June 2025 - QUARTERLY ACTIVITIES REPORT
KEY POINTS
Caladan
•
Results from early Arrakis RC drilling completed in the previous March Quarter were
received, including:
o
11m @ 0.5 g/t Au from 168m in 25AKSL003
o
5m @ 1.3 g/t Au from 243m in 25IWBRC0037
•
The RC drilling results indicated gold mineralisation is sub-vertical and occurs on the
boundaries of an approximately 30m wide shear-zone cross-cutting a dolerite unit.
•
A large-scale air-core program commenced across the Caladan target area in early
June, including ten broad spaced lines testing 6.4km of strike.
•
Initial air-core results received subsequent to the Quarters end included:
o
11m @ 2.1 g/t Au from 90m in 25IWBAC023, including
7m @ 3.1 g/t Au from 92m.
o
12m @ 1.1g/t Au from 45m in 25IWBAC032,
o
12m @ 0.5g/t from 70m to EOH in 25IWBAC032,
•
Results suggest a mineralised structure at Arrakis strikes over more than 800m and is open
to the northwest and southeast.
•
76 air-core holes for 7,730m were completed during the Quarter. The Air-core program
was completed after the Quarter end, totalling 132 holes for 13,458m.
New England Granite
•
Diamond drilling results from Siona were received during the Quarter and demonstrate
broad, low-grade mineralisation with internal higher-grade zones characterising the
Siona mineralised system.
•
Several large-scale structural targets were defined following the integration of
geological observation from diamond drilling and ground gravity surveys.
•
Air-core drilling has commenced across the New England Granite, testing new
structural targets.
For further information or to ask questions in relation to this announcement, please visit our
Investor Hub at https://investorhub.yandalresources.com.au/link/yVw2Oe
Contact Us
A: Suite 1, Level 3, 1138 Hay Street,
West Perth WA 6005
T: +61 (0)8 9389 9021
E: yandal@yandalresources.com.au
yandalresources.com.au | ASX: YRL
Board and Management
Chris Oorschot
Managing Director/CEO
Greg Evans
Non-Executive Chair
Katina Law
Non-Executive Director
Greg Fitzgerald
Company Secretary
Corporate
•
Approx. $4.76m in cash and cash equivalents available at the end of the
Quarter.
•
KPMG Corporate Finance continue to advise on and manage the potential
divestment of the non-core Mt McClure and Gordons Gold Projects.
Yandal Resources Ltd (ASX: YRL, “Yandal Resources” or the “Company”) is pleased to provide a
summary of operational and corporate activities undertaken during the Quarter ended 30 June
2025.
The Company remains focused on exploring its portfolio of highly prospective 100% owned gold
projects located in the Yandal Greenstone Belt in Western Australia (Figure 1).
Figure 1: Yandal Resources’ gold project locations.
June Quarter Operational Summary and 2025 Outlook
The June 2025 Quarter was very productive for the Company, with a focus on preparing for earlystage air-core drilling at Caladan and analysing a significant body of exploration data from the
recent Siona gold discovery. Exploration efforts focused on rapidly progressing large-scale,
earlier-stage exploration targets within the Ironstone Well–Barwidgee Gold Project (IWB) in the
northern Yandal Greenstone Belt of Western Australia.
Across the New England Granite target area, the Quarter saw the receipt of diamond drilling
results from Siona and the interpretation of recently acquired ground gravity data from across
the broader target area. Geological observations and interpretations from both allowed the
discrimination of several large-scale structural targets across the New England Granite target
area.
yandalresources.com.au | ASX:YRL
2
At the Caladan target area, the 12,500m air-core program testing the Caladan fold structure
over 6.4km commenced, with early results received post the Quarters end suggesting discovery
potential.
Looking ahead, the Company will continue to aggressively advance exploration across both the
New England Granite and Caladan target areas as it seeks to realise new large-scale gold
discoveries within the Yandal Greenstone Belt.
IRONSTONE
BARWIDGEE
WELL-
The 100% owned IWB
Gold
Project
covers
approximately 370km² of
highly prospective and
under-explored
tenure
located between the
Jundee and Bronzewing
mines in the northern
Yandal Greenstone Belt
(Figure 2).
