Oblique Diamond Drilling Results
Released
Released
Announcement PDF
ASX Announcement
3 September 2024
Exploration Update
Oblique Diamond Drilling Results
•
Diamond drilling results from the five diamond holes completed across the
Oblique Prospect have been received.
•
Results demonstrate the OBL-01 structure as a host of broad low-grade
mineralisation within fresh rock beneath supergene-enriched oxide and transition
zone.
•
The Exploration Target for the Oblique Prospect has been revised, focusing on
oxide mineralisation potential.
•
Shallow oxide and transitional mineralisation remain of interest going forward due
to the prospect's close proximity to the 268 Koz Flushing Meadows Mineral
Resource 5km to the south.
Caladan & Irulan Targets
•
Access approval for initial AC drilling across the large-scale Caladan and Irulan
targets has been received.
•
Initial AC drill line clearing across the Caladan and Irulan targets will commence
this week, with drilling scheduled for October 2024.
Next Steps
•
The first results from the New England Granite diamond drilling are due soon, and
preparations for follow-up are in progress.
•
Results for the recently completed diamond drilling at Quarter Moon are
expected during September.
For further information or to ask questions concerning this announcement, please visit our
Investor Hub at https://investorhub.yandalresources.com.au/link/7PRv5P
Contact Us
A: Level 1 Unit 5/62 Ord Street,
West Perth WA 6005
T: +61 (0)8 9389 9021
E: yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL
Board and Management
Chris Oorschot
Managing Director/CEO
Greg Evans
Non-Exec Chair
Katina Law
Non-Exec Director
Tim Kennedy
Executive Director
Greg Fitzgerald
Company Secretary
Commenting on the new target areas, Yandal Resources’ Managing Director, Mr. Chris Oorschot,
said: “The diamond drilling program across Oblique has provided the exploration team with
invaluable insights into the structures and stratigraphy that control the broad mineralised system.
These learnings can be widely applied to refine our targeting models across the Project.
Based on the diamond drilling results, we have revised the Exploration Target for the Oblique
Prospect to focus on shallow oxide mineralisation. Given the prospect's proximity to the
predominantly oxide 268 Koz Flushing Meadows Deposit, there is value in pursuing oxide and
transitional mineralisation at Oblique, and we will look to test this position further within the next six
to twelve months.”
Yandal Resources Ltd (ASX: YRL, “Yandal Resources” or the “Company”) is pleased to advise
that assay results from the framework diamond drilling program across the Oblique Prospect
(E53/1882) have been received. The Oblique Prospect is part of the Ironstone Well-Barwidgee
(IWB) Gold Project within the Yandal Greenstone belt and is located 50km south of the Jundee
Mining Centre currently operated by Northern Star Resources (ASX: NST), see Figure 1.
Oblique Diamond Drilling Results
Results have been received for the five-hole, 2,050m diamond drilling program at the Oblique
Prospect (see Figures 1 and 2). The program included 520m of RC pre-collar drilling and 1,530m
of diamond drilling (see Tables 3 & 4). Previous RC drilling completed by the Company and
historic explorers has identified extensive oxide and transitional mineralisation across the
Prospect. The 2024 diamond drilling program was designed to test for mineralisation continuity
within fresh rock across a strike length of 900m and down to a maximum vertical depth of 420m.
Laboratory results indicate broad zones of lower-grade mineralisation within fresh rock beneath
the previously identified higher-grade oxide mineralisation; notable intercepts include:
•
26.5m @ 0.6g/t Au from 183.5m in 24IWBRD0013 (see Figure 3)
•
6.3m @ 0.5g/t Au from 284.0m in 24IWBRD0009
•
7.2m @ 0.7g/t Au from 331.9m in 24IWBRD0009
•
0.2 @ 8.7g/t Au from 228.1m in 24IWBRD0014
Results combined with geological observations suggest low-level gold mineralisation at depth
within the OBL-01 structure (see Figure 3). Numerous sub-vertical shear zones that host low-level
gold anomalism have been observed in all diamond holes. Based on these results and
geological observations from the diamond core, the Exploration Target for the Oblique Prospect
has been revised (see Appendix 1).
Despite only low-grade mineralisation being identified within fresh rock, the Company still sees
potential for oxide and transitional gold mineralisation across the Oblique Prospect. Oblique is
yandalresources.com.au | ASX:YRL
2
only 5km north of the Company’s 268 Koz Flushing Meadows deposit (see Table 2), and any
shallow oxide mineralisation at Oblique would complement the existing Mineral Resources at
Flushing Meadows. Yandal will review the oxide potential with a view to follow-up drilling to test
the target potential.
