New England Granite Diamond Drilling Results
Released
Released
Announcement PDF
ASX Announcement
24 September 2024
Exploration Update
Diamond Drilling Confirms Gold Mineralisation Hosted Within the New
England Granite Prospect
•
Initial results from two diamond holes primarily drilled to obtain structural
information at the large-scale New England Granite Prospect have intersected
significant gold mineralisation.
•
Results are highly encouraging given the early stage and large scale of the
Prospect, and demonstrate the potential for mineralisation to occur in several
different settings; significant intercepts include:
o
3.3m @ 1.1g/t Au from 345.3m in 24YRLEIS0002,
Including 0.9m @ 1.8g/t Au from 347.6m
o
2.9m @ 0.5g/t Au from 286.2m in 24YRLEIS0002,
o
3.8m @ 0.4g/t Au from 384.1m in 24YRLEIS0002,
Including 0.3m @ 1.9g/t Au from 385.5m,
o
0.5m @ 2.2g/t Au from 393.2m in 24YRLEIS0002,
o
8.0m @ 0.4g/t Au from 137.0m in 24YRLEIS0001,
o
9.5m @ 0.3g/t Au from 151.0m in 24YRLEIS0001,
•
These results demonstrate that mineralisation and broad low-level gold
anomalism occur within the New England Granite intrusive body, with higher
grades associated with narrow shear zones providing a clear targeting model
moving forward.
•
The New England Granite Prospect diamond drilling is co-sponsored under the
Western Australia State Government Exploration Incentive Scheme.
Next Steps
•
Follow-up RC drilling across the New England Granite Prospect has commenced.
•
Results for the recently completed diamond drilling at Quarter Moon are
expected in the coming weeks.
•
First pass AC drilling will commence across the Irulan and Caladan targets in
early October.
For further information or to ask questions concerning this announcement, please visit our
Investor Hub at https://investorhub.yandalresources.com.au/link/Wrv3aP
Contact Us
A: Level 1 Unit 5/62 Ord Street,
West Perth WA 6005
T: +61 (0)8 9389 9021
E: yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL
Board and Management
Chris Oorschot
Managing Director/CEO
Greg Evans
Non-Exec Chair
Katina Law
Non-Exec Director
Tim Kennedy
Executive Director
Greg Fitzgerald
Company Secretary
Commenting on the new target areas, Yandal Resources’ Managing Director, Mr. Chris Oorschot,
said: “The exploration team is very pleased with results from our two Exploration Incentive Scheme
diamond holes completed at our New England Granite Prospect. This program was designed to
confirm the potential of the New England Granite Prospect to host gold mineralisation and provide
structural data to assist in designing a broader RC program. Seeing evidence of mineralisation and
a clear structural context is an encouraging result, given the scale of the targeted intrusive host and
the extent of shallow transported cover.
Both holes have significantly improved our understanding of the source of the broad-scale regolith
anomaly across the eastern margin of the 4km long and 2km intrusive body. Going forward, our
focus will be to broadly test the anomalous margin with RC drilling targeted at interpreted crosscutting structures. We have more than 4km of anomalous intrusive margin; it is an extensive
exploration search space, so we are only just getting started across the New England Granite
Prospect.”
Yandal Resources Ltd (ASX: YRL, “Yandal Resources” or the “Company”) is pleased to advise
that assay results from the Exploration Incentive Scheme (EIS) co-sponsored diamond drilling
program across the New England Granite Prospect (NEG) (E53/1843) have been received. NEG
is part of the Ironstone Well-Barwidgee (IWB) Gold Project within the Yandal Greenstone Belt.
NEG is located 75km south of the Jundee Mining Centre and 45km north of the Bronzewing
Mining Centre, currently operated by Northern Star Resources (ASX: NST), see Figure 1. The
Company is targeting granite-associated gold at NEG, a mineralisation style that has produced
significant gold deposits elsewhere in the Yandal Belt and Northeastern Goldfields.