Yandal
has
an
established Resource of
268,000oz of gold at
Flushing Meadows and
considers there to be
strong potential to make
new discoveries and
expand this resource
base within its’ extensive
tenure holding. (Refer to the
Oblique
Caladan
Target Area
Quarter
Moon
Arrakis
Flushing Meadows
(268Koz)
Irulan Dolerite
Complex
Siona
New England
Granite
Salusa
ASX announcement of 4 November
2020 for details of the Flushing Meadows
Resource)
The project area includes Figure 2: Simplified geology plan across the IWB Gold Project showing
several priority early- active prospects and exploration target areas, including the Siona
and Arrakis Prospects.
stage prospects, where
analysis completed by the YRL exploration team has delineated new targets. It also includes
several advanced prospects, where limited historic and YRL drilling has returned robust gold
intercepts, indicating the potential for large-scale discoveries. Both the early-stage
and more advanced prospects are the focus of ongoing exploration.
These prospects include the recent Siona discovery hosted within the New England Granite,
located towards the southern end of the project, and two earlier-stage but large-scale and
yandalresources.com.au | ASX:YRL
3
highly prospective target areas, Irulan and Caladan, located in the central portion of the
project.
New England Granite
The New England Granite target area (see Figure 2) comprises a 4.2km long, 2km wide
granitoid, covered by 6-20m of transported cover that exhibits strong regolith gold
anomalism in shallow historical drilling proximal to the eastern contact (Figure 3). During
October 2024, the Siona discovery was made (see ASX release 21 October 2024),
demonstrating the capacity for the large intrusive body to host significant mineralisation.
Since the discovery, the Company has focused on understanding the scale of the Siona
Discovery and targeting similar positions across the expansive host.
Siona Diamond Drilling
All assay results from diamond drilling across the Siona discovery within the New England Granite
(NEG) target area were reported during the Quarter. Four new diamond holes and two diamond
tails were drilled across Siona (see Figure 3), with significant results including:
o
16.3m @ 0.5 g/t Au from 322.2m in 25IWBRD0003
o
29.1m @ 0.4g/t Au from 282.9m in 25IWBRD0010
o
6.4m @ 1.5 g/t Au from 103.5m in 25IWBDD0009, including
•
0.3m @ 3.6g/t Au from 105.8m
•
0.4m @ 12.7g/t Au from 108.3m
•
0.4m @ 6.2g/t Au from 109.5m
The diamond drilling results confirmed wide, low-grade mineralisation continuity at depth.
Geological analysis suggests continuous higher-grade mineralisation occurs within the broader
low-grade mineralisation, with the plunge direction controlled through the interaction of the
deformed intrusive margin and oblique cross-cutting shear zones.
yandalresources.com.au | ASX:YRL
4
Refining Structural Targets
The completion of diamond drilling has allowed a detailed set of geological observations to be
made and analysed. The most significant observation made by Yandal Resources is that
mineralisation develops wherever deformation occurs, both proximal and distal to the host
intrusive margin. This observation has been reinforced by the recently completed RC exploration
drilling program at the Salusa Prospect on the southeast corner of the New England Granite (see
ASX release 15 April 2025), including:
o
2m @ 9.4g/t Au from 33m in 25IWBRC0019, and
o
14m @ 0.8g/t Au from 82m in 25IWBRC0019
The geological observations highlights the suitability of the granodiorite in acting as a host for
gold mineralisation. It allows the development of a simple set of targeting criteria to prioritise
structural targets derived from geophysics. With the receipt of all diamond drilling results, the
targeting criteria for the New England Granite have been revised to include:
-
Targeting structures that interact with the intrusive margin with observable offsets (lateral or
vertical);
-
Prioritise northwest-trending features and northeast-striking conjugate structures of a similar
relative age within the intrusive away from the intrusive margin;
-
Prioritise structures that are oblique to the granodiorite margin.
