Half Yearly Report and Accounts
Released
Released
Announcement PDF
Interim Financial Report
for the half-year ended
31 December 2024
ABN 86 108 753 608
Interim Financial Report for the half-year ended 31 December 2024
Corporate Directory
Directors
Greg Evans - Non-Executive Chair
Tim Kennedy – Non-Executive Director
Katina Law - Non-Executive Director
Chris Oorschot - Managing Director
Company Secretary
Greg Fitzgerald
Registered office
Unit 5/62 Ord Street
West Perth WA 6005
Ph: +61 8 6149 7177
Email: yandal@yandalresources.com.au
Web: www.yandalresources.com.au
Share registry
Automic Registry Services
Level 5, 191 St George’s Terrace
Perth WA 6000
Ph: 1300 288 664
www.automic.com.au
Auditor
HLB Mann Judd
Level 4, 130 Stirling Street
Perth WA 6000
Solicitors
Steinepreis Paganin
Level 4, The Read Buildings
16 Milligan Street
Perth WA 6000
Stock exchange listing
Australian Securities Exchange (ASX Code: YRL)
ABN
86 108 753 608
1
Interim Financial Report for the half-year ended 31 December 2024
Directors' report
3
Auditor's independence declaration
16
Directors' declaration
17
Statement of profit or loss and other comprehensive income
18
Statement of financial position
19
Statement of changes in equity
20
Statement of cash flows
21
Notes to the financial statements
22
Independent auditor's review report to the members of Yandal Resources Limited
29
2
Interim Financial Report for the half-year ended 31 December 2024
Directors’ Report
The Directors present their interim financial report of Yandal Resources Limited (referred to hereafter as the
'Company') for the half-year ended 31 December 2024.
Directors
The Directors of Yandal Resources Limited (“Yandal Resources”) submit herewith the financial report for the halfyear ended 31 December 2024. In order to comply with the provisions of the Corporations Act 2001, the Directors
report as follows:
The names of the Directors of the Company during or since the end of the half-year are:
Greg Evans (Non-Executive Chairman)
Katina Law (Non-Executive Director)
Tim Kennedy (Non-Executive Director) – resigned as Managing Director on 1 July 2024 and appointed as
Executive Director on that date, and then transitioned to a Non-Executive Director from 1 October 2024)
Chris Oorschot (Managing Director) - appointed on 1 July 2024
Review of operations
Operating Results
The operating loss of the Company for the six months amounted to $3,255,669 (31 December 2023: $2,088,883).
Review of Operations/Exploration Activity
The Company has a portfolio of gold exploration projects in the highly prospective Yandal and Norseman-Wiluna
Greenstone Belts of Western Australia (Figure 1). Over the last six months, exploration has focused on the Ironstone
Well-Barwidgee Gold Project, with minor activities completed across the Mt McClure and Gordons Gold Projects.
Exploration activities have increased significantly at Ironstone Well-Barwidgee following the Siona gold discovery in
October 2024.
3
Interim Financial Report for the half-year ended 31 December 2024
Figure 1: Yandal Resources’ gold project locations.
4
Interim Financial Report for the half-year ended 31 December 2024
IRONSTONE WELL-BARWIDGEE GOLD PROJECT
The 100% owned IWB Gold Project covers approximately 370km² of highly prospective and under-explored tenure
located between the Jundee and Bronzewing mines in the northern Yandal Greenstone Belt (Figure 2).
Yandal has an established Resource of 268,000oz of gold at Flushing Meadows and considers there to be strong
potential to make new discoveries and expand this resource base within its’ extensive tenure holding. (Refer to the
ASX announcement of 4 November 2020 for details of the Flushing Meadows Resource).
The project area includes several priority early-stage prospects, where analysis completed by the Yandal
exploration team has delineated new targets. It also includes several advanced prospects, where limited historic
and Yandal drilling has returned robust gold intercepts, indicating the potential for large-scale discoveries. Both the
early-stage and more advanced prospects are the focus of ongoing exploration.
