Air-core Drilling Commences Across Caladan & Irulan
Released
Released
Announcement PDF
ASX Announcement
10 October 2024
Exploration Update
Air-core Drilling Commences Across the Caladan and Irulan Targets
•
The first phase of AC drilling across the large-scale Caladan and Irulan
target areas has commenced.
•
A single line of air-core drilling will be completed across the Caladan
target area, testing several interpreted structures and the stratigraphy
across the 3km wide, 8km long fold structure.
•
800m spaced air-core lines will be completed across the northern half of
the Irulan target area.
•
A total of 65 holes will be completed across both target areas, with the
drilling set to be completed by the end of October.
•
A second broader-scale phase of air-core drilling across the Caladan
Target area will be finalised once requisite heritage surveys are
completed.
For further information or to ask questions concerning this announcement, please visit our
Investor Hub at https://investorhub.yandalresources.com.au/link/qy1plP
Yandal Resources Ltd (ASX: YRL, “Yandal Resources” or the “Company”) is pleased to
advise that the first phase of air-core (AC) drilling across Caladan and Irulan (E 53/1843,
E 53/2304) target areas within the Ironstone Well-Barwidgee (IWB) Gold Project has
commenced.
The Caladan and Irulan target areas represent early-stage, large-scale exploration
targets identified following the completion of a ground gravity survey in early 2024 (see
ASX releases dated 11 June 2024 and 15 July 2024). Air-core (AC) drilling will include one
line across the core of the Caladan target area, testing the core of the Cal-01 anomaly
(see Figure 2) and 800m spaced lines across the northern half of the Irulan target area
that will test the IRU-01 Anomaly (See Figure 2).
Contact Us
A: Level 1 Unit 5/62 Ord Street,
West Perth WA 6005
T: +61 (0)8 9389 9021
E: yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL
Board and Management
Chris Oorschot
Managing Director/CEO
Greg Evans
Non-Exec Chair
Katina Law
Non-Exec Director
Tim Kennedy
Non-Exec Director
Greg Fitzgerald
Company Secretary
Caladan
The Caladan target area presents a large-scale northwest plunging (interpreted) fold, truncated
by the Idaho Shear and interpreted as a second-order structure linking the Ockerbury Shear
Zone to the east and the Barwidgee Shear Zone to the west. The only systematic drilling across
the fold structure was completed in 1995 (see ASX 15 July 2024), where shallow vertical RAB
holes on a 400m by 400m spacing were completed. The drilling was designed to penetrate
through shallow transported cover and sample in-situ upper saprolite clays. A review of this
drilling yielded several low-level saprolite anomalies, the largest of which is situated in the core
of the Caladan Fold (see Figure 2 below).
The Caladan Fold structure is 3km wide, over 8km long, and lies under 2m to 20m of loose to
partially cemented transported cover (the average depth of transported cover is 8m). The
broad structural setting is similar to the Kalgoorlie district, where the Boulder-Lefroy Fault
truncates the folded mafic stratigraphy of the Boomerang anticline. The under-explored nature
of the Caladan Fold, combined with several low-level regolith anomalies, presents the Caladan
target area as a high-priority early-stage exploration target area within the Company’s project
portfolio.
Irulan
The Irulan target area presents a large mafic dolerite complex up to 1km wide and interpreted
over more than 8km of strike. The regional Barwidgee Shear Zone brackets the dolerite complex
to the southwest and the Idaho Shear to the northeast. It is also bound by interpreted volcanosedimentary units along both margins (see Figures 1 & 2).