Two 400m deep diamond holes, 24YRLEIS0001 and 24YRLEIS0002, have been drilled, with the
program co-sponsored under the Western Australian Department of Energy, Mines, Industry
Regulation and Safety (DEMIRS) EIS. The NEG prospect presents a 4.2km long, 2km wide
granitoid, covered by 6-20m of transported cover and exhibits strong regolith gold anomalism
in historical drilling proximal to the eastern intrusive contact (see Figure 2). 24YRLEIS0001 was
designed to test the southeastern margin of the NEG intrusive adjacent to the Barwidgee Shear
Zone. 24YRLEIS0002 was designed to test the eastern margin of the NEG intrusive adjacent to
and interpreted northwest structure.
Results from the diamond drilling demonstrate that the NEG Intrusive body has the potential to
host mineralisation both around the intrusive contact and within the granitoid. This expands the
exploration search space to include structures within the NEG, not just the intrusive contact.
Structural trends observed within the diamond core enable the delineation of more discrete
targets across the Prospect that will be targeted in the current RC program.
yandalresources.com.au | ASX:YRL
2
New England Granite Diamond Drilling Results
The diamond drilling aimed to define the geometry of the intrusive contact, determine the
source of the broad regolith anomalism, and better understand geological structures interacting
with the intrusive body. The observations and data from the diamond drilling would then be
used to inform a broader-scale test across what is a relatively large exploration search space.
Initial results have been received for the two-hole, 800m diamond drilling program at the New
England Granite Prospect (see Figures 1 and 2). Results show numerous intervals of gold
anomalism hosted within the granitoid; higher-grade intervals of note within 24YRLEIS00002
include:
o
3.3m @ 1.1g/t Au from 345.3m in 24YRLEIS0002,
Including 0.9m @ 1.8g/t Au from 347.6m
o
2.9m @ 0.5g/t Au from 286.2m in 24YRLEIS0002,
o
3.8m @ 0.4g/t Au from 384.1m in 24YRLEIS0002,
o
Including 0.3m @ 1.9g/t Au from 385.5m
0.5m @ 2.2g/t Au from 393.2m in 24YRLEIS0002,
These results demonstrate that mineralisation and broad low-level gold anomalism occur
within the NEG intrusive body, with higher grades associated with increased vein/fracture
density or frequency (see Figure 3). Significantly, this veining and fracturing are spatially
associated with narrow shear zones.
Within 24YRLEIS0001, higher grade intervals of note include:
o
0.7m @ 1.3g/t Au from 105.5m in 24YRLEIS0001
Including 0.4m @ 1.7g/t Au from 105.5m
o
8.0m @ 0.4g/t Au from 137.0m in 24YRLEIS0001,
o
9.5m @ 0.3g/t Au from 151m in 24YRLEIS0001
The 9.5m @ 0.3g/t interval occurs within heavily deformed and altered granodiorite adjacent to
the sheared intrusive contact with a heavily deformed and altered intermediate volcanic and
clastic sequence (see Figure 4).
Key Insights
Results and geological observations from the diamond drilling demonstrate that the NEG
Intrusive body has the potential to host mineralisation both around the intrusive contact and
within the granitoid, confirming primary mineralisation within fresh rock. This expands the
yandalresources.com.au | ASX:YRL
3
exploration search space to include structures within the NEG, not just the intrusive contact.
Structural trends observed within the diamond core also enable the delineation of more discrete
targets across the Prospect.
The southern and eastern intrusive contacts appear sub-vertical or steeply dipping to the
northeast and east, respectively. The southern intrusive contact is heavily sheared, with subvertical foliation and veins evident in the heavily altered footwall intermediate unit.
The shears within 24YRLEIS0002 strike to the northwest and dip between 55° and 65° to the
northeast. The frequency of veining and fracture around these shears correlates with an
increase in grade. The observations from logged shear zones enable the extrapolation of the
structures along strike where they may interact with intrusive contact or other structures. This
interaction presents priority follow-up targets for RC drilling (See Figure 2). Aerial magnetic
interpretations suggest several similar trending features crosscut the granitic body regularly,
often with a spatial correlation to regolith anomalism with historic RAB and AC drilling. The
interaction of these features with the intrusive margin also presents discrete targets of interest.
Observing mineralisation within the intrusive also presents an opportunity to target structural
features, such as cross-cutting structures, structural jogs, or compositional variation within the
large NEG intrusive body. A review of all available aerial magnetic and gravity datasets is
underway to identify discrete structural targets within the NEG.