These prospects include the recent Siona discovery hosted within the New England Granite (NEG), located towards
the southern end of the project, and two earlier-stage but large-scale and highly prospective target areas, Irulan
and Caladan, located in the central portion of the project.
Figure 2: Simplified geology plan across the IWB Gold Project showing active prospects and exploration target
areas, including the Siona and Arrakis Prospects.
5
Interim Financial Report for the half-year ended 31 December 2024
New England Granite
The NEG prospect comprises a 4.2km long, 2km wide granitoid, covered by 6-20m of transported cover and exhibits
strong regolith gold anomalism in shallow historical drilling proximal to the eastern contact (Figure 2 and Figure 3).
RC drilling targeting structures observed in two 400m deep diamond holes, 24YRLEIS0001 and 24YRLEIS0002, resulted
in the Siona discovery.
Siona Discovery
Following the completion of the updated targeting model at NEG, an RC program comprising 2,400m of drilling for
twelve holes designed to test structural targets proximal to the eastern intrusive margin was initiated (Figures 3 and
4). Two holes, 24IWBRC0039 and 24IWBRC0044, intercepted significant mineralisation and defined an emerging
gold discovery named the Siona Prospect. These results were reported to the ASX on 21 October 2024.
Follow-up RC drilling commenced across Siona in early November, and by late December, fourteen holes for
2,900m had been completed, testing the main northwest striking Siona trend (see ASX release dated 25 November
2024). This drilling highlighted mineralisation continuity over more than 450m along strike and demonstrated a range
of mineralisation styles with intercepts including:
●
●
●
●
●
●
●
●
107*1 @ 1.0 g/t Au from 96m to end-of-hole in 24IWBRC0039 (ETW of 30-40m)
- Original intercept extended from 78m @ 1.2g/t after re-entry
80m*1 @ 1.0g/t Au from 67m in 24IWBRC0047(ETW of 30-40m)
17m*1 @ 4.9g/t Au from 85m in 24IWBRC0050 (ETW of 8-10m)
14m*1 @ 1.8/t Au from 63m in 24IWBRC0044 (ETW of 10-12m)
35m*1 @ 1.0g/t Au from 122m in 24IWBRC0046 (ETW of 28-32m)
23m*1 @ 1.3 g/t Au from 102m in 24IWBRC0048 (ETW of 12-18m)
26m*1 @ 0.5g/t Au from 267m in 24IWBRC0054 (ETW 14-20m)
18m*1 @ 0.7g/t Au from 141m in 24IWBRC0055 (ETW 10-16m)
*1 All intercept lengths are reported as down-hole lengths as the true width is uncertain; an estimate of true width
(ETW) is provided for the primary Siona intercepts.
6
Interim Financial Report for the half-year ended 31 December 2024
Figure 3: A Collar plan for the broader New England Granite area displaying all drilling collars, colour-coded by
max Au in hole (g/t Au), overlying a simplified interpretation of bedrock geology. Note interpreted northwest
trending structures internal to the New England Granite.
7
Interim Financial Report for the half-year ended 31 December 2024
Figure 4: Plan view over the Siona discovery area displaying all drilling and drill traces. Previous RAB and AC
drilling collars are colour-coded by max Au (g/t) in the hole. A simple projection of the granodiorite-basalt
contact is shown. Underlying the plan is a composite aerial magnetic image (total magnetic intensity and
reduce-to-pole first vertical derivative). Please note that 24IWBRC0056 and 24IWBRC0058 did not reach the
respective planned depths.
8
Interim Financial Report for the half-year ended 31 December 2024
Figure 5: A plan showing the northern half of the New England Granite area displaying all historic RAB and aircore collars, colour-coded by max Au in hole (g/t Au), overlying a composite aerial magnetic image. Plotted is
the extent of the broad-scale regolith anomaly and the approximate location of structural targets that will be
tested with RC drilling over the coming months.