In addition to the above, the concept of gold mineralisation occurring deep into the intrusive
away from the intrusive contact is yet to be adequately tested. Figure 4 shows the priority
structural targets that will be the focus of air-core drilling in 2025.
yandalresources.com.au | ASX:YRL
5
24IWBRC0051
24IWBRC0051
25IWBRD0008
24IWBRC0049
24IWBRC0044
24IWBRC0052
25IWBRD0010
24IWBRC0047
25IWBRD0003
25IWBDD0009
24IWBRD0039
24IWBRC0050
25IWBRC0011
24IWBRC0048
24IWBRC0054
24IWBRC0055
24IWBRC0046
YRLRC1154
24IWBRC0057
24IWBRD0056
24IWBRC0038
YRLRC1153
24YRLEIS0002
Figure 3: The collar plan shows all RC and diamond drilling completed across Siona with
individual down-hole assays plotted on the drill string. A surface projection of the intrusive
contact and major structures is also plotted. The planes of sections A and B are also shown.
yandalresources.com.au | ASX:YRL
6
Figure 4: Plan showing processed infill ground gravity dataset (BA267 1VD northwest
shade linear colour scale) across the New England Granite area. The plan includes
the updated interpretation of the intrusive margin and a preliminary interpretation of
structures interacting with the intrusion. Broad structural targets include Salusa and
NEG01-NEG04.
yandalresources.com.au | ASX:YRL
7
Caladan Target Area
In June 2024, a series of new high-priority targets were identified based on detailed gravity
data collected by Yandal and a comprehensive analysis of open-file data. Most notable
was the identification of the Caladan target area (see Figure 2), which shows broad
similarities to several world-class gold camps (see ASX Release 11 June 2024), including:
•
The interpreted Caladan Fold displays similarities to the broader structural setting of
the Boomerang Anticline that hosts the Golden Mile Deposit and;
•
The folded mafic sequence of the Timmins-Porcupine gold district in Canada.
Across the Caladan target area, several low-level in-situ saprolite anomalies were
identified within shallow historical drilling, including a continuous 3km long northwest
striking anomaly within the core of the interpreted Caladan Fold designated CAL-01 (now
designated as the Arrakis Prospect, see Figure 5). Significantly, this broad-spaced drilling
was shallow and only tested upper saprolite clays, a portion of the regolith profile prone
to gold depletion across the Yandal Greenstone Belt. This underscores the attractive
interpreted structural setting and untested nature of this large target area, emphasising
the need for more effective exploration.
A single line of air-core drilling was completed across the core of the Caladan target
area, testing the central part of the CAL-01 anomaly in October 2024 with follow up RC
drilling completed in the March Quarter of 2025.
Caladan RC Results
In April, assay results from a small RC drilling program across the Arrakis Prospect within the
Caladan target area were reported. Four RC holes (700m total) were drilled within a single line
that transects the core of the Caladan Fold (see Figures 6 and 7). Significant intercepts include:
o
11m @ 0.5 g/t Au from 168m in 25AKSL003
o
Including 3m @ 1.2 g/t Au from 174m
5m @ 1.3 g/t Au from 243m in 25IWBRC0037*1
Including 2m @ 2.7 g/t Au from 246m
*1 RC hole 25IWBRC0037 only partially tested the targeted shear zone.
Several new structures were also identified in the depleted upper regolith, including:
o
9m @ 0.4 g/t Au from 54m in 25IWBRC0037
o
Including 1m @ 1.8 g/t Au from 61m
8m @ 0.4g/t Au from 105m in 25IWBRC0037
yandalresources.com.au | ASX:YRL
8
The deeper RC drilling results confirmed mineralisation continuity into fresh rock and a subvertical geometry. Results also highlight the potential for multiple mineralised structures within the
interpreted mafic host. Mineralisation is open at depth and remains untested along strike. These
results paved the way for the larger-scale 12,500m air-core program across the Caladan target
area that commenced in June.
Caladan Air-Core Drilling
In early June, the large-scale Caladan AC program commenced. The program saw drilling
completed across ten lines, with a total of 132 holes for 13,458m of drilling completed subsequent
to the quarter end. The aircore program tested a significant expanse of Caladan target area,
including 6.4km of strike (See Figure 5).
Results from the first sixteen air-core holes (1,685m) were reported in early July. The first round of
AC results delivered several significant intercepts (see ASX release 10 July 2025):
o 11m @ 2.1 g/t Au from 90m in 25IWBAC023, including
7m @ 3.1 g/t Au from 92m.
o 12m @ 1.1g/t Au from 45m in 25IWBAC032, including
2m @ 3.2g/t Au from 45m and,
1m @ 2.5g/t Au from 53m.
o 12m @ 0.5g/t from 70m to EOH in 25IWBAC032, including
1m @ 2.0g/t Au from 74m.