Figure 1: A simplified geology plan across the IWB Gold Project shows active prospects and
exploration target areas.
yandalresources.com.au | ASX:YRL
3
Figure 2: A Collar plan for the Oblique Prospect displaying all drilling collars, colour-coded by
max Au in hole (g/t Au), overlying a composite aerial magnetic image e (RTP 1VD non-linear
and RTP 2VD non-linear). Diamond pre-collars and section positions are labelled.
yandalresources.com.au | ASX:YRL
4
Figure 3: Oblique cross section showing diamond drilling results from the recently completed
diamond hole 24IWBRD0013 and interpretation of mineralisation. See Figure 1 for section
location.
yandalresources.com.au | ASX:YRL
5
Caladan and Irulan AC Drilling
Access approvals for initial AC drilling across the early-stage Caladan and Irulan target areas,
Figure 4, have been received. This includes 800m spaced lines across the Irulan Dolerite
Complex and a single line across the Caladan Fold structure.
Additional heritage clearance surveys are being scheduled to clear an additional nine 800metre spaced AC lines across the Caladan Fold target area. In addition, a regional soil sampling
program has commenced over the Caladan Fold.
The Caladan target area presents a large-scale northwest plunging (interpreted) fold, truncated
by the Idaho Shear and interpreted as a second-order structure linking the Ockerbury Shear
Zone to the east and the Barwidgee Shear Zone to the west. The only systematic drilling across
the fold structure was completed in 1995 (see ASX 15 July 2024), where shallow vertical RAB
holes on a 400m by 400m spacing were completed. The drilling was designed to penetrate
through shallow transported cover and sample in-situ upper saprolite clays. A review of this
drilling yielded several low-level saprolite anomalies, the largest of which is situated in the core
of the Caladan Fold (see Figure 4 below).
The Caladan Fold structure is 3km wide, over 8km long, and lies under 2m to 20m of loose to
partially cemented transported cover (the average depth of transported cover is 8m). The
broad structural setting is similar to the Kalgoorlie district, where the Boulder-Lefroy Fault
truncates the folded mafic stratigraphy of the Boomerang anticline. The under-explored nature
of the Caladan Fold, combined with several low-level regolith anomalies, presents the Caladan
target area as the best early-stage exploration target area within the Company’s project
portfolio. The exploration team aims to complete an initial AC test across the target area in the
coming months.
yandalresources.com.au | ASX:YRL
6
Conceptual Caladan
Fold truncated by a
northwest striking
structure to the south
Flushing
Meadows
Deposit
Irulan Dolerite-Basalt Complex;
situated between more ductile
volcanic/sedimentary Sequence
and bracketed by significant
structures
Figure 4: A simplified bedrock geology interpretation across the Caladan target area within the IWB
Gold Project with the main features of the preliminary ground gravity interpretation and the collars
of shallow 1995 RAB drilling marked and thematically coloured by max Au (ppb) from within in-situ
saprolite. These values have then been contoured. The red oval marks the position of the Flushing
Meadows Gold Deposit, and the blue outline represents the YRL tenement outline. The underlying
processed ground gravity image is derived from Bouguer anomaly 0.5 vertical derivative with northwest shade and a non-linear colour scale image.
Oblique Exploration Target
The diamond drilling results from the Oblique Prospect have been received, and the Exploration
Target for the Prospect has been revised accordingly, see Appendix 1. See ASX release 25th
October 2023 for the previous Exploration Target.
The potential quantity and grade of the Exploration Target is conceptual in nature and,
therefore, is an approximation. There has been insufficient exploration to estimate a Mineral
Resource, and it is uncertain if further exploration will result in the estimation of a Mineral
Resource. The Exploration Target is based on the current geological understanding of the
yandalresources.com.au | ASX:YRL
7
mineralisation geometry, mineralisation continuity, and the regional geological setting. This
understanding is driven by an extensive drill hole database, aerial magnetic data, and regional
mapping, coupled with the prospect's current knowledge of mineralisation. The Exploration
Target has been prepared and reported in compliance with the 2012 edition of the JORC Code.
Table 1: An updated summary of Exploration Targets for the Oblique, Quarter Moon and Flushing
Meadows Prospects/Deposits, see Appendix 1.