Irulan and Caladan Targets
In June 2024, a series of new high-priority targets were identified based on detailed gravity data collected by
Yandal and a comprehensive analysis of open file data. Most notable was the identification of the Irulan and
Caladan targets, which show broad similarities to several world-class gold camps (see ASX Release 11th of June
2024):
●
●
The interpreted Caladan Fold displays similarities to the broader structural setting of the Boomerang Anticline
that hosts the Golden Mile Deposit and the folded mafic sequence of the Timmins-Porcupine gold district in
Canada,
The interpreted Irulan Dolerite Complex resembles the litho-structural setting of the Jundee deposits but on a
smaller scale.
Across the Caladan and Irulan Targets, several low-level in-situ saprolite anomalies were identified within shallow
historical drilling, including a continuous 3km long northwest striking anomaly within the core of the interpreted
Caladan Fold designated CAL-01. Significantly, this broad-spaced drilling was shallow and only tested upper
saprolite clays, a portion of the regolith profile prone to gold depletion across the Yandal Greenstone Belt. This
underscores the attractive interpreted structural setting and untested nature of this large target area, emphasising
the need for more effective exploration.
9
Interim Financial Report for the half-year ended 31 December 2024
Air-core drilling commenced in October and includes one line across the core of the Caladan target area, testing
the central part of the CAL-01 anomaly and 800m spaced lines across the northern half of the Irulan target area
testing the IRU-01 anomaly.
Caladan AC Results
Results from the Caladan AC drilling program were received after the 31st of December (see ASX release dated
15 January 2025). The 2024 AC drilling program across the Caladan target area included seventeen holes for
1,688m of drilling, variably spaced (80m to 200m) along a single northeast-trending (towards 045°) drilling line.
Results from the 2024 AC drilling program across the Caladan fold returned a cluster of significant intercepts, all
within or proximal to the in-situ regolith Au anomaly CAL-01 (See Figures 6 and 7), including:
●
●
●
●
●
11m @ 1.7 g/t Au from 97m to end-of-hole in 24IWBAC063, including
3m @ 3.5 g/t Au from 102m
2m @ 1.2 g/t Au from 74m in 24IWBAC013
4m @ 0.5 g/t Au from 88m in 24IWBAC016
3m @ 0.2 g/t Au from 81m in 24IWBAC015
The significant intercept in 24IWBAC0063 is located on the northeast margin of the CAL-01 regolith anomaly. This
result, combined with the adjacent intercepts, demonstrates a potential correlation between the shallow CAL-01
regolith Au anomaly and a primary mineralisation source. This new prospect has been named Arrakis.
The 11m @ 1.7g/t intercept within 24IWBAC063 is hosted within an interpreted sheared intermediate (andesite)
volcaniclastic unit, displaying strong sericite alteration, up to 3% veining and 5-10% fine disseminated sulphides as
a combination of both pyrite and arsenopyrite (see Figure 3). The Arrakis Prospect is overlain by 10-14m of
transported cover.
In addition to the significant intercept, the air-core drilling has also confirmed gravity highs to coincide with
fractionated dolerites, separated by a sequence dominated by variably altered intermediate (andesite)
volcaniclastics. Drilling results combined with observed geology have reaffirmed the Company’s prioritisation of
the Caladan target area within the 2025 exploration strategy.
Follow-up drilling will be scheduled and completed across the Arrakis Prospect in the coming weeks. Drilling will be
limited to the existing single air-core line until further heritage surveys can be completed to clear additional drill
lines across the 8km long, 3km wide Caladan Fold structure. This will include drill lines north and south of the Arrakis
intercepts.
