8 October 2024
Exploration Update
High-Grade Mineralisation Confirmed in Quarter Moon Diamond Drilling
•
Initial diamond drilling results from the three diamond holes completed across the
Quarter Moon Prospect have been received.
•
Results confirm multiple sub-parallel high-grade mineralised structures; significant
intercepts include:
o
2.8m @ 5.9g/t Au from 105m in 24IWBRD0029,
o
2.9m @ 2.1g/t Au from 144.0m in 24IWBRD0033,
•
Including 0.5m @ 9.5g/t Au from 146.4m
o
1.0m @ 6.4g/t Au from 169.0m in 24IWBRD0033,
o
0.6m @ 4.4g/t Au from 130.0m in 24IWBRD0029,
o
0.6m @ 3.8g/t Au from 139.0m in 24IWBRD0029,
These diamond drilling results build on RC results previously released in July,
including:
o
6.0m @ 4.2 g/t Au from 90.0m in 24IWBRC0032,
o
o
including 1m @ 13.1g/t Au from 147.0m
2.0m @ 6.3/t Au from 99.0m in 24IWBRC0028,
o
including 1m @ 21.2g/t Au from 94.0m,
6.0m @ 3.2/t Au from 143.0m in 24IWBRC0032,
including 1m @ 12.1g/t Au from 147.0m
5.0m @ 2.5g/t Au from 43.0m in 24IWBRC0032,
•
Including 0.7m @ 18.1g/t Au from 105.8m
Including 1m @ 7.8g/t Au from 43.0m.
Results combined with structural geological observations suggest up to nine highgrade parallel structures occurring along 800m of strike within the host
dolerite/mafic sequence, many of which remain open along strike.
For further information or to ask questions concerning this announcement, please visit our
Investor Hub at https://investorhub.yandalresources.com.au/link/7eX8ze
Contact Us
A: Level 1 Unit 5/62 Ord Street,
West Perth WA 6005
T: +61 (0)8 9389 9021
E: yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL
Board and Management
Chris Oorschot
Managing Director/CEO
Greg Evans
Non-Exec Chair
Katina Law
Non-Exec Director
Tim Kennedy
Non-Exec Director
Greg Fitzgerald
Company Secretary
Next Steps
•
A detailed review of the interpreted high-grade structures relative to the Quarter
Moon dolerite host is underway to determine potential targets for the next round
of drilling.
•
The first phase of AC drilling across the large-scale Caladan and Irulan target
areas is set to commence this week.
•
The 2,500m RC drilling across the New England Granite Prospect is complete;
results are expected in 4-6 weeks.
Commenting on the diamond drilling results, Yandal Resources’ Managing Director, Mr
Chris Oorschot, said: “Verifying high-grade mineralised structures at depth across Quarter
Moon is a great outcome. Furthermore, confirming the geometry of the high-grade
mineralised structures will enable the team to target future drilling with higher confidence.
The team will now review the position of these mineralised structures relative to the dolerite
host to develop potential targets for the next round of drilling. It should be noted that
dolerite is an important host rock at the Jundee deposit further north in the Yandal belt.
In addition to this, we have now completed the New England Granite RC drilling program
on schedule and are looking forward to the results, which we expect to release in 4-6
weeks.”
Yandal Resources Ltd (ASX: YRL, “Yandal Resources” or the “Company”) is pleased to advise
that assay results from the diamond drilling program across the Quarter Moon Prospect
(E53/1882) have been received. The Quarter Moon Prospect is part of the Ironstone WellBarwidgee (IWB) Gold Project within the Yandal Greenstone Belt. The Prospect is located 55km
south of the Jundee Mining Centre, currently operated by Northern Star Resources (ASX: NST),
see Figure 1.
Three diamond tails were completed across the Quarter Moon Prospect following RC drilling in
June. The Quarter Moon Prospect hosts narrow but high-grade mineralisation hosted within a
dolerite unit (see Figure 2). The three completed diamond tails were designed to confirm the
geometry of high-grade mineralisation within fresh rock.