Project
Target
IWB
IWB
IWB
Oblique
Quarter Moon1
Flushing Meadows1
Total
Tonnes
(kt)
2,900
1,800
2,400
7,000
Lower Range
Grade
Ounces
(g/t Au)
(Oz)
1.00
90,000
1.4
80,000
1.2
90,000
1.1
260,000
Tonnes
(kt)
3,400
5,400
7,200
16,000
Upper Range
Grade
Ounces
(g/t Au)
(Oz)
1.3
140,000
1.8
310,000
1.5
350,000
1.4
800,000
*1 – Exploration Target remains unchanged since published; see ASX 25th October 2023.
This exploration target does not include the current Flushing Meadows Mineral Resource of
268Koz @ 1.1 g/t Au.
The Exploration Target for Oblique has been updated (See Appendix 1 and ASX 25 September
2023) to consider mineralisation hosted within oxidised and transitional material only, limiting the
assumption to a maximum down-dip extent of 125m. The Oblique Exploration Target will be
subject to exploration drilling within the next three to eighteen months.
yandalresources.com.au | ASX:YRL
8
Looking Ahead
The Company remains well positioned to maintain a high level of exploration throughout 2024
with priority exploration activities and forthcoming news, including;
1.
Results from the New England Granite EIS diamond drilling program are expected in early
September;
2.
The first results for the recently completed diamond drilling at Quarter Moon are expected
during September,
3.
Initial drill line clearing across the Caladan and Irulan targets will commence in early
September in preparation for an AC drilling program in the remainder of CY2024.
4.
An RC program is scheduled to commence across the New England Granite Prospect in
September once results from the diamond drilling have been processed.
Authorised by the board of Yandal Resources
For further information, please contact:
Chris Oorschot
Managing Director
Yandal Resources Limited
yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL
Greg Fitzgerald
Company Secretary
+61 8 9389 9021
yandal@yandalresources.com.au
9
Relevant Previous ASX Announcements
o
Large-scale Gold Anomalies Across Emerging Targets, 15 July 2024
o
Oblique RC Drilling Results, 18 June 2024
o
Exploration Update – IWB Ground Gravity Survey, 11 June 2024
o
Diamond Drilling Commences at Ironstone Well-Barwidgee, 24 May 2024
o
Initial RC results from Oblique Extend Mineralisation 500m, 29th of April 2024
o
Drilling Commences at Ironstone Well – Barwidgee, 7 March 2024
o
Oblique Phase Two RC Drilling Results, 12 January 2024
o
Phase 2 Oblique RC Drilling Program Complete, 8 December 2023
o
RC Drilling to Commence at Oblique Prospect – Yandal Belt, 8 November
2023
o
Drilling at Oblique Confirms Large Scale Potential, 25 October 2023
o
RC Drilling Commences at Ironstone Well-Barwidgee, 6 September 2023
o
Replacement Prospectus, 12 December 2018
yandalresources.com.au | ASX:YRL
10
About Yandal Resources Limited
Yandal Resources has a portfolio of advanced gold exploration projects in the highly prospective Yandal
and Norseman-Wiluna Greenstone Belts of Western Australia.
Yandal Resources’ gold project locations.
Table 2 – Yandal Resources Ltd - Mineral Resource Summary
Indicated
Inferred
Deposit
Tonnes Grade
Au
Tonnes
Grade
Au
(‘000s)
(g/t)
(oz)
(‘000)
(g/t)
(oz)
Ironstone Well
Flushing Meadows1
2,141
1.3
91,000
5,245
1.1
177,000
Mt McClure
Challenger2
718
1.9
44,000
Success3
1,255
1.9
75,000
4
Parmelia
252
2.1
17,000
5
HMS Sulphur
1010
1.2
39,000
Gilmore6
134
1.7
7,200
Sub-total - MMC
3,369
1.7
182,200
Gordons
Gordons Dam7
365
1.7
20,000
8
2,141
Grand-total
8,979
1.3
379,200
1.3
91,000
Total
Tonnes
(000’s)
Grade
(g/t)
Au
(Oz)
7,386
1.1
268,000
718
1.9
44,000
1,255
1.9
75,000
252
2.1
17,000
1010
1.2
39,000
134
3,369
1.7
1.7
7,200
182,200
365
1.7
20,000
11,120
1.4
470,200
Due to the effects of rounding, totals may not represent the sum of the individual components.