10
Interim Financial Report for the half-year ended 31 December 2024
Figure 6: A collar plan over the Caladan target area, showing simplified bedrock geology interpretation across
the Caladan and northern Irulan target areas within the IWB Gold Project. The collars of the 2024 air-core drilling
and the historic 1995 RAB drilling are plotted and thematically coloured by max Au (g/t Au). In-situ regolith Au
(ppb) anomalies derived from the 1995 RAB drilling are contoured on the plan. The blue outline represents the
Yandal tenements. The underlying processed ground gravity image is derived from Bouguer anomaly 0.5 vertical
derivative with north-west shade and a non-linear colour scale image.
11
Interim Financial Report for the half-year ended 31 December 2024
Figure 7: Cross section showing air-core results from 24IWBAC015, 24IWBAC016 and 24IWBAC063 with a simple
preliminary interpretation of geology. The section location is shown in Figure 6. The section shows all drilling +/-25m
away from the section plane.
MT MCCLURE GOLD PROJECT
The Mt McClure Project is located 15km south-west of the historic Bronzewing gold mine and 10km from the Orelia
gold mine, both owned by Northern Star Resources Ltd (ASX: NST) in the southern Yandal Greenstone Belt (Figures
1 and 8). The project covers a total strike length of 17km of prospective stratigraphy and includes several shallow
historical open-cut pits.
The Mt McClure Mineral Resource Inventory is 182,200oz @ 1.7 g/t Au, all located on granted mining leases.
The project has prospectivity for new shallow gold deposits adjacent to current Resources and in the footwall and
hanging wall of the stratigraphy. The Company intends to complete targeting and target testing in 2025.
12
Interim Financial Report for the half-year ended 31 December 2024
Figure 8: Mt McClure tenement plan showing the location of major prospects, interpreted bedrock lithology,
major structures and proximity to nearby mines.
GORDONS GOLD PROJECT
The Gordons Project is located 30km north of Kalgoorlie and 15km north of the Kanowna Belle Gold Mine (ASX
Code: NST), close to processing and haulage infrastructure (Figure 1).
The Project tenements straddle the eastern flank of the Scoti-Kanowna Dome, a geological feature that is a
regional control on mineralisation, including the multi-million ounce Kanowna Belle and Paddington gold mines.
13
Interim Financial Report for the half-year ended 31 December 2024
In mid-2023, the Company acquired exploration licence E27/701 (in application) abutting the southern boundary
of the project. This acquisition was in response to a 3D structural study that interpreted an important structural
corridor (the Gordon Sirdar Shear Zone or “GSSZ”) passing through the eastern portion of Yandal’s tenure, beyond
which it extended south in close proximity to the Gordon Sirdar Mine and then through E27/701.
Yandal has completed a target generation exercise over the GSSZ and has plans to drill test these once E27/701
has been granted and access is finalised.
CORPORATE ACTIVITY
●
●
$5.5m raised (before costs) following the exercise and underwriting of 22.9m Options with a $0.24 exercise price
and 31 October 2024 expiry date.
The exercise of $0.11 Options resulted in the receipt of an additional $2.0m of cash in the December 2024
quarter.
Table 1: Yandal Resources Ltd - Mineral Resource Summary
Due to the effects of rounding, totals may not represent the sum of the individual components.
1. Reported above 0.5g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 4 November 2020 for full details.
2. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 22 August 2022 for full details
3. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 6 September 2022 for full details.
4. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 20 September 2022 for full details
5. Reported above 0.5g/t Au lower cut-off grade within this announcement
6. Reported above 1.0g/t Au lower cut-off grade within this announcement
7. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 6 April 2023 for full details
8. All Resources are reported as global estimates, not constrained by optimised pit shells.
There were no significant changes in the state of affairs of the Company during the period.
