in refining the litho-structural interpretation
and adjacent discovery opportunities.
The active exploration program across the IWB Gold Project is proceeding well, and the
Company maintains a strong cash position heading into the busy exploration schedule for 2026.
The notable near-term activities and news flow from the planned circa 10km RC; 5km DD,
and 15km AC drilling programs (see Table 1 below for schedule) include;
Arrakis Discovery
• Further RC drilling results targeting the southeast extension of the Arrakis structure
are expected in early May;
• This will be followed by targeted RC drilling to define the scale and geometry of
higher-grade mineralisation across the recent gold discovery;
• Results from diamond drilling designed to assess the depth continuity and width
of higher-grade mineralisation at depth are expected in 4 to 6 weeks time;
Flushing Meadows (MRE 268koz @ 1.1g/t Au, see Table 1)
• RC drilling of pre-collars is underway ahead of an eight-hole diamond drilling
program below the shallow 1.9km striking deposit that will commence soon;
• Air-core drilling will be extended over the broader Flushing Meadows and
parallel Giedi Prime target area during May and June.
New England Granite Target Area
• Drilling of the high-grade target (6m @ 6.3g/t Au from 36m, including 2m @
18.2g/t from 36m) identified at the Salusa prospect will recommence in the
coming weeks as ground conditions improve following recent rainfall;
• Further air-core drilling across the western side of the New England Granite
target area will commence once final heritage clearance is received.
Other Exploration
• First lab results from the Nayla target area EIS diamond drilling program are
anticipated in 4-6 weeks.
yandalresources.com.au | ASX:YRL 10
Summary Table 1: Proposed indicative exploration schedule for the six-month period to
September 2026.
Authorised by the board of Yandal Resources
Chris Oorschot
Managing Director
Yandal Resources Limited
yandal@yandalresources.com.au
Lucas Robinson
Corporate Storytime
+61 408 228 889
lucas@corporatestorytime.com
yandalresources.com.au | ASX:YRL 11
About Yandal Resources Limited
Yandal Resources has a portfolio of advanced gold exploration projects in the highly prospective Yandal
and Norseman-Wiluna Greenstone Belts of Western Australia.
Ironstone Well-Barwidgee Gold Project
The 100% owned Ironstone Well-Barwidgee (IWB) Gold Project covers approximately 370km² of highly
prospective and under-explored tenure located between the Jundee and Bronzewing mines in the
northern Yandal Greenstone Belt. Yandal has an established Resource of 268,000oz of gold at Flushing
Meadows (within IBW) and considers there to be strong potential to make new discoveries and expand
this resource base within its extensive tenure holding. (Refer to the ASX announcement of 4 November
2020 for details of the Flushing Meadows Resource).
The IWB project area also includes two new gold discoveries, the Arrakis and Siona Prospects, both made
within the last twelve months. These outcomes were driven by the execution of a targeted exploration
program that followed a systematic, geologically driven strategy that was developed in early 2023. The
Arrakis prospect is hosted within the Caladan fold, and the Siona prospect is hosted within the New
England Granite.
Both discoveries are currently at an early stage but progressing well, with future activities focused on
delineating the scale of each of the newly defined mineralised systems.
The IWB Gold Project also includes several advanced prospects, where limited historic and YRL drilling has
returned robust gold intercepts, indicating the potential for shallow oxide mineralisation. Both the early-
stage and more advanced prospects are the focus of ongoing exploration.
Mt McClure
The Mt McClure Gold Project, acquired in August 2022, is located ~15km southwest of the historic
Bronzewing Mine and includes three mining leases with JORC 2012 Resources totalling 81,675oz Au.
The project has prospectivity for new shallow gold deposits adjacent to current Resources and in the
footwall and hanging wall of the stratigraphy. Ground gravity survey data from the prior Quarter support
ongoing structural/stratigraphic interpretations for 2026 targeting.
yandalresources.com.au | ASX:YRL 12
Figure 5: Yandal Resource exploration Project locations within the Yandal
Greenstone Belt. The Arrakis Prospect is located within the Caladan target area.
King of the Hills
Thunder Box
Darlot
Bellevue
Kathleen Valley
Mt Keith
Wiluna
Jundee
Bronzewing
Wiluna
Leinster
New England Granite
Siona Discovery
Flushing Meadows
Deposit 268koz
Caladan Target area
Arrakis Discovery
0 100km
Ironstone Well-
Barwidgee Gold Project
Mt McClure Gold
Project 182koz
Dingo Range Project
yandalresources.com.au | ASX:YRL 13
Figure 6: Yandal Resource exploration target areas and prospect locations within the northern
Yandal Greenstone Belt. The Arrakis Prospect is located within the Caladan target area.