These early results demonstrate that the mineralised structure intercepted in AC drilling
completed in late 2024 (see ASX release 15 January 2025 & Figure 6) is potentially continuous
along more than 800m of strike and remains open to the northwest and southeast, see Figures 7,
8, and 9. Across all three lines, mineralisation is hosted within sheared and altered dolerite. These
first results, when combined with geological observations, provide strong evidence that the 3km
long, low-level regolith anomaly that defined the Arrakis Prospect (see ASX release 15 July 2024)
reflects a primary mineralised structure at depth. Importantly, AC drilling has already tested the
full extent of this regolith anomaly, with results anticipated over the coming weeks and months.
yandalresources.com.au | ASX:YRL
9
Arrakis
Prospect
25IWBAC023
11m @ 2.1g/t Au Incl.
7m @ 3.1g/t Au
12m @ 1.1 g/t Au &
12m @ 0.5 g/t Au to EOH
Figure 5: A collar plan over the Caladan target area, showing simplified bedrock geology
interpretation across the Caladan and northern Irulan target areas within the IWB Gold
Project. The collars of YRL drilling, the historic 1995 RAB drilling, and all historic drilling >20m in
depth are plotted. All collars are thematically coloured by max Au (g/t Au). Please note that
collars coloured black represent holes that have been drilled with assays yet to be received.
yandalresources.com.au | ASX:YRL
10
25IWBAC023
11m @ 2.1g/t Au Incl.
7m @ 3.1g/t Au
3 km Long
Arrakis
Regolith Au
Anomaly
24IWBAC063
11m @ 1.7g/t to EOH
25IWBAC032
12m @ 1.1 g/t Au &
12m @ 0.5 g/t Au to EOH
Mafic Dolerite
Figure 6: A collar plan over the Arrakis Prospect within the Caladan target area), showing
simplified bedrock geology interpretation. The location of effective historic drilling (>20m depth
and excluding all Eagle Mining and Hunter Resources RAB drilling from 1995)and all Yandal
drilling is plotted. Collars are thematically coloured by max Au (g/t) in the hole. Please note
that collars coloured black represent holes that have been drilled with assays yet to be
received.
yandalresources.com.au | ASX:YRL
11
Arrakis Cross-Section A
northwest facing
Surface
Transported Cover
BOCO
9m @ 0.4 g/t Au
3m @ 0.2 g/t Au
8m @ 0.4 g/t Au
TOFR
11m @ 1.7 g/t Au to EOH
incl. 3m @ 3.5 g/t Au
Target
Target
11m @ 0.5 g/t Au
Incl. 3m @ 1.2g/t Au
Dolerite
5m @ 1.3 g/t Au
Incl. 2m @ 2.7g/t Au
Intermediate
Figure 7: Cross-section showing all drilling results from Arrakis with a simple preliminary interpretation
of geology. The section location is shown in Figure 6. The cross-section shows all drilling +/-50m away
from the section plane.
yandalresources.com.au | ASX:YRL
12
Arrakis Cross-Section B
northwest facing
Surface
Transported Cover
BOCO
Results
Pending
Results
Pending
?
11m @ 2.1 g/t Au
incl. 7m @ 3.1 g/t Au
Future target - Parallel
mineralisation
Dolerite
?
Figure 8: Cross-section showing all AC drilling results from 25IWBAC023, with a simple preliminary
interpretation of geology. The section location is shown in Figure 6. The section shows all drilling
within +/- 50m of the section plane. The red line represents a potential future drill target, based
on geological observation from intercepts 400m and 800m to the southeast. Please note that
assay results from drilling adjacent to 25IWBAC023 have not yet been received and are
expected in the coming weeks.
yandalresources.com.au | ASX:YRL
13
Arrakis Cross-Section C
northwest facing
Surface
Transported Cover
12m @ 1.1 g/t Au incl.