Results from the diamond drilling demonstrate that high-grade mineralisation across Quarter
Moon is hosted within narrow, regularly spaced shear zones, with shears often hosting narrow
laminated veining in the core. Closer-spaced RC drilling completed in May suggested the highgrade mineralisation was cross-cutting at an oblique angle relative to stratigraphy and that
multiple parallel high-grade structures were likely present. Structural observations from the
diamond core have confirmed this interpretation. Current modelling suggests there are up to
nine parallel, narrow, high-grade structures present along 800m of strike. Critically, mineralisation
is open both along strike and at depth.
yandalresources.com.au | ASX:YRL
2
Quarter Moon Diamond Drilling Results
The diamond drilling aimed to confirm the geometry of high-grade mineralisation in fresh rock,
following several significant results from an RC program earlier in the year (See ASX
announcement dated 3 July 2024) that included:
o
6.0m @ 4.2 g/t Au from 90.0m in 24IWBRC0032,
o
6.0m @ 3.2/t Au from 143.0m in 24IWBRC0032,
o
including 1m @ 13.1g/t Au from 147.0m
2.0m @ 6.3/t Au from 99.0m in 24IWBRC0028,
o
including 1m @ 21.2g/t Au from 94.0m,
including 1m @ 12.1g/t Au from 147.0m
5.0m @ 2.5g/t Au from 43.0m in 24IWBRC0032,
Including 1m @ 7.8g/t Au from 43.0m.
Initial results have been received for the three-hole, 650m diamond drilling program at the
Quarter Moon Prospect (see Figures 1 and 2 and Tables 2 & 3). Results confirm narrow highgrade mineralised structures, with better intercepts including:
o
2.8m @ 5.9g/t Au from 105m in 24IWBRD0029,
o
Including 0.7m @ 18.1g/t Au from 105.8m (see Figures 3 & 5)
2.9m @ 2.1g/t Au from 144.0m in 24IWBRD0033,
Including 0.5m @ 9.5g/t Au from 146.4m (See Figures 4 & 6)
o
1.0m @ 6.4g/t Au from 169.0m in 24IWBRD0033,
o
0.6m @ 4.4g/t Au from 130.0m in 24IWBRD0029,
o
0.6m @ 3.8g/t Au from 139.0m in 24IWBRD0029,
Results and geological observations from the diamond drilling confirm earlier interpretations
from earlier RC drilling that high-grade mineralisation is hosted within narrow, northwest-striking,
and steeply northeast-dipping shear zones. These shears demonstrate intense localised silicasericite-pyrite alteration around a 0.1-0.2m wide laminated vein (see Figures 5 and 6).
Updated interpretations suggest that eight or nine parallel mineralised structures that host highgrade mineralisation are present along 800m of strike. Many remain open both along strike and
at depth.
Given the frequency and geometry of these structures, past drilling was not optimally aligned
to test the true width or strike continuity of mineralisation. Any future drilling programs will
account for the revised geometry of mineralisation accordingly.
yandalresources.com.au | ASX:YRL
3
Giedi Prime
Target
Corrino
Target
Caladan
Fold
Oblique
Quarter
Moon
Flushing
Meadows
Irulan Dolerite
Complex
New England
Granite
Figure 1: A simplified geology plan across the IWB Gold Project shows active prospects and
exploration target areas.
yandalresources.com.au | ASX:YRL
4
Figure 2: A Collar plan for the Quarter Moon Prospect displays all drilling collars, colour-coded
by max Au in hole (g/t Au), overlying an aerial magnetic image (RTP 1VD non-linear). Diamond
pre-collars and cross-section positions are labelled. The surface projection of the interpreted
high-grade structures is also plotted.
yandalresources.com.au | ASX:YRL
5
SW
NE
Surface
2.8m @ 5.9g/t Au
Incl. 0.7m @ 18.1g/t Au
6m @ 0.6 g/t Au
0.6m @ 4.4g/t Au
2m @ 6.3 g/t Au
Incl. 1m @ 12.1g/t Au
0.6m @ 3.8g/t Au
9m @ 2.5 g/t Au
Incl. 3m @ 5.6g/t Au
Dolerite
Figure 3: Quarter Moon cross section showing diamond hole 24IWBRD0029 results and
interpretation of mineralisation. See Figure 2 for section location.
yandalresources.com.au | ASX:YRL
6
SW
NE
Surface
8m @ 1.7 g/t Au
Incl. 2m @ 5.0 g/t Au
TOFR
2.9m @ 2.1g/t Au
Incl. 0.5m @ 9.5g/t Au
3m @ 1.0 g/t Au
6m @ 4.2 g/t Au
Incl. 1m @ 21.2 g/t Au
1.0m @ 6.4g/t Au
Dolerite
6m @ 3.2 g/t Au
Incl. 1m @ 13.1 g/t Au
Figure 4: Quarter Moon cross section showing diamond hole 24IWBRD0033 results and
interpretation of mineralisation. See Figure 2 for section location.
yandalresources.com.au | ASX:YRL
7
Figure 5: Photo of HQ2 core from 24IWBRD0029 showing intercept of 2.8m @ 5.9g/t Au from 105m
including 0.7m @ 18.1g/t Au. Sample values are annotated on the core as g/t Au, and dashed lines
represent sample boundaries.