1.
Reported above 0.5g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 4 November 2020 for full
details. 2. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 22 August 2022
for full details 3. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 6
September 2022 for full details.4. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement
dated 20 September 2022 for full details 5. Reported above 0.5g/t Au lower cut-off grade within this announcement 6. Reported
above 1.0g/t Au lower cut-off grade within this announcement 7. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal
Resources Ltd ASX announcement dated 6 April 2023 for full details 8. All Resources are reported as global estimates, not constrained
by optimised pit shells.
yandalresources.com.au | ASX:YRL
11
Competent Person Statement
The information in this document related to Exploration Targets and Exploration Results, geology and data
compilation is based on information reviewed or compiled by Mr Christopher Oorschot, a Competent
Person who is a Member of The Australasian Institute Geoscientists. Mr Oorschot is the Managing Director
of the Company, is a full-time employee and holds shares and options in the Company. Mr Oorschot has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Oorschot consents to the inclusion in this announcement of the matters based on this information in the
form and context in which it appears.
The information in this announcement that relates to the Flushing Meadows, Mt McClure and Gordons Dam
Mineral Resource Estimates is based on information compiled and generated by Andrew Bewsher, an
employee of BM Geological Services Pty Ltd (“BMGS”). Both Andrew Bewsher and BMGS hold shares in
the Company. BMGS consents to the inclusion, form and context of the relevant information herein as
derived from the original resource reports. Mr Bewsher has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration and to the activity which is being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the JORC ‘Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves’.
YRL confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
Forward Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include, but
are not limited to, statements concerning Yandal Resources Limited’s (Yandal’s) current expectations,
estimates and projections about the industry in which Yandal operates, and beliefs and assumptions
regarding Yandal’s future performance. When used in this document, words such as “anticipate”, “could”,
“plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are
forward-looking statements. Although Yandal believes that its expectations reflected in these forwardlooking statements are reasonable, such statements are subject to known and unknown risks, uncertainties
and other factors, some of which are beyond the control of Yandal and no assurance can be given that
actual results will be consistent with these forward-looking statements. Drilling results presented indicate
geological potential for mineralisation, but there can be no certainty that these results will eventually form
part of a Mineral Resource Estimation.
yandalresources.com.au | ASX:YRL
12
Table 3: Summary of 2024 diamond drilling across the Oblique Prospect.
Hole ID
Hole
Type
Dip
(degrees)
Azimuth
(degrees)
Pre-collar
Depth
(m)
Total
Depth
(m)
East
(m)
North
(m)
RL
(m AHD)
24IWBRD0005
RCD
-60.4
223.2
114
409.3
274603
7035657
545
24IWBRD0009
RCD
-59.1
223.8
102
487.0
274755
7035612
545
7035376
546
24IWBRD0013
RCD
-61.0
224.8
90
360.9
274825
24IWBRD0014
RCD
-59.6
222.9
102
398.2
274948
7035216
543
24IWBRD0016
RCD
-61.8
218.0
108
399.0
275184
7035108
539
Table 4 – Oblique - Summary of significant diamond drilling assay results with a final length weighted
composite value >0.5g/t Au, inclusive of intervals grading >0.3g/t Au and with no more than 2m of
continuous internal waste included unless otherwise stated.
Hole
ID
Sample type
24IWBRD0005
24IWBRD0009
24IWBRD0009
24IWBRD0009
24IWBRD0013
24IWBRD0013
24IWBRD0013
24IWBRD0013
24IWBRD0014
24IWBRD0014
24IWBRD0014
24IWBRD0016
Half NQ2
Half NQ2
Half NQ2
Half NQ2
Half HQ2
Half HQ2
Half HQ2 & NQ2
Half NQ2
Half NQ2
Half NQ2
Half NQ2
Half NQ2
From
(m)
To
(m)
Interval
(m)
Au
(g/t)
Comm
ent
290.30
339.10
354.30
155.85
178.30
210.00
230.00
186.85
228.25
261.00
317.90
6.30
7.20
4.40
0.95
0.80
26.50
1.00
0.80
0.20
2.95
1.00
0.5
0.7
0.5
0.6
1.0
0.6
0.6
1.3
8.7
0.8
0.7
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
Fresh
NSA
284.00
331.90
349.90
154.90
177.50
183.50
229.00
186.05
228.05
258.05
316.90
yandalresources.com.au | ASX:YRL
13
Appendix 1: Exploration Target
The potential quantity and grade of the exploration target is conceptual in nature and,
therefore, is an approximation. There has been insufficient exploration to estimate a Mineral
Resource, and it is uncertain if further exploration will result in the estimation of a Mineral
Resource. The exploration target is based on the current geological understanding of the
mineralisation geometry, the continuity of mineralisation and the regional geological setting.