5km
Salusa
Caladan
Target Area
Siona
Flushing Meadows
(268Koz)
New England
Granite
Nayla Target
Area
Geidi Prime
Target Area
5km
Radius
Arrakis
Discovery
Irulan Dolerite
Complex
yandalresources.com.au | ASX:YRL 14
Table 2 – Yandal Resources Ltd - Mineral Resource Summary
Deposit
Indicated Inferred Total
Tonnes
(‘000s)
Grade
(g/t)
Au
(oz)
Tonnes
(‘000)
Grade
(g/t)
Au
(oz)
Tonnes
(000’s)
Grade
(g/t)
Au
(Oz)
Ironstone Well
Flushing Meadows1 2,141 1.3 91,000 5,245 1.1 177,000 7,386 1.1 268,000
Mt McClure
Challenger2 718 1.9 44,000 718 1.9 44,000
Success3 1,255 1.9 75,000 1,255 1.9 75,000
Parmelia4 252 2.1 17,000 252 2.1 17,000
HMS Sulphur5 1010 1.2 39,000 1010 1.2 39,000
Gilmore6 134 1.7 7,200 134 1.7 7,200
Sub-total - MMC 3,369 1.7 182,200 3,369 1.7 182,200
Grand-total7 2,141 1.3 91,000 8,614 1.3 359,200 10,755 1.3 450,200
Due to the effects of rounding, totals may not represent the sum of the individual components.
1. Reported above 0.5g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 4 November 2020 for full
details. 2. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 22 August 2022 for
full details 3. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 6 September
2022 for full details. 4. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 20
September 2022 for full details. 5. Reported above 0.5g/t Au lower cut-off grade within this announcement 6. Reported above 1.0g/t
Au lower cut-off grade within this announcement. 7. All Resources are reported as global estimates, not constrained by optimised pit
shells.
Competent Person Statement
The information in this document related to Exploration Targets and Exploration Results, geology and data
compilation is based on information reviewed or compiled by Mr Christopher Oorschot, a Competent
Person who is a Member of The Australasian Institute of Geoscientists. Mr Oorschot is the Managing Director
of the Company, is a full-time employee and holds shares and options in the Company. Mr Oorschot has
sufficient experience, which is relevant to the style of mineralisation and type of deposit under
consideration, and to the activity which he is undertaking to qualify as a Competent Person as defined in
the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr Oorschot consents to the inclusion in this announcement of the matters based on this
information in the form and context in which it appears.
The information in this announcement that relates to the Flushing Meadows and Mt McClure Mineral
Resource Estimates is based on information compiled and generated by Andrew Bewsher, an employee
of BM Geological Services Pty Ltd (“BMGS”). Both Andrew Bewsher and BMGS hold shares in the company.
BMGS consents to the inclusion, form and context of the relevant information herein as derived from the
original resource reports. Mr Bewsher has sufficient experience relevant to the style of mineralisation and
type of deposit under consideration and to the activity which is being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the JORC ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’.
YRL confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
yandalresources.com.au | ASX:YRL 15
Forward Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include, but
are not limited to, statements concerning Yandal Resources Limited’s (Yandal’s) current expectations,
estimates and projections about the industry in which Yandal operates, and beliefs and assumptions
regarding Yandal’s future performance. When used in this document, words such as “anticipate”, “could”,
“plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are
forward-looking statements. Although Yandal believes that its expectations reflected in these forward-
looking statements are reasonable, such statements are subject to known and unknown risks, uncertainties
and other factors, some of which are beyond the control of Yandal, and no assurance can be given that
actual results will be consistent with these forward-looking statements. Drilling results presented indicate
geological potential for mineralisation, but there can be no certainty that these results will eventually form
part of a Mineral Resource Estimate.
Table 3 – Arrakis RC drilling program collar location summary. Please note that collars have not yet
been formally surveyed; the coordinates below are derived from a handheld GPS and are
accurate to within +/- 5m.
Hole ID
Hole
type
East
(m)
North
(m)
RL
(mAHD)
Azimuth
(degrees)
Dip
(degrees)
Total
Depth
(m)
26IWBRC0065 RC 287550 7027069 524.0 225 -60 170
26IWBRC0067 RC 287582 7027099 524.0 225 -60 227
26IWBRC0069 RC 287626 7027119 524.0 225 -60 261
26IWBRC0071 RC 287632 7027018 525.0 225 -60 157
26IWBRC0073 RC 287729 7027111 525.0 225 -60 287
26IWBRC0075 RC 287681 7026911 524.0 225 -60 177
26IWBRC0077 RC 287737 7026971 524.0 225 -60 207
26IWBRC0079 RC 287794 7027030 523.6 225 -60 207
Table 4 – Arrakis diamond drilling program collar location summary. Please note that collars have
not yet been formally surveyed; the coordinates below are derived from a handheld GPS and are
accurate to within +/- 5m.