24IWBRD0033 145.3m to 147.9m NQ Core
0.4
0.5
0.1
9.5
Figure 6: Photo of NQ core from 24IWBRD0033 showing intercept of 2.9m @ 2.1g/t Au from 144.0m
including 0.5m @ 9.5g/t Au. Sample values are annotated on the core as g/t Au, and dashed lines
represent sample boundaries.
yandalresources.com.au | ASX:YRL
8
Looking Ahead
The Company remains well positioned to maintain a high level of exploration throughout 2024
with priority exploration activities and forthcoming news, including;
1.
The first phase of AC drilling across the Caladan and Irulan target area is set to
commence next week,
2.
Results from the New England Granite RC drilling program are expected in the next 4 to
6 weeks,
3.
Results from the second phase of soil sampling covering the broader Caladan target
area are expected in 6-8 weeks.
4.
Field reconnaissance of soil anomalies across the Ironstone Well-Barwidgee Gold
Project is ongoing (See ASX announcement dated 12 August 2024); this includes
mapping and rock chip sampling.
Authorised by the board of Yandal Resources
For further information, please contact:
Chris Oorschot
Managing Director
Yandal Resources Limited
yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL
Greg Fitzgerald
Company Secretary
+61 8 9389 9021
yandal@yandalresources.com.au
9
Relevant Previous ASX Announcements
o
IWB Soil Results & NEG Diamond Drilling Complete, 12 August 2024
o
Quarter Moon RC Drilling Results, 3 July 2024
o
Gold Coast Investment Showcase Presentation, 20 June 2024
o
Drilling at Oblique Confirms Large Scale Potential, 25 October 2023
o
Heritage Clearance Received for Drill Testing of Key Prospects at Ironstone
Well-Barwidgee, 24 July 2023
o
Presentation at RIU Sydney Resources Round-up Conference, 9 May 2023
o
Replacement Prospectus, 12 December 2018 Replacement Prospectus, 12
December 2018
yandalresources.com.au | ASX:YRL
10
About Yandal Resources Limited
Yandal Resources has a portfolio of advanced gold exploration projects in the highly prospective Yandal
and Norseman-Wiluna Greenstone Belts of Western Australia.
Yandal Resources’ gold project locations.
Table 1 – Yandal Resources Ltd - Mineral Resource Summary
Indicated
Inferred
Deposit
Tonnes Grade
Au
Tonnes
Grade
Au
(‘000s)
(g/t)
(oz)
(‘000)
(g/t)
(oz)
Ironstone Well
Flushing Meadows1
2,141
1.3
91,000
5,245
1.1
177,000
Mt McClure
Challenger2
718
1.9
44,000
3
Success
1,255
1.9
75,000
Parmelia4
252
2.1
17,000
5
HMS Sulphur
1010
1.2
39,000
Gilmore6
134
1.7
7,200
Sub-total - MMC
3,369
1.7
182,200
Gordons
Gordons Dam7
365
1.7
20,000
8
2,141
Grand-total
1.3
91,000
8,979
1.3
379,200
Total
Tonnes
(000’s)
Grade
(g/t)
Au
(Oz)
7,386
1.1
268,000
718
1.9
44,000
1,255
1.9
75,000
252
2.1
17,000
1010
1.2
39,000
134
1.7
7,200
3,369
1.7
182,200
365
1.7
20,000
11,120
1.4
470,200
Due to the effects of rounding, totals may not represent the sum of the individual components.
1.