This understanding is driven by an extensive drill hole database, aerial magnetic data and
regional mapping, coupled with the current level of understanding of mineralisation across the
four prospects. The Exploration Target has been prepared and reported in accordance with
the 2012 edition of the JORC Code.
Prospect Exploration Target Assumptions
Oblique
The diamond drilling results from the Oblique Prospect have been received, and the
Exploration Target for the Prospect has been revised accordingly. See ASX release 25th
October 2023 for the previous Exploration Target.
The Exploration Target for the Oblique Prospect was derived from AC, RC and diamond drilling.
The current drill spacing across the prospect is insufficient to define a Mineral Resource
Estimate but provides some indication of the volume and grade of potential mineralisation.
Historic AC and RC drilling across Oblique were completed on 100m spaced sections across
700m of the strike. Historic RC drilling tests mineralisation to a maximum vertical extent of 140m.
Yandal Resources has since completed 32 RC holes and five diamond holes across the
prospect. Drilling provides confidence in the geometry of mineralisation with the main OBL-01
structure and has demonstrated mineralisation continuity over 500m of strike. Several parallel
positions have been included in the exploration target. However, the continuity of these
positions has not been well-tested.
The strike length of mineralisation was derived from the extent of >0.5 g/t intercepts within the
interpreted OBL-01 structure across the prospect. The average width of significant intercepts
>0.3 g/t Au was used as an assumption for the width of mineralisation for the lower target. The
average width of significant intercepts >0.5 g/t Au was used for the upper target.
Mineralisation was then projected down dip by 125m (the approximate depth of base-of-fresh
rock). The volume was converted to a tonnage range using a 2.4 g/cm3 density for both the
lower and upper ranges; the OBL01 structure is dominated by quartz veining and silica
alteration. A limited number of density measurements from the diamond core sample of the
OBL-01 structure within transitional material ranges between 2.8 g/cm3 to 3.9g/cm3. The lower
range target grade was derived from the average grade of intercepts, including historic RAB
and AC drilling; the upper range target grade was based on the RC drilling results within oxide
and transitional zones only and used a higher cut of grade of >0.5g/t Au (compared to >0.3g/t
Au) when calculating the average grade of mineralisation. There is evidence for several
parallel mineralised structures across the Oblique Prospect. Only a single structure was applied
for the lower-range target where there is evidence of grade continuity along the strike. Three
additional mineralised structures were included for the upper-range target. The strike length
applied to these structures equals the approximate drill line spacing (50m to 100m).
yandalresources.com.au | ASX:YRL
14
The Exploration Target for Oblique has been updated (See ASX 25 September 2023) only to
consider mineralisation hosted within oxidised and transitional material, limiting the assumption
to a maximum down-dip extent of 125m.
The Oblique Exploration Target will be subject to exploration drilling within the next three to
eighteen months.
Quarter Moon
The Exploration Target for the Quarter Moon Prospect was derived from a limited amount of RC
and AC/RAB drilling that is insufficient to define a Mineral Resource Estimate but provides some
indication of the volume and grade of potential mineralisation. Historic RC drilling across
Oblique was completed on 100m spaced sections across 700m of strike, in addition to AC/RAB
drilling on a similar spacing. Historic RC drilling tests mineralisation down to a maximum vertical
extent of 140m. Historic RC drilling has been validated by limited YRL RC drilling.
The mineralisation strike was derived from the extent of >1.0 g/t intercepts across the prospect.
The average width of significant intercepts (>0.3 g/t) was used as an assumption for the width
of mineralisation, which was then projected down dip by 250m (approximately 200m vertical).
The volume was converted to a tonnage range by using a density of 2.5 g/cm3 for the lower
range and 2.7 g/cm3 for the upper range, assuming deeper and shallower weathering,
respectively, within a basalt or dolerite host (oxide + transitional material to 100m down dip,
fresh to 200m down dip.