Previous drilling completed at the Rosewall Prospect within the Irulan target area (see ASX
release dated 15 July 2024) demonstrates the potential for the dolerite complex to host highgrade mineralisation with intercepts, including:
o
9m @ 4.6g/t Au from 12m in GCMBDYC43 (historic drilling)
o
10m @ 2.4 g/t Au from the surface in YRLAC0033
o
Including 4m @ 3.9g/t Au from 16m
7m @ 2.0g/t Au from 16m in YRLAC0031
o
Including 5m @ 4.1g/t Au from the surface
7m @ 2.7g/t Au from 14m in YRLRC00469
o
Including 5m @ 7.6g/t Au from 13m
Including 3m @ 4.0g/t Au from 20m
6m @ 2.0g/t Au from 13m in YRLRC0469
yandalresources.com.au | ASX:YRL
2
The ground gravity survey completed in early 2024 refined and highlighted the Company’s
interpretation of the mafic package, highlighting the extent of the dolerite complex and
numerous cross-cutting structures. Dolerite is a regionally significant host for orogenic gold
mineralisation within the Yandal greenstone belt, with most high-grade lodes at the world-class
Jundee deposit hosted within the Barton dolerite. The Irulan dolerite complex presents an
analogous litho-structural setting to the Jundee deposit, with a large dolerite complex that is
bracketed by late volcano-sedimentary units and directly adjacent to the regional Ockerburry
hear zone.
yandalresources.com.au | ASX:YRL
3
Figure 1: A simplified bedrock geology interpretation across the IWB Gold Project with the
main features of the preliminary ground gravity interpretation, including conceptual target
areas. The red oval marks the position of the Flushing Meadows Gold Deposit, and the blue
outline represents the YRL tenement outline. The underlying processed ground gravity image
is derived from Bouguer anomaly 0.5 vertical derivative with north-west shade and a non-linear
colour scale image.
yandalresources.com.au | ASX:YRL
4
Figure 2: A simplified bedrock geology interpretation across the Caladan and northern Irulan target areas
within the IWB Gold Project, with the main features of the preliminary ground gravity interpretation. The
collars of shallow 1995 RAB drilling are plotted and thematically coloured by max Au (ppb) from within insitu saprolite. These values were then contoured with anomalies of interest labelled. The red oval marks the
position of the Flushing Meadows Gold Deposit, and the blue outline represents the YRL tenement outline.
The underlying processed ground gravity image is derived from Bouguer anomaly 0.5 vertical derivative
with north-west shade and a non-linear colour scale image.
yandalresources.com.au | ASX:YRL
5
Looking Ahead
1.
The Caladan and Irulan air-core programs will be completed by the end of October,
and results are expected in 6-8 weeks.
2.
A second phase of air-core drilling will be scheduled across the Caladan target area
following the completion of heritage surveys.
3.
Results from the New England Granite RC drilling program are expected in the next 4 to
6 weeks,
4.
Results from the second phase of soil sampling covering the broader Caladan target
area are expected in 6-8 weeks.
5.
Field reconnaissance of soil anomalies across the Ironstone Well-Barwidgee Gold
Project is ongoing (See ASX announcement dated 12 August 2024); this includes
mapping and rock chip sampling.
Authorised by the board of Yandal Resources
For further information, please contact:
Chris Oorschot
Managing Director
Yandal Resources Limited
yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL
Greg Fitzgerald
Company Secretary
+61 8 9389 9021
yandal@yandalresources.com.au
6
Relevant Previous ASX Announcements
o
Oblique Diamond Drilling Results, 3 September 2024
o
IWB Soil Results and NEG Diamond Drilling Complete, 12 August 2024
o
Large-scale Gold Anomalies Across Emerging Targets, 15 July 2024
o
Gold Coast Investment Showcase Presentation, 20 June 2024
o
Exploration Update – IWB Ground Gravity Survey, 11 June 2024
o
Drilling at Oblique Confirms Large Scale Potential, 25 October 2023
o
Exploration Update – Yandal Gold Projects, 4 July 2019
o
Encouraging Drill Results – Yandal Gold Projects, 21 March 2019
o
Replacement Prospectus, 12 December 2018
yandalresources.com.au | ASX:YRL
7
About Yandal Resources Limited
Yandal Resources has a portfolio of advanced gold exploration projects in the highly prospective Yandal
and Norseman-Wiluna Greenstone Belts of Western Australia.
Yandal Resources’ gold project locations.