Reported above 0.5g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 4 November 2020 for full
details. 2. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 22 August 2022
for full details 3. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 6
September 2022 for full details.4. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement
dated 20 September 2022 for full details 5. Reported above 0.5g/t Au lower cut-off grade within this announcement 6. Reported
above 1.0g/t Au lower cut-off grade within this announcement 7. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal
Resources Ltd ASX announcement dated 6 April 2023 for full details 8. All Resources are reported as global estimates, not constrained
by optimised pit shells.
yandalresources.com.au | ASX:YRL
11
Competent Person Statement
The information in this document related to Exploration Targets and Exploration Results, geology and data
compilation is based on information reviewed or compiled by Mr Christopher Oorschot, a Competent
Person who is a Member of The Australasian Institute Geoscientists. Mr Oorschot is the Managing Director
of the Company, is a full-time employee and holds shares and options in the Company. Mr Oorschot has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Oorschot consents to the inclusion in this announcement of the matters based on this information in the
form and context in which it appears.
The information in this announcement that relates to the Flushing Meadows, Mt McClure and Gordons Dam
Mineral Resource Estimates is based on information compiled and generated by Andrew Bewsher, an
employee of BM Geological Services Pty Ltd (“BMGS”). Both Andrew Bewsher and BMGS hold shares in
the Company. BMGS consents to the inclusion, form and context of the relevant information herein as
derived from the original resource reports. Mr Bewsher has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration and to the activity which is being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the JORC ‘Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves’.
YRL confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
Forward Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include, but
are not limited to, statements concerning Yandal Resources Limited’s (Yandal’s) current expectations,
estimates and projections about the industry in which Yandal operates, and beliefs and assumptions
regarding Yandal’s future performance. When used in this document, words such as “anticipate”, “could”,
“plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are
forward-looking statements. Although Yandal believes that its expectations reflected in these forwardlooking statements are reasonable, such statements are subject to known and unknown risks, uncertainties
and other factors, some of which are beyond the control of Yandal and no assurance can be given that
actual results will be consistent with these forward-looking statements. Drilling results presented indicate
geological potential for mineralisation, but there can be no certainty that these results will eventually form
part of a Mineral Resource Estimation.
yandalresources.com.au | ASX:YRL
12
Table 2: Summary of 2024 diamond drilling across the Quarter Moon Prospect.
Hole ID
Hole
Type
Dip
(degrees)
Azimuth
(degrees)
Pre-collar
Depth
(m)
Total
Depth
(m)
East
(m)
North
(m)
RL
(m
AHD)
24IWBRD0023
RCD
-62.3
246.2
102
314.70
275458.2
7031760.1
547.1
24IWBRD0029
RCD
-60.8
249.4
102
300.50
275793.7
7031079.8
551.3
24IWBRD0033
RCD
-60.5
249.4
102
330.00
275652.4
7031404.3
547.4
Table 3: Quarter Moon - Summary of significant diamond drilling assay results, using a 0.3g/t Au lower
cut-off, a final length weighted composite value >0.3g/t Au and with no more than 2m of continuous
internal waste included unless otherwise stated.
Hole
ID
Sample
type
From
(m)
To
(m)
Interval
(m)
Au
(g/t)
Comment
24IWBRD0023
24IWBRD0029
24IWBRD0029
24IWBRD0029
24IWBRD0029
24IWBRD0029
24IWBRD0033
24IWBRD0033
24IWBRD0033
24IWBRD0033
24IWBRD0033
24IWBRD0033
24IWBRD0033
24IWBRD0033
24IWBRD0033
24IWBRD0033
24IWBRD0033
HQ2 Core
HQ2 Core
Including
HQ2 Core
HQ2 Core
NQ Core
HQ2 Core
NQ Core
Including
NQ Core
NQ Core
NQ Core
NQ Core
NQ Core
NQ Core
NQ Core
NQ Core
220.2
105
105.8
127.1
130
139
133
144
146.36
150.75
169
178
180
211.4
216.1
233
310.8
222.4
107.8
106.5
127.6
130.6
139.6
133.9
146.9
146.9
151.8
170
178.35
181
211.6
216.35
234
311.3
2.2
2.8
0.7
0.5
0.6
0.6
0.9
2.9
0.54
1.05
1
0.35
1
0.2
0.25
1
0.5
0.5
5.9
18.1
1.8
4.4
3.8
2.5
2.1
9.5
1.4
6.4
0.6
1.3
2.5
2.3
1.5
1.4
Fresh
Transitional
Transitional
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
yandalresources.com.au | ASX:YRL
13
yandalresources.com.au | ASX:YRL
14
Appendix 1 – Ironstone Well-Barwidgee Gold Project, YRL 2024 Diamond Drilling, Quarter Moon Prospect
JORC Code (2012) Table 1, Sections 1 and 2
Mr. Christopher Oorschot, CEO and Managing Director of Yandal Resources, compiled the information in Section 1 and Section 2 of the following JORC
Tables and is the Competent Person for those sections. The following Table and Sections are provided to ensure compliance with the JORC Code (2012
edition) requirements for reporting Exploration Results.