The lower range target grade was derived from the average grade of intercepts, including
RAB/AC, which increased by 20%, based on the assumption that the grade improved
moderately with depth. The upper range target grade was based on the same value but
increased by 50%, assuming a significant improvement in grade with depth. There is evidence
for parallel mineralised structures across the Quarter Moon Prospect, which are poorly tested.
For the lower-range target, only a single structure was applied; however, for the upper-range
target, two mineralised structures were applied.
Flushing Meadows
The exploration target for the Flushing Meadows was derived by extending a portion of the
current Mineral Resource Estimate for the deposit down dip an additional 80-120m to an
approximate vertical depth of 200m; a depth consistent with open-cut extraction methods. An
average density of 2.6g/cm3 was applied to the volume, assuming material at depth will be
transitional to fresh, with a density of 2.52 g/cm3 and 2.7 g/cm3 being applied for transitional
and fresh rock in the 2020 MRE, respectively. Flushing Meadows exhibits several parallel
mineralised structures; for the low-range assumption, only a single mineralised volume was
extended beyond the current bounds of the MRE. For the upper range, two additional
mineralised structures were projected down to 200m vertical. The grade for the lower range
was based on the average of mineralised intercepts >0.5g/t Au below a depth greater than
50m from the surface within YRL RC drilling. The upper range grade assumes a moderate 25%
increase in grade within fresh rock at depth.
yandalresources.com.au | ASX:YRL
15
The above exploration target for Flushing Meadows does not include the Current Mineral
Resource Estimate of 268,000 Oz @ 1.1 g/t Au (see ASX; YRL release dated 4th of November
2020).
Testing Exploration Targets
The above targets are being actively tested through exploration drilling. Diamond drilling results
from across the Quarter Moon and NEG Prospects are expected in the coming weeks, and
additional drilling across the Flushing Meadows Deposit and the Oblique Prospect in the next 618 months.
yandalresources.com.au | ASX:YRL
16
Appendix 2 – Ironstone Well-Barwidgee Gold Project, YRL 2024 Diamond, Oblique Prospect
JORC Code (2012) Table 1, Sections 1 and 2
Mr. Christopher Oorschot, Exploration Manager and Technical Director of Yandal Resources compiled the information in Section 1 and Section 2 of the
following JORC Tables and is the Competent Person for those sections. The following Table and Sections are provided to ensure compliance with the JORC
Code (2012 edition) requirements for the reporting of Exploration Results.
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
•
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
•
•
•
•
•
Aspects of the determination of mineralisation that are
Material to the Public Report. In cases where ‘industry
standard’ work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was used to obtain
1 m samples from which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other cases more
ASX Announcement 3 September 2024
•
Yandal Resources (YRL) diamond core samples include HQ2 (63.5mm diameter) and NQ2
(50.5mm diameter) core. The core was halved using a core saw, with the right-hand side
of the core (looking downhole) sampled.
Before sampling, the core is logged by a company geologist for lithology type, veining,
alteration, and deformation. Sample lengths vary subject to logged geological intervals
of interest, with a minimum sample length of 0.2 metres and a maximum sample length of
1.0 metres.
Sample quality is considered high.
Sample recovery of each metre drilled was measured and recorded, and high-resolution
photos of each tray were retained, enabling. The unsampled half of the drill core is also
retained. Intervals where the core is un-oriented have been recorded.
When the core is cut for sampling, the same side of the core, relative to the bottom-ofhole orientation mark, is collected for analysis. For intervals without an orientation mark,
the core is pieced together, and foliation or common structures are used to
approximately orient the core for sampling purposes.
Structural observations have also been recorded where the diamond core is oriented,
and structures sub-parallel to the core axis recorded.
For all diamond drilling results, HQ2 core and NQ2 core was cut in half and used to obtain
0.2m to 1.0m half core samples. These samples were submitted to a laboratory, where
they were dried, weighed, and crushed. The Sample pulp was then split to produce a 50g
lead collection fire assay, which was then analysed by Inductively Coupled Plasma
Optical (Atomic) Emission Spectrometry (ICP-OES).
Page 17
Criteria
JORC Code explanation
Commentary
explanation may be required, such as where there is
coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed information.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (e.g. core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type, whether
core is oriented and if so, by what method, etc).
•
YRL diamond core was drilled using HQ2 (63.5mm core diameter) and NQ2 (50.5mm core
diameter) coring bits. For all holes, RC pre-collars were completed to a depth of 90m to
114m (see Table 3). Subject to gro
Share your feedback
Discover