2m @ 3.2 g/t Au &
1m @ 2.5 g/t Au
Results
Pending
Results
Pending
12m @ 0.5 g/t Au to EOH
incl. 1m @ 2.0 g/t Au
Dolerite
Intermediate
Figure 9: Cross-section showing all AC drilling results from 25IWBAC032, with a simple preliminary
interpretation of geology. The section location is shown in Figure 6. The section shows all drilling
within +/- 50m of the section plane. Please note that assay results from drilling adjacent to
25IWBAC023 have not yet been received and are expected in the coming weeks.
Mt McClure
The Mt McClure Project is located 15km south-west of the historic Bronzewing gold mine
and 10km from the Orelia gold mine (see Figure 10) , both owned by Northern Star
Resources Ltd (ASX: NST) in the southern Yandal Greenstone Belt (see Figure 1). The project
covers a total strike length of 17km of prospective stratigraphy and includes several shallow
historical open-cut pits.
The Mt McClure Mineral Resource Inventory is 182,200oz @ 1.7 g/t Au, all located on granted
mining leases.
The project has prospectivity for new shallow gold deposits adjacent to current Resources
and in the footwall and hanging wall of the stratigraphy. The Company intends to complete
targeting and target testing in 2025.
yandalresources.com.au | ASX:YRL
14
Figure 10: Mt McClure tenement plan showing the location of major prospects,
interpreted bedrock lithology, major structures and proximity to nearby mines.
GORDONS
The Gordons Project is located 30km north of Kalgoorlie and 15km north of the Kanowna
Belle Gold Mine (ASX: NST), close to processing and haulage infrastructure (Figure 1).
The Project tenements straddle the eastern flank of the Scoti-Kanowna Dome, a geological
feature that is a regional control on mineralisation, including the multi-million ounce
Kanowna Belle and Paddington gold mines.
yandalresources.com.au | ASX:YRL
15
In mid-2023, the Company acquired exploration licence E27/701 (in application) abutting
the southern boundary of the project. This acquisition was in response to a 3D structural study
that interpreted an important structural corridor (the Gordon Sirdar Shear Zone or “GSSZ”)
passing through the eastern portion of Yandal’s tenure, beyond which it extended south in
close proximity to the Gordon Sirdar Mine and then through E27/701.
LOOKING AHEAD
The Company has a very active September Quarter scheduled. Notable near-term
activities and news flow include;
1.
Further AC drilling results from Caladan are anticipated in the coming weeks and
months;
2.
An AC drilling program across the New England Granite has commenced with results
anticipated in 6-10 weeks;
3.
RC drilling to follow up recent air-core drilling results is being scheduled for August.
CORPORATE SUMMARY
Strategic Review of Non-core Assets
As advised in the previous quarterly report, Yandal Resources has engaged KPMG Corporate
Finance to advise on and manage the potential divestment of the Gordons Gold Project
and the Mt McClure Gold Project, which are non-core assets. This process is ongoing and
further updates will be provided as and when needed.
Issued Capital
There were no movements in securities on issue during the quarter other than the lapsing of
1,300,000 employee options.
The securities on issue at the start and end of the quarter are summarised in the table below.
Type of Security
31 March 2025
Movement in
June Qtr
30 June 2025
Ordinary shares
309,234,982
-
309,234,982
Options 11c 17/11/25 expiry
23,888,703
-
23,888,703
Options - other
TOTAL
15,500,000
348,623,685
(1,300,000)
(1,300,000)
14,200,000
347,323,685
yandalresources.com.au | ASX:YRL
16
Resignation of Director
During the quarter, Mr. Timothy Kennedy, a long serving Board and Executive member,
tendered his resignation as an independent non-executive Director of the Board effective 2
May 2025 to pursue other interests.
Summary of Exploration Expenditure
In accordance with Listing Rule 5.3.1, Yandal confirms that as disclosed in the Cashflow
Report (item 1.2(a)), Yandal’s exploration expenditure for the quarter was approximately
$2,192k, details of the exploration activities underlying this expenditure are as set out in the
Activities Report.
Payments to Related Parties and their Associates
In accordance with ASX Listing Rule 5.3.5, $115k was paid to related parties or their associates
during the quarter, comprising Executive Director salaries, Non-executive Director fees and
superannuation.