Next Steps
The EIS diamond drilling has fulfilled the program objectives, demonstrating that the primary
source of regolith anomalism is??across the eastern margin of the New England Granite. The
drilling has also allowed the exploration team to assess the ideal drilling direction to test the
intrusive. The projection of several structures observed within the diamond core has also resulted
in several more discrete targets.
Follow-up RC drilling has commenced. The RC drilling will focus on testing the anomalous
intrusive margin more broadly, focusing on where northwest striking structures interact with
contact. The 2,500m program is expected to take ten days to complete. In addition, selected
samples from the diamond drilling program will be submitted for multi-element analysis.
yandalresources.com.au | ASX:YRL
4
Figure 1: A simplified geology plan across the IWB Gold Project shows active prospects and
exploration target areas.
yandalresources.com.au | ASX:YRL
5
Northwest structures
interpreted from aerial
magnetics
Surface Projection of
shear zone observed in
24YRLEIS0002
Structural target where
the shear interacts with
the intrusive contact
Figure 2: A Collar plan for the New England Granite Prospect displaying all drilling collars,
colour-coded by max Au in hole (g/t Au), overlying a simplified interpretation of bedrock
geology. The projection of the shear zone trend identified in 24YRLEIS0002 is also plotted and
labelled.
yandalresources.com.au | ASX:YRL
6
Wes t
Ea s t
BOT
Transported
Cover
BOCO
A broad zone of anomalous Au
including:
• 2.9m @ 0.5g/t Au from 286.2m
• 3.3m @ 1.1g/t Au from 345.3m
• 3.8m @ 0.4g/t Au from 384.1m
• 0.5m @ 2.1g/t Au from 393.2m
Conceptual
structural target
where shear zones
interact with the
intrusive contact
Basalt
Granitoid
Figure 3: New England Granite cross section showing diamond hole 24RYLEIS0002 results and
interpretation of mineralisation. See Figure 2 for section location.
yandalresources.com.au | ASX:YRL
7
NE
SW
BOT
Transported
Cover
5m @ 1.6g/t Au
3m @ 0.5g/t Au
3m @ 2.0g/t Au
BOCO
0.7m @ 1.3g/t Au
8m @ 0.4g/t Au
18m @ 0.5g/t Au
9.5m @ 0.3g/t Au from 151m
Heavily altered, foliated and
fractured intrusive contact
Granitoid
Intermediate volcanic /
clastic
Figure 4: New England Granite cross section showing diamond hole 24RYLEIS0001 results and
interpretation of mineralisation. See Figure 2 for section location.
yandalresources.com.au | ASX:YRL
8
Looking Ahead
The Company remains well positioned to maintain a high level of exploration throughout 2024
with priority exploration activities and forthcoming news, including;
1.
Follow-up RC drilling across the New England Granite target area has commenced,
2.
The results of the recently completed diamond drilling at Quarter Moon are expected in
the coming weeks,
3.
Line clearing across the Caladan and Irulan targets is ongoing in preparation for an AC
drilling program in early October,
4.
A second phase of soil sampling covering the broader Caladan target area is
complete. Results are expected in 6-8 weeks.
Authorised by the board of Yandal Resources
For further information, please contact:
Chris Oorschot
Managing Director
Yandal Resources Limited
yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL
Greg Fitzgerald
Company Secretary
+61 8 9389 9021
yandal@yandalresources.com.au
9
Relevant Previous ASX Announcements
o
IWB Soil Results & NEG Diamond Drilling Complete, 12 August 2024
o
Gold Coast Investment Showcase Presentation, 20 June 2024
o
Drilling at Oblique Confirms Large Scale Potential, 25 October 2023
o
Heritage Clearance Received for Drill Testing of Key Prospects at Ironstone
Well-Barwidgee, 24 July 2023
o
Presentation at RIU Sydney Resources Round-up Conference, 9 May 2023
o
Replacement Prospectus, 12 December 2018 Replacement Prospectus, 12
December 2018
yandalresources.com.au | ASX:YRL
10
About Yandal Resources Limited
Yandal Resources has a portfolio of advanced gold exploration projects in the highly prospective Yandal
and Norseman-Wiluna Greenstone Belts of Western Australia.
Yandal Resources’ gold project locations.