Hole ID
Hole
type
East
(m)
North
(m)
RL
(mAHD)
Azimuth
(degrees)
Dip
(degrees)
Pre-collar
Depth
(m)
Total
Depth
(m)
25IWBRC0050D RCD 287365 7027022 523.4 61.3 -57.1 262 381.3
26IWBRC0066D RCD 287256 7027489 522.8 226.9 -60.5 179 440.5
26IWBRC0068D RCD 287362 7027310 522.6 224.7 -60.6 103 364.2
yandalresources.com.au | ASX:YRL 16
Table 5 – Arrakis Prospect - Summary of significant RC assay results >0.3g/t Au with no more than 4m of
continuous internal waste included unless otherwise stated. All intercept lengths are reported as down-
hole lengths.
Hole
ID
Sample
type / Sub
Interval
From
(m)
To
(m)
Interval
(m)
Au
(g/t)
Comment
26IWBRC0065 1m RC 39 42 3 2.0 Completely weathered
26IWBRC0065 including 39 40 1 4.1 Completely weathered
26IWBRC0065 1m RC 87 114 27 1.2 Mod. weathered, includes 5m of internal waste
26IWBRC0065 Including 89 91 2 5.2 Moderately weathered
26IWBRC0065 Including 100 105 5 2.7 Moderately weathered
26IWBRC0067 1m RC 152 164 12 2.3 Fresh rock
26IWBRC0067 Including 152 158 6 3.7 Fresh rock
yandalresources.com.au | ASX:YRL 17
Relevant Previous ASX Announcements
• 2026 Exploration Commences Across the IWB Gold Project, 23 March 2026
• Arrakis RC Results Show High-Grade Mineralisation Potential, 15 January 2026
• Arrakis Diamond Drilling Delivers Strong Results, 8 December 2025
• First Arrakis Diamond Results & RC Drilling Underway, 24 November 2025
• Final Arrakis RC Results with Diamond Drilling to Commence, 13 October 2025
• Arrakis Gold Discovery Extended by 400m, 24 September 2025
• Arrakis Gold Discovery Confirmed With 54m @ 1.2g/t Au, 22 September 2025
• Arrakis RC Drilling Complete & All AC Results Now Received, 17 September 2025
• RC Drilling Commences Across Arrakis, 1 September 2025
• Arrakis Extended to Over 2.2km in Strike, 18 August 2025
• Caladan AC Results Further Extend Arrakis Mineralisation, 31 July 2025
• Caladan AC Shows Early Signs of Scale, 10 July 2025
• Caladan Air-Core Drilling Program Commences, 5 June 2025`
• RIU Sydney Presentation, 7 May 2025
• Arrakis RC Drilling Results, 30 April 2025
• Ironstone Well-Barwidgee Exploration Update, 25 February 2025
• Caladan Air-Core Drilling Demonstrates Discovery Potential, 15 January 2025
• Air-core Drilling Commences Across Caladan and Irulan, 10 October 2024
• Oblique Diamond Drilling Results, 3 September 2024
• IWB Soil Results and NEG Diamond Drilling Complete, 12 August 2024
• Large-scale Gold Anomalies Across Emerging Targets, 15 July 2024
• Gold Coast Investment Showcase Presentation, 20 June 2024
• Exploration Update – IWB Ground Gravity Survey, 11 June 2024
ASX Announcement 28 April 2026 Page 18
Appendix 1 – Ironstone Well-Barwidgee Gold Project, Arrakis RC and Diamond Drilling
JORC Code (2012) Table 1, Sections 1 and 2
Mr Christopher Oorschot, Managing Director of Yandal Resources, compiled the information in Section 1 and Section 2 of the following JORC Table 1 and
is the Competent Person for those sections. The following Table and Sections are provided to ensure compliance with the JORC Code (2012 edition)
requirements for the reporting of Exploration Results.
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
• Yandal Resources has completed RC drilling across both 100m and 200m spaced lines
covering the Arrakis Prospect, where mineralisation is associated with a >2.2km air-core trend.
The drilling involved a 139mm face sampling bit down to between 140m and 286m. Holes were
drilled at an angle of -60 ° to the southwest or northeast.
• Yandal Resources (YRL) RC drilling samples were collected via a rig-mounted static cone
splitter, splitting approximately 12.5% of the total sample volume. Two splits are collected for
each metre: a primary an