Yandal Resources Ltd - Mineral Resource Summary
Indicated
Inferred
Deposit
Tonnes Grade
Au
Tonnes
Grade
Au
(‘000s)
(g/t)
(oz)
(‘000)
(g/t)
(oz)
Ironstone Well
Flushing Meadows1
2,141
1.3
91,000
5,245
1.1
177,000
Mt McClure
Challenger2
718
1.9
44,000
Success3
1,255
1.9
75,000
4
Parmelia
252
2.1
17,000
5
HMS Sulphur
1010
1.2
39,000
Gilmore6
134
1.7
7,200
Sub-total - MMC
3,369
1.7
182,200
Gordons
Gordons Dam7
365
1.7
20,000
8
2,141
Grand-total
8,979
1.3
379,200
1.3
91,000
Total
Tonnes
(000’s)
Grade
(g/t)
Au
(Oz)
7,386
1.1
268,000
718
1.9
44,000
1,255
1.9
75,000
252
2.1
17,000
1010
1.2
39,000
134
3,369
1.7
1.7
7,200
182,200
365
1.7
20,000
11,120
1.4
470,200
Due to the effects of rounding, totals may not represent the sum of the individual components.
1.
Reported above 0.5g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 4 November 2020 for full
details. 2. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 22 August 2022
for full details 3. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 6
September 2022 for full details.4. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement
dated 20 September 2022 for full details 5. Reported above 0.5g/t Au lower cut-off grade within this announcement 6. Reported
above 1.0g/t Au lower cut-off grade within this announcement 7. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal
Resources Ltd ASX announcement dated 6 April 2023 for full details 8. All Resources are reported as global estimates, not constrained
by optimised pit shells.
yandalresources.com.au | ASX:YRL
8
Competent Person Statement
The information in this document related to Exploration Targets and Exploration Results, geology and data
compilation is based on information reviewed or compiled by Mr Christopher Oorschot, a Competent
Person who is a Member of The Australasian Institute Geoscientists. Mr Oorschot is the Managing Director
of the Company, is a full-time employee and holds shares and options in the Company. Mr Oorschot has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Oorschot consents to the inclusion in this announcement of the matters based on this information in the
form and context in which it appears.
The information in this announcement that relates to the Flushing Meadows, Mt McClure and Gordons Dam
Mineral Resource Estimates is based on information compiled and generated by Andrew Bewsher, an
employee of BM Geological Services Pty Ltd (“BMGS”). Both Andrew Bewsher and BMGS hold shares in
the Company. BMGS consents to the inclusion, form and context of the relevant information herein as
derived from the original resource reports. Mr Bewsher has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration and to the activity which is being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the JORC ‘Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves’.
YRL confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
Forward Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include, but
are not limited to, statements concerning Yandal Resources Limited’s (Yandal’s) current expectations,
estimates and projections about the industry in which Yandal operates, and beliefs and assumptions
regarding Yandal’s future performance. When used in this document, words such as “anticipate”, “could”,
“plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are
forward-looking statements. Although Yandal believes that its expectations reflected in these forwardlooking statements are reasonable, such statements are subject to known and unknown risks, uncertainties
and other factors, some of which are beyond the control of Yandal and no assurance can be given that
actual results will be consistent with these forward-looking statements. Drilling results presented indicate
geological potential for mineralisation, but there can be no certainty that these results will eventually form
part of a Mineral Resource Estimation.
yandalresources.com.au | ASX:YRL
9
Appendix 1 – Ironstone Well-Barwidgee Gold Project, YRL 2019/2020 Irulan Drilling & Historic Caladan RAB Drilling
JORC Code (2012) Table 1, Sections 1 and 2
Mr Christopher Oorschot, Managing Director and CEO of Yandal Resources compiled the information in Section 1 and Section 2 of the below JORC Tables
and is the Competent Person for those sections. The following Table and Sections are provided to ensure compliance with the JORC Code (2012 edition)
requirements for the reporting of Exploration Results.