Table 1 – Yandal Resources Ltd - Mineral Resource Summary
Indicated
Deposit
Tonnes
(‘000s)
Inferred
Grade
(g/t)
Au
(oz)
1.3
91,000
Tonnes
(‘000)
Total
Grade
(g/t)
Au
(oz)
5,245
1.1
177,000
Tonnes
(000’s)
Grade
(g/t)
Au
(Oz)
7,386
1.1
268,000
Ironstone Well
Flushing Meadows1
2,141
Mt McClure
Challenger2
718
1.9
44,000
718
1.9
44,000
Success3
1,255
1.9
75,000
1,255
1.9
75,000
Parmelia4
252
2.1
17,000
252
2.1
17,000
HMS Sulphur5
1010
1.2
39,000
1010
1.2
39,000
Gilmore6
134
1.7
7,200
134
1.7
7,200
3,369
1.7
182,200
3,369
1.7
182,200
365
1.7
20,000
365
1.7
20,000
8,979
1.3
379,200
11,120
1.4
470,200
Sub-total - MMC
Gordons
Gordons Dam7
Grand-total8
2,141
1.3
91,000
Due to the effects of rounding, totals may not represent the sum of the individual components.
1.
Reported above 0.5g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 4 November 2020 for full
details. 2. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 22 August 2022
for full details 3. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 6
September 2022 for full details.4. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement
dated 20 September 2022 for full details 5. Reported above 0.5g/t Au lower cut-off grade within this announcement 6. Reported
above 1.0g/t Au lower cut-off grade within this announcement 7. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal
Resources Ltd ASX announcement dated 6 April 2023 for full details 8. All Resources are reported as global estimates, not constrained
by optimised pit shells.
yandalresources.com.au | ASX:YRL
11
Competent Person Statement
The information in this document related to Exploration Targets and Exploration Results, geology and data
compilation is based on information reviewed or compiled by Mr Christopher Oorschot, a Competent
Person who is a Member of The Australasian Institute Geoscientists. Mr Oorschot is the Managing Director
of the Company, is a full-time employee and holds shares and options in the Company. Mr Oorschot has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Oorschot consents to the inclusion in this announcement of the matters based on this information in the
form and context in which it appears.
The information in this announcement that relates to the Flushing Meadows, Mt McClure and Gordons Dam
Mineral Resource Estimates is based on information compiled and generated by Andrew Bewsher, an
employee of BM Geological Services Pty Ltd (“BMGS”). Both Andrew Bewsher and BMGS hold shares in
the Company. BMGS consents to the inclusion, form and context of the relevant information herein as
derived from the original resource reports. Mr Bewsher has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration and to the activity which is being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the JORC ‘Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves’.
YRL confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
Forward Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include, but
are not limited to, statements concerning Yandal Resources Limited’s (Yandal’s) current expectations,
estimates and projections about the industry in which Yandal operates, and beliefs and assumptions
regarding Yandal’s future performance. When used in this document, words such as “anticipate”, “could”,
“plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are
forward-looking statements. Although Yandal believes that its expectations reflected in these forwardlooking statements are reasonable, such statements are subject to known and unknown risks, uncertainties
and other factors, some of which are beyond the control of Yandal and no assurance can be given that
actual results will be consistent with these forward-looking statements. Drilling results presented indicate
geological potential for mineralisation, but there can be no certainty that these results will eventually form
part of a Mineral Resource Estimation.
yandalresources.com.au | ASX:YRL
12
Table 2: Summary of 2024 diamond drilling across the New England Granite Prospect.
Hole ID
Hole
Type
Dip
(degrees)
Azimuth
(degrees)
Total
Depth
(m)
East
(m)
North
(m)
RL
(m AHD)
24YRLEIS0001
24YRLEIS0002
DD
DD
-59.3
-60.0
219.3
270.0
400.3
400.0
295307.9
295954.2
7011908.9
7013448.7
496.0
505.6
Table 3 – New England Granite - Summary of significant diamond drilling assay results with a final
length weighted composite value >0.3g/t Au and with no more than 2m of continuous internal
waste included unless otherwise stated.