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
•
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
•
•
•
•
•
Aspects of the determination of mineralisation that are
Material to the Public Report. In cases where ‘industry
standard’ work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was used to obtain
1 m samples from which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other cases more
ASX Announcement 8 October 2024
•
Yandal Resources (YRL) diamond core samples include HQ3 (61.1mm diameter) and NQ2
(50.5mm diameter) core. The core was halved using a core saw, with the right-hand side
of the core (looking downhole) sampled.
Before sampling, the core is logged by a company geologist for lithology type, veining,
alteration, and deformation. Sample lengths vary subject to logged geological intervals
of interest, with a minimum sample length of 0.2 metres and a maximum sample length of
1.0 metres.
Sample quality is considered high.
Sample recovery of each metre drilled was measured and recorded, and high-resolution
photos of each tray before cutting were obtained. The unsampled half of the drill core is
also retained. Intervals where the core is un-oriented have been recorded.
When the core is cut for sampling, the same side of the core, relative to the bottom-ofhole orientation mark, is collected for analysis. For intervals without an orientation mark,
the core is pieced together, and foliation or common structures are used to
approximately orient the core for sampling purposes.
Structural observations have also been recorded where the diamond core is oriented,
and structures sub-parallel to the core axis recorded.
For all diamond drilling results, HQ3 core and NQ2 core was cut in half and used to obtain
0.2m to 1.0m half core samples. These samples were submitted to a laboratory, where
they were dried, weighed, and crushed. The Sample pulp was then split to produce a 50g
lead collection fire assay, which was then analysed by Inductively Coupled Plasma
Optical (Atomic) Emission Spectrometry (ICP-OES).
Page 15
Criteria
JORC Code explanation
Commentary
explanation may be required, such as where there is
coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed information.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (e.g. core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type, whether
core is oriented and if so, by what method, etc).
•
YRL diamond core was drilled using HQ3 (63.5mm core diameter) and NQ2 (50.5mm core
diameter) coring bits. For both diamond holes, diamond core drilling commenced from
the surface. Subject to ground conditions, the core was oriented using a downhole
orientation tool (Reflex ACT Mk3 NQ/HQ Core Ori kit).
Drill sample
recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.
•
For YRL, diamond drilling core recovery is measured and recorded. The length of core
recovered for each metre drilled is measured to the nearest 5cm and entered into an
Excel spreadsheet along with information relating to fracture frequency (driller breaks are
marked with a red “X”). In addition, dry and wet core photos are collected prior to the
cutting of the core and are retained on the company server.
For YRL diamond drilling, the orientation of contacts, veins and shears are regularly
measured and monitored.
No relationship or bias between sample recovery and grade within the diamond drilling
results has been observed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Logging
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
•
•
•
•
For YRL diamond drilling, a full log of all diamond cores was completed by the supervising
geologist in the field. Intervals were logged at various intervals based on changes in
lithology, deformation intensity, veining types, and alteration. Both planar and linear
structural measurements were also collected using a core orientation stand and a
kenometer. Logging data was captured in Excel spreadsheets and imported into an MX
Deposit database.
All observations are qualitative in nature.
The total length and percentage of the relevant
intersections logged.
Sub-sampling
techniques
If core, whether cut or sawn and whether quarter, half or
all core taken.
ASX Announcement 8 October 2024
•
•
The HQ3 (61.1mm diameter) and NQ2 (50.5mm diameter) cores were halved using a core
saw, and the right-hand side of the core (looking downhole) was sampled.
Diamond core samples are of high quality; the half core samples are dried at 100°C to
Page 16
Criteria
JORC Code explanation
and sample
preparation
If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected, including
for instance results for field duplicate/second-half
sampling.
Commentary
•
•
•
•
•
•
Whether sample sizes are appropriate to the grain size of
the material being sampled.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
•
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation,
etc.
•
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
•
•
•
ASX Announcement 8 October 2024
constant mass, crushed to <10mm and pulverised to nominally 85%, passing 75µm in
preparation for Au analysis.