Competent Person Statement
The information in this document related to Exploration Targets and Exploration Results, geology and data
compilation is based on information reviewed or compiled by Mr Christopher Oorschot, a Competent Person who
is a Member of The Australasian Institute Geoscientists. Mr Oorschot is the Managing Director for the Company, is a
full-time employee and holds shares and options in the Company. Mr Oorschot has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting
14
Interim Financial Report for the half-year ended 31 December 2024
of Exploration Results, Mineral Resources and Ore Reserves’. Mr Oorschot consents to the inclusion in this
announcement of the matters based on this information in the form and context in which it appears.
The information in this announcement that relates to the Flushing Meadows Mineral Resource Estimate and the
Success, Challenger and Parmelia Mineral Resource Estimates at Mt McClure is based on information compiled
and generated by Andrew Bewsher, an employee of BM Geological Services Pty Ltd (“BMGS”). Both Andrew
Bewsher and BMGS hold shares in the company. BMGS consents to the inclusion, form and context of the relevant
information herein as derived from the original resource reports. Mr Bewsher has sufficient experience relevant to
the style of mineralisation and type of deposit under consideration and to the activity which is being undertaken
to qualify as a Competent Person as defined in the 2012 Edition of the JORC ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’.
Yandal confirms that it is not aware of any new information or data that materially affects the information included
in the original market announcement. The Company confirms that the form and context in which the Competent
Person’s findings are presented have not been materially modified from the original market announcement.
Forward Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include, but are not
limited to, statements concerning Yandal Resources Limited’s (Yandal’s) current expectations, estimates and
projections about the industry in which Yandal operates, and beliefs and assumptions regarding Yandal’s future
performance. When used in this document, words such as “anticipate”, “could”, “plan”, “estimate”, “expects”,
“seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are forward-looking statements. Although
Yandal believes that its expectations reflected in these forward-looking statements are reasonable, such
statements are subject to known and unknown risks, uncertainties and other factors, some of which are beyond
the control of Yandal and no assurance can be given that actual results will be consistent with these forwardlooking statements. Drilling results presented indicate geological potential for mineralisation but there can be no
certainty that these results will eventually form part of a Mineral Resource Estimate.
Matters subsequent to the end of the financial half-year
No matter or circumstance has arisen since 31 December 2024 that has significantly affected, or may significantly
affect the Company's operations, the results of those operations, or the Company's state of affairs in future financial
years.
Auditor's independence declaration
A copy of the auditor's independence declaration as required under section 307C of the Corporations Act 2001 is
set out immediately after this Directors' report.
This report is made in accordance with a resolution of Directors, pursuant to section 306(3)(a) of the Corporations
Act 2001.
On behalf of the Directors
___________________________
Greg Evans
Non - Executive Chair
11 March 2025
Perth, Western Australia
15
AUDITOR’S INDEPENDENCE DECLARATION
As lead auditor for the review of the interim financial report of Yandal Resources Limited for the halfyear ended 31 December 2024, I declare that to the best of my knowledge and belief, there have been
no contraventions of:
a)
the auditor independence requirements of the Corporations Act 2001 in relation to the review;
and
b)
any applicable code of professional conduct in relation to the review.
Perth, Western Australia
11 March 2025
B G McVeigh
Partner
16
Interim Financial Report for the half-year ended 31 December 2024
Directors’ Declaration
In the Directors' opinion:
●
the attached financial statements and notes comply with the Corporations Act 2001, Australian Accounting
Standard AASB 134 'Interim Financial Reporting', the Corporations Regulations 2001 and other mandatory
professional reporting requirements;
●
the attached financial statements and notes give a true and fair view of the Company's financial position as
at 31 December 2024 and of its performance for the financial half-year ended on that date; and
●
there are reasonable grounds to believe that the Company will be able to pay its debts as and when they
become due and payable.
Signed in accordance with a resolution of Directors made pursuant to section 303(5)(a) of the Corporations Act
2001.