Hole
ID
Sample
type
From
(m)
To
(m)
Interval
(m)
Au
(g/t)
Comment
24YRLEIS0001
24YRLEIS0001
24YRLEIS0001
24YRLEIS0001
24YRLEIS0002
24YRLEIS0002
24YRLEIS0002
24YRLEIS0002
24YRLEIS0002
24YRLEIS0002
24YRLEIS0002
24YRLEIS0002
24YRLEIS0002
24YRLEIS0002
24YRLEIS0002
24YRLEIS0002
Half HQ
Half NQ
Half NQ
Half NQ
Half NQ
Half NQ
Half NQ
Half NQ
Half NQ
including
Half NQ
Half NQ
Half NQ
Half NQ
including
Half NQ
105.5
119.0
137.0
151.0
286.2
319.0
327.0
337.8
345.3
347.6
351.2
363.0
380.8
384.1
385.5
393.2
106.2
120.0
145.0
160.5
289.0
323.0
333.3
340.8
348.5
348.5
353.0
364.4
381.4
387.8
385.8
393.6
0.7
1.0
9.5
9.5
2.9
4.0
6.3
3.0
3.3
0.9
1.9
1.4
0.6
3.8
0.3
0.5
1.3
0.6
0.4
0.3
0.5
0.3
0.3
0.3
1.1
1.8
0.5
0.7
0.5
0.4
1.9
2.2
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
yandalresources.com.au | ASX:YRL
13
Appendix 1 – Ironstone Well-Barwidgee Gold Project, YRL 2024 Diamond Drilling, New England Granite Prospect
JORC Code (2012) Table 1, Sections 1 and 2
Mr. Christopher Oorschot, Exploration Manager and Technical Director of Yandal Resources compiled the information in Section 1 and Section 2 of the
following JORC Tables and is the Competent Person for those sections. The following Table and Sections are provided to ensure compliance with the JORC
Code (2012 edition) requirements for the reporting of Exploration Results.
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
•
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
•
•
•
•
•
Aspects of the determination of mineralisation that are
Material to the Public Report. In cases where ‘industry
standard’ work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was used to obtain
1 m samples from which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other cases more
ASX Announcement 24 September 2024
•
Yandal Resources (YRL) diamond core samples include HQ2 (63.5mm diameter) and NQ2
(50.5mm diameter) core. The core was halved using a core saw, with the right-hand side
of the core (looking downhole) sampled.
Before sampling, the core is logged by a company geologist for lithology type, veining,
alteration, and deformation. Sample lengths vary subject to logged geological intervals
of interest, with a minimum sample length of 0.2 metres and a maximum sample length of
1.0 metres.
Sample quality is considered high.
Sample recovery of each metre drilled was measured and recorded, and high-resolution
photos of each tray prior to cutting were obtained. The unsampled half of the drill core is
also retained. Intervals where the core is un-oriented have been recorded.
When the core is cut for sampling, the same side of the core, relative to the bottom-ofhole orientation mark, is collected for analysis. For intervals without an orientation mark,
the core is pieced together, and foliation or common structures are used to
approximately orient the core for sampling purposes.
Structural observations have also been recorded where the diamond core is oriented,
and structures sub-parallel to the core axis recorded.
For all diamond drilling results, HQ2 core and NQ2 core was cut in half and used to obtain
0.2m to 1.0m half core samples. These samples were submitted to a laboratory, where
they were dried, weighed, and crushed. The Sample pulp was then split to produce a 50g
lead collection fire assay, which was then analysed by Inductively Coupled Plasma
Optical (Atomic) Emission Spectrometry (ICP-OES).
Page 14
Criteria
JORC Code explanation
Commentary
explanation may be required, such as where there is
coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed information.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (e.g. core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type, whether
core is oriented and if so, by what method, etc).
•
YRL diamond core was drilled using HQ2 (63.5mm core diameter) and NQ2 (50.5mm core
diameter) coring bits. For both diamond holes, diamond core drilling commenced from
the surface. Subject to ground conditions, the core was oriented using a downhole
orientation tool (Reflex ACT Mk3 NQ/HQ Core Ori kit).
Drill sample
recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.
•
For YRL, diamond drilling core recovery is measured and recorded. The length of core
recovered for each metre drilled is measured to the nearest 5cm and entered into an
Excel spreadsheet along with information relating to fracture frequency (driller breaks are
marked with a red “X”). In addition, dry and wet core photos are collected prior to the
cutting of the core and are retained on the company server.