Repeat analysis of pulp samples occurs across 5% of all submitted YRL samples.
No core duplicates were submitted for analysis; the second half of the core will be
retained for any follow up analysis.
When determining sample intervals, the core is sampled to contacts where observed so
that material from a geological interval of interest is not included within the adjacent
geological interval.
Where an interval of interest is observed, samples are collected 6m on either side of the
interval of interest.
Where narrow geological intervals of interest are observed, such as quartz veining, sample
lengths are reduced so that only the feature of interest is sampled down to a minimum
length of 0.2m.
Sample lengths and sizes are appropriate given the fine-to-medium-grained nature of the
sampled material.
For YRL diamond drilling, samples were assayed using a 50g lead collection fire assay with
ICP-OES finish for gold analysis with a 0.005 ppm detection limit by Intertek Genalysis
laboratory in Perth, Western Australia. This is considered a total digest and appropriate for
the targeted style of mineralisation.
Magnetic susceptibility measurements were taken every meter using a KT-10 V2
instrument with a sensitivity of 1x10-6 SI Units.
YRL QC field protocols include the insertion of commercially prepared certified reference
material (CRM) and blank material at a rate of approximately 1 CRM/blank for every 20
samples collected. CRMs used are un-identifiable by the lab when received. QAQC
performance is monitored upon receipt of each batch of results and re-assessed once all
samples for a program are received.
Laboratory QA/QC protocols involve inserting internal lab standards using CRMs, blanks,
repeat analysis of pulps and screen tests (the percentage of pulverised material passing
75µm mesh). Laboratory QAQC results are reported with each batch. Laboratory QAQC
performance is monitored upon receipt of each batch of results and assessed once all
samples for a program are received.
No duplicate samples were submitted for analysis. The alternate half of the core will be
retained by the Company for follow-up analysis.
Page 17
Criteria
JORC Code explanation
Verification
of sampling
and assaying
The verification of significant intersections by either
independent or alternative company personnel.
•
Significant intercepts from YRL diamond drilling are verified by YRL geologists through
the visual inspection of the residual half core, the inspection of core photos and the
review of the spatial location of mineralisation relative to previous intercepts and in the
case of high-grade gold intercepts, the inspection of the core for visible gold.
•
For all YRL data, primary sampling and logging data are entered into Excel spreadsheets
and retained on the company server located in the Perth office. The data is validated
and imported into the YRL cloud-hosted MX Deposits Database.
•
The first lab result for each sample is used for reporting the data, and no adjustments have
been made to the data other than adjusting values below the detection limit to a null
value before review.
•
For YRL data, all locations are relative to MGA94 Zone 51. The topography across the IWB
Gold Project is very flat, with only minor elevation differences between drill holes. This
difference is unlikely to impact geological interpretations materially.
For YRL diamond drilling, handheld Garmin GPS instruments were used to collect an initial
collar location for each collar or pre-collar. The recorded easting and northing locations
are accurate to within +/- 5m. A final collar survey was completed using a DGPS unit
(easting, northing, and RL are accurate to within +/- 0.1m).
A topographic surface generated from surveyed collars has been used to validate
diamond drilling RLs.
All spatial data presented is relative to UTM MGA94 Zone 51s.
YRL diamond drilling at the Quarter Moon Prospect is positioned to test narrow high-grade
structures interpreted to sticker towards the northwest, within an approximately northsouth striking dolerite host. Before completing the diamond drilling, the geometry of the
host dolerite was known, while the geometry of the high-grade structures was unknown.
The spacing of intercepts across the Prospect is approximately 100m along the strike and
20-40m on the section when considering all drilling. This spacing is sufficient to establish
the degree of grade continuity on the section but not along strike and is not considered
sufficient to establish the degree of grade continuity appropriate for the use in a Mineral
Resource Estimate.
Only significant gold intercepts have been reported, meaning all intervals >0.3 g/t Au with
a final length-weighted average grade >0.3g/t Au. These intervals have been reported
as a length-weighted composite where the intercept includes more than one sample.
Composites may include up to 2m of continuous internal waste, and the final composite
grade must exceed 0.3g/t Au.
Samples of varying lengths were used to calculate the final composite grade reported in
this release. The first assay result was used for all significant intercepts reported. All
intercepts have been reported relative to down-hole length. All intercepts are reported
The use of twinned holes.
Documentation of primary data, data entry procedures,
Share your feedback
Discover