On behalf of the Directors
___________________________
Greg Evans
Non - Executive Chair
11 March 2025
Perth, Western Australia
17
Interim Financial Report for the half-year ended 31 December 2024
Condensed Statement of Profit or Loss and Other Comprehensive
Income for the half-year ended 31 December 2024
Note
Revenue
Interest income
Other income
Expenses
Exploration expenditure
Employee benefits expenses
Administration fees
Professional fees
Finance costs
Share based payments
Depreciation expenses
5
Loss before income tax expense
31 Dec 2024 31 Dec 2023
$
$
98,319
98,319
55,836
122
55,958
(2,806,126)
(140,586)
(180,222)
(90,019)
(2,360)
(101,917)
(32,758)
(1,746,479)
(133,533)
(102,792)
(69,465)
(5,278)
(44,657)
(42,637)
(3,255,669)
(2,088,883)
-
-
(3,255,669)
(2,088,883)
-
-
(3,255,669)
(2,088,883)
Cents
Cents
Income tax expense
Loss after income tax expense for the half-year attributable to the owners of
Yandal Resources Limited
Other comprehensive income for the half-year, net of tax
Total comprehensive loss for the half-year attributable to the owners of Yandal
Resources Limited
Basic loss per share
Diluted loss per share
(1.17)
(1.17)
(1.22)
(1.22)
The above statement of profit or loss and other comprehensive income should be read in conjunction with the
accompanying notes
18
Interim Financial Report for the half-year ended 31 December 2024
Condensed Statement of Financial Position as at 31 December 2024
Note
31 Dec 2024
$
30 Jun 2024
$
7
9,833,828
232,307
10,066,135
5,828,509
273,620
6,102,129
6
167,826
6,143
173,969
175,757
18,429
194,186
10,240,104
6,296,315
1,118,419
6,706
1,125,125
1,170,637
19,724
1,190,361
Total liabilities
1,125,125
1,190,361
Net assets
9,114,979
5,105,954
42,959,536
632,966
(34,477,523)
35,743,130
1,470,186
(32,107,362)
9,114,979
5,105,954
Assets
Current assets
Cash and cash equivalents
Trade and other receivables
Total current assets
Non-current assets
Property, plant and equipment
Right-of-use assets
Total non-current assets
Total assets
Liabilities
Current liabilities
Trade and other payables
Lease liabilities
Total current liabilities
9
8
Equity
Issued capital
Reserves
Accumulated losses
11
10
Total equity
The above statement of financial position should be read in conjunction with the accompanying notes
19
Interim Financial Report for the half-year ended 31 December 2024
Condensed Statement of Changes in Equity for the half-year ended 31
December 2024
Share based
payment
Accumulated
reserve
losses
$
$
Issued
capital
$
Balance at 1 July 2023
Total
equity
$
29,715,384
1,220,130
(26,860,245)
4,075,269
Loss after income tax expense for the half-year
Other comprehensive income for the half-year, net of tax
-
-
(2,088,883)
-
(2,088,883)
-
Total comprehensive loss for the half-year
-
-
(2,088,883)
(2,088,883)
Transactions with owners in their capacity as owners:
Share-based payments
Issued capital
Transaction costs
4,000,000
(443,208)
178,726
-
-
178,726
4,000,000
(443,208)
Balance at 31 December 2023
33,272,176
1,398,856
(28,949,128)
5,721,904
Share based
payment
Accumulated
reserve
losses
Total equity
$
$
$
Issued
capital
$
Balance at 1 July 2024
35,743,130
1,470,186
(32,107,362)
5,105,954
Loss after income tax expense for the half-year
Other comprehensive income for the half-year, net of tax
-
-
(3,255,669)
-
(3,255,669)
-
Total comprehensive loss for the half-year
-
-
(3,255,669)
(3,255,669)
Transactions with owners in their capacity as owners:
Share-based payments (note 10)
Options exercised and shares placed
Transaction costs
Transfer between classes of equity (note 10)
7,581,738
(365,332)
-
101,917
(53,629)
(885,508)
885,508
101,917
7,528,109
(365,332)
-
Balance at 31 December 2024
42,959,536
632,966
(34,477,523)
9,114,979
The above statement of changes in equity should be read in conjunction with the accompanying notes
20
Interim Financial Report for the half-year ended 31 December 2024
Condensed Statement of Cash Flows for the half-year ended 31
December 2024
Note
31 Dec 2024 31 Dec 2023
$
$
Cash flows from operating activities
Payments to suppliers and employees (inclusive of GST)
Payments for exploration
Interest component of lease payments