For YRL diamond drilling, the orientation of contacts, veins and shears are regularly
measured and monitored.
No relationship or bias between sample recovery and grade within the diamond drilling
results has been observed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Logging
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
•
•
•
•
For YRL diamond drilling, a full log of all diamond cores was completed by the supervising
geologist in the field. Intervals were logged at various intervals based on changes in
lithology, deformation intensity, veining types, and alteration. Both planar and linear
structural measurements were also collected using a core orientation stand and a
kenometer. Logging data was captured in Excel spreadsheets and imported into an MX
Deposit database.
All observations are qualitative in nature.
The total length and percentage of the relevant
intersections logged.
Sub-sampling
techniques
If core, whether cut or sawn and whether quarter, half or
all core taken.
ASX Announcement 24 September 2024
•
•
The HQ2 (63.5mm diameter) and NQ2 (50.5mm diameter) cores were halved using a core
saw, and the right-hand side of the core (looking downhole) was sampled.
Diamond core samples are of high quality; the half core samples are dried at 100°C to
Page 15
Criteria
JORC Code explanation
and sample
preparation
If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality of
assay data
and
laboratory
tests
Commentary
•
•
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
•
Measures taken to ensure that the sampling is
representative of the in situ material collected, including
for instance results for field duplicate/second-half
sampling.
•
Whether sample sizes are appropriate to the grain size of
the material being sampled.
•
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
•
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation,
etc.
•
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
•
•
•
•
ASX Announcement 24 September 2024
constant mass, crushed to <10mm and pulverised to nominally 85%, passing 75µm in
preparation for Au analysis.
Repeat analysis of pulp samples occurs across 5% of all submitted YRL samples.
No core duplicates were submitted for analysis; the second half of the core will be
dispatched to the GSWA core library as per Exploration Incentive Scheme requirements
and will be available for follow-up analysis upon request.
When determining sample intervals, core is sampled to contacts where observed so that
material from a geological interval of interest is not included within the adjacent
geological interval.
Where an interval of interest is observed, samples are collected 6m on either side of the
interval of interest.
Where narrow geological intervals of interest are observed, such as quartz veining, sample
lengths are reduced so that only the feature of interest is sampled down to a minimum
length of 0.2m.
Sample lengths and sizes are appropriate given the fine-to-medium-grained nature of the
sampled material.
For YRL diamond drilling, samples were assayed using a 50g lead collection fire assay with
ICP-OES finish for gold analysis with a 0.005 ppm detection limit by Intertek Genalysis
laboratory in Perth, Western Australia. This is considered a total digest and appropriate for
the targeted style of mineralisation.
Magnetic susceptibility measurements were taken every meter using a KT-10 V2
instrument with a sensitivity of 1x10-6 SI Units.
YRL QAQC field protocols include the insertion of commercially prepared certified
reference material (CRM) and blank material at a rate of approximately 1 CRM/blank for
every 20 samples collected. CRMs used are un-identifiable by the lab when received.
QAQC performance is monitored upon receipt of each batch of results and re-assessed
once all samples for a program are received.
Laboratory QA/QC protocols involve inserting internal lab standards using CRMs, blanks,
repeat analysis of pulps and screen tests (the percentage of pulverised material passing
75µm mesh). Laboratory QAQC results are reported with each batch. Laboratory QAQC
performance is monitored upon receipt of each batch of results and assessed once all
samples for a program are received.
No duplicate samples were submitted for analysis. The alternate half of the core will be
retained by the Geological Survey of Western Australia core library as per Exploration
Incentive Scheme requirements and will be available for follow-up analysis upon request
Page 16
Criteria
JORC Code explanation
Verification
of sampling
and assaying
The verification of significant intersections by either
independent or alternative company personnel.
•
Significant intercepts from YRL diamond drilling are verified by YRL geologists through
the visual inspection of the residual half core, the inspection of core photos and the
review of the spatial location of mineralisation relative to previous intercepts and in the
case of high-grade gold intercepts, the inspection of the core for visible gold.
•
For all YRL data, primary sampling and logging data are entered into Excel spreadsh
Share your feedback
Discover