Authorised by the board of Yandal Resources
For further information, please contact:
Chris Oorschot
Managing Director
Yandal Resources Limited
yandal@yandalresources.com.au
About Yandal Resources Limited
yandalresources.com.au | ASX:YRL
Greg Fitzgerald
Company Secretary
+61 8 9389 9021
yandal@yandalresources.com.au
17
About Yandal Resources Limited
Yandal Resources Limited (ASX: YRL) is an ASX-listed gold explorer company which has a portfolio of
advanced gold exploration projects in the highly prospective Yandal and Norseman-Wiluna Greenstone
Belts of Western Australia. These Gold Projects include the Gordons, Mt McClure and Ironstone WellBarwidgee.
Table 1: Yandal Resources Ltd - Mineral Resource Summary
Indicated
Inferred
Deposit
Tonnes Grade
Au
Tonnes
Grade
Au
(‘000s)
(g/t)
(oz)
(‘000)
(g/t)
(oz)
Ironstone Well
Flushing Meadows1
2,141
1.3
91,000
5,245
1.1
177,000
Mt McClure
Challenger2
718
1.9
44,000
Success3
1,255
1.9
75,000
4
Parmelia
252
2.1
17,000
HMS Sulphur5
1010
1.2
39,000
6
Gilmore
134
1.7
7,200
Sub-total - MMC
3,369
1.7
182,200
Gordons
Gordons Dam7
365
1.7
20,000
2,141
Grand-total8
1.3
91,000
8,979
1.3
379,200
Total
Tonnes
(000’s)
Grade
(g/t)
Au
(Oz)
7,386
1.1
268,000
718
1.9
44,000
1,255
1.9
75,000
252
2.1
17,000
1010
1.2
39,000
134
1.7
7,200
3,369
1.7
182,200
365
1.7
20,000
11,120
1.4
470,200
Due to the effects of rounding, totals may not represent the sum of the individual
components.
1. Reported above 0.5g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 4 November
2020 for full details. 2. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement
dated 22 August 2022 for full details 3. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX
announcement dated 6 September 2022 for full details.4. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal
Resources Ltd ASX announcement dated 20 September 2022 for full details 5. Reported above 0.5g/t Au lower cut-off
grade within this announcement 6. Reported above 1.0g/t Au lower cut-off grade within this announcement 7. Reported
above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 6 April 2023 for full details
8. All Resources are reported as global estimates, not constrained by optimised pit shells.
Competent Person Statement
The information in this document related to Exploration Targets and Exploration Results, geology
and data compilation is based on information reviewed or compiled by Mr Christopher Oorschot,
a Competent Person who is a Member of The Australasian Institute Geoscientists. Mr Oorschot is
the Managing Director for the Company, is a full-time employee and holds shares and options in
the Company. Mr Oorschot has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Oorschot
consents to the inclusion in this announcement of the matters based on this information in the
form and context in which it appears.
The information in this announcement that relates to the Flushing Meadows, Mt McClure and
Gordons Dam Mineral Resource Estimates is based on information compiled and generated by
Andrew Bewsher, an employee of BM Geological Services Pty Ltd (“BMGS”). Both Andrew
Bewsher and BMGS hold shares in the company. BMGS consents to the inclusion, form and
context of the relevant information herein as derived from the original resource reports. Mr
yandalresources.com.au | ASX:YRL
18
Bewsher has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration and to the activity which is being undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the JORC ‘Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves’.
YRL confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcement. The Company confirms that the form
and context in which the Competent Person’s findings are presented have not been materially
modified from the original market announcement.
Forward Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements
include, but are not limited to, statements concerning Yandal Resources Limited’s (Yandal’s)
current expectations, estimates and projections about the industry in which Yandal operates,
and beliefs and assumptions regarding Yandal’s future performance. When used in this
document, words such as “anticipate”, “could”, “plan”, “estimate”, “expects”, “seeks”,
“intends”, “may”, “potential”, “should”, and similar expressions are forward-looking statements.