Interest received
Interest paid
(396,178)
(2,844,420)
(574)
91,747
(1,786)
(320,930)
(1,851,810)
(2,496)
48,830
-
Net cash used in operating activities
(3,151,211)
(2,126,406)
Cash flows from investing activities
Payments for property, plant and equipment
Payment to acquire tenements
(12,540)
(5,000)
(7,766)
-
Net cash used in investing activities
(17,540)
(7,766)
1,994,822
5,533,288
(327,791)
(9,339)
(16,910)
4,000,000
(309,139)
(17,154)
-
Net cash provided by financing activities
7,174,070
3,673,707
Net increase in cash and cash equivalents
Cash and cash equivalents at the beginning of the financial half-year
4,005,319
5,828,509
1,539,535
4,217,239
Cash and cash equivalents at the end of the financial half-year
9,833,828
5,756,774
Cash flows from financing activities
Proceeds from issue of shares
Proceeds from the exercise of options
Share issue transaction costs
Repayment of lease liabilities
Repayment of insurance funding
10
The above statement of cash flows should be read in conjunction with the accompanying notes
21
Interim Financial Report for the half-year ended 31 December 2024
Notes to the Interim Financial Statements for the half-year ended 31
December 2024
Note 1. General information
The condensed interim financial statements cover Yandal Resources Limited as a Company for the period ended
31 December 2024. The financial statements are presented in Australian dollars, which is Yandal Resources Limited 's
functional and presentation currency. The Company is a for-profit listed entity domiciled in Australia.
A description of the nature of the Company's operations and its principal activities are included in the Directors'
report, which is not part of the financial statements.
The interim financial statements were authorised for issue, in accordance with a resolution of Directors, on 11 March
2025.
Note 2. Material accounting policies
The principal accounting policies adopted in the preparation of the interim financial statements are set out either
in the respective notes or below. These policies have been consistently applied to all the years presented, unless
otherwise stated.
New or amended Accounting Standards and Interpretations adopted
The Company has adopted all of the new or amended Accounting Standards and Interpretations issued by the
Australian Accounting Standards Board ('AASB') that are mandatory for the current reporting period. No material
change to accounting policies was required.
Any new or amended Accounting Standards or Interpretations that are not yet mandatory have not been early
adopted and are not expected to have a material impact on the accounting policies of the Group.
Going concern
The interim financial report has been prepared on the going concern basis, which contemplates the continuity of
normal business activity and the realisation of assets and the settlement of liabilities in the ordinary course of
business.
Basis of preparation
This interim consolidated financial report is a condensed general-purpose financial report prepared in accordance
with the requirements of the Corporations Act 2001 and Australian Accounting Standard AASB 134: Interim Financial
Reporting. Compliance with AASB 134 ensures compliance with International Financial Reporting Standard IAS 34
Interim Financial Reporting.
The interim financial report does not include all of the notes of the type normally included within the annual financial
report and therefore cannot be expected to provide as full an understanding of the financial performance,
financial position and financing and investing activities of the consolidated entity as the full financial report.
It is recommended that this financial report be read in conjunction with the 30 June 2024 Annual Report of the
Company and any public announcements made by Yandal Resources Limited and its controlled entities during
the half-year in accordance with the continuous disclosure requirements arising under the Corporations Act
2001. For the purpose of preparing the interim financial report, the half-year has been treated as a discrete
reporting period.
The principal accounting polici
Share your feedback
Discover