Although Yandal believes that its expectations reflected in these forward-looking statements are
reasonable, such statements are subject to known and unknown risks, uncertainties and other
factors, some of which are beyond the control of Yandal and no assurance can be given that
actual results will be consistent with these forward-looking statements. Drilling results presented
indicate geological potential for mineralisation but there can be no certainty that these results
will eventually form part of a Mineral Resource Estimate.
yandalresources.com.au | ASX:YRL
19
Tenement Schedule as at 30 June 2025
Locality
Interest
acquired
during
the
Quarter
Interest
disposed
during the
Quarter
Tenement ID
Status
Holder
Ownership
at Quarter
End
E53/1882
Granted
Yandal
100%
-
-
Notes
Ironstone Well Gold Project
Oblique/Quarter Moon
Flushing Meadows
E53/1963
Granted
Yandal
100%
-
Wiluna
E53/2191
Granted
Legendre
100%
-
-
Wiluna
E53/2192
Granted
Legendre
100%
-
-
Wiluna
ELA53/2193
Application
Legendre
100%
-
-
1
Wiluna
ELA53/2194
Application
Legendre
100%
-
-
1
Flushing Meadows Haul Rd
LA53/222
Application
Yandal
100%
-
-
Ironstone Well
M53/1093
Granted
Yandal
100%
-
-
Ironstone Well
ELA53/2334
Application
Yandal
100%
-
-
Flushing Meadows
MLA53/1108
Application
Yandal
100%
-
-
Newcombe
E53/2304
Granted
Yandal
100%
-
-
Pinaldi
ELA53/2239
Application
Odette Two
100%
-
-
New England
E53/1843
Granted
Yandal
100%
-
-
Mazzucco
P53/1704
Granted
Yandal
100%
-
-
Greenstone Hill
P53/1714
Granted
Yandal
100%
-
-
Greenstone Hill
P53/1715
Granted
Yandal
100%
-
-
Leela
E 53/2364
Application
Yandal
100%
-
-
Success
M36/691
Granted
Yandal
100%
-
-
Parmelia
M36/692
Granted
Yandal
100%
-
-
Challenger
M36/693
Granted
Yandal
100%
-
-
Mt McClure
P36/1892
Granted
Yandal
100%
-
-
Mt McClure
P36/1893
Granted
Yandal
100%
-
-
Mt McClure
P36/1894
Granted
Yandal
100%
-
-
Mt McClure
P36/1895
Granted
Yandal
100%
-
-
Mt McClure
P36/1896
Granted
Yandal
100%
-
-
Success
P36/1922
Granted
Yandal
100%
-
-
Mt McClure
P36/1934
Granted
Yandal
100%
-
-
Mt McClure
P36/1935
Granted
Yandal
100%
-
-
Mt McClure
P36/1936
Granted
Yandal
100%
-
-
Mt McClure
P36/1937
Granted
Yandal
100%
-
-
Mt McClure
P36/1938
Granted
Yandal
100%
-
-
Mt McClure
P36/1939
Granted
Yandal
100%
-
-
Mt McClure
P36/1940
Granted
Yandal
100%
-
-
Mt McClure
P36/1941
Granted
Yandal
100%
-
-
Mt McClure
P36/1942
Granted
Yandal
100%
-
-
Mt McClure
P36/1943
Granted
Yandal
100%
-
-
Mt McClure
P36/1944
Granted
Yandal
100%
-
-
Mt McClure
P36/1945
Granted
Yandal
100%
-
-
Mt McClure
P36/1946
Granted
Yandal
100%
-
-
4
Barwidgee Gold Project
Mt McClure Gold Project
Gordons Gold Project
yandalresources.com.au | ASX:YRL
20
Tenement Schedule as at 30 June 2025
Interest
acquired
during
the
Quarter
Interest
disposed
during the
Quarter
Tenement ID
Status
Holder
Ownership
at Quarter
End
Mt Jewell
E24/198
Granted
Yandal
100%
-
-
Mt Jewell
E27/536
Granted
Yandal
100%
-
-
Mt Jewell
P27/2206
Granted
Yandal
100%
-
-
Mt Jewel
MLA27/518
Application
Yandal
100%
-
-
Mulgarrie
E27/570
Granted
Yandal
100%
-
-
Gordons
E27/601
Granted
Yandal
100%
-
-
Locality
Wild Dog
E27/602
Granted
Yandal
100%
-
-
Gordons
LA27/100
Application
Yandal
100%
-
-
Gordons
LA27/101
Application
Yandal
100%
-
-
Gordons
M27/11
Granted
Yandal
100%
-
-
Mulgarrie
M27/237
Gra