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
Commentary
•
•
•
•
•
•
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
ASX Announcement 10 October 2024
•
All drilling and exploration data discussed in this release has been previously reported;
see:
o Large-scale Gold Anomalies Across Emerging Targets, 15 July 2024
o Exploration Update – Yandal Gold Projects, 4 July 2019
o Encouraging Drill Results – Yandal Gold Projects, 21 March 2019
o Replacement Prospectus, 12 December 2018
For 2019 YRL AC drilling, 4m composite samples were taken with a 50mm diameter PVC
spear thrust to the bottom of the AC sample pile, laid out as individual metres piles in order
on the ground. If the 4m composites were anomalous, a 1m single split is collected using
the spear. The average sample weight is about 4.0kg for 4m composites and 2.0-2.5kg for
1m samples.
For 2019 and 2020 YRL RC Drilling, 4m composite samples were taken with a 50mm
diameter PVC spear thrust to the bottom of the RC sample pile, laid out as individual
metres piles in order on the ground. If the 4m composites were anomalous, the 1m sample
derived from the onboard cone splitter and stored in a calico bag with a unique ID is
collected.
For historic RAB drilling completed by Eagle Mining in 1995, derived from WAMEX Report
A047408, samples were taken over discrete lithological changes of varying lengths. Holes
were terminated once a recognisable saprolitic horizon was intercepted.
For historic RAB drilling completed by Hunter Resources in 1995, derived from WAMEX
Report A047408, samples were collected as 4m composites from the transported/residual
interface to the bottom of the hole.
For historic RAB drilling, it is assumed that sample methodologies were industry standards
and likely involved collecting sample material from 1m sample piles laid out in order on
the ground adjacent to the collar.
For YRL AC and RC drilling, recovery and drill depth were assessed by comparing drill chip
volumes (sample bags) for individual meters. Estimates of sample recoveries were
routinely recorded. Routine checks for correct sample depths are undertaken after the
completion of every rod (3m for AC and 6m for RC).
Page 10
Criteria
JORC Code explanation
Commentary
•
•
Aspects of the determination of mineralisation that are
Material to the Public Report. In cases where ‘industry
standard’ work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was used to obtain
1 m samples from which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed information.
•
•
•
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (e.g. core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type, whether
core is oriented and if so, by what method, etc).
Drill sample
recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.
•
•
•
•
•
ASX Announcement 10 October 2024
For YRL drilling, AC and RC sample recoveries were visually checked for recovery, moisture
and contamination. The cyclone was routinely cleaned to ensure no material buildup.
Due to the generally good drilling conditions around the Rosewall Prospect (no
groundwater and shallow weathering profile), samples are considered to be of high
quality and representative of the intervals drilled.
For YRL AC and RC 2019-2020 samples, drilling was used to obtain 1m samples, from which
approximately 2.0-2.5kg was pulverised to produce a 50g charge for fire assay when 4m
composite assays were anomalous. AC and RC chips were geologically logged over 1m
intervals and initially sampled over 4m intervals to create a composite sample (assayed
via Aqua Regia partial digest with AAS determination). Anomalous 4m intervals were then
sampled over 1m intervals via the fire assay method. Depending on the hole depth, the
maximum composite interval was 4m, and the minimum was 2m. Samples were analysed
for only the programs. Drilling intersected transitional mineralisation to a maximum drill
depth of 23m.
For historic RAB drilling completed by Eagle Mining in 1995, derived from WAMEX Report
A047408, 2m to 5m composite samples and 1m samples were taken based on discrete
lithological units (loose transported cover, consolidated transported cover, saprolite
clays, etc.). Samples were then pulverised and analysed for gold by BETA aqua regia
method with a carbon rod finish with ASS gold determination. No follow-up sampling was
completed.
For historic RAB drilling completed by Hunter Resources in 1995, derived from WAMEX
Report A047408, 4m composite samples were taken within the targeted saprolite clays.
Samples were then pulverised and analysed for gold by aqua regia digest method with
a carbon rod finish with ASS gold determination. No follow-up sampling was completed.
YRL AC drilling was completed with a 3’ 1/4 inch AC blade bit and hammer (where hard
conditions prevailed).
YRL RC was completed using a 5’ ¼ inch face sampling hammer.
For historic RAB drilling completed by Eagle Mining and Hunter Resources in 1995, an
industry-standard RAB drill rig and setup were assumed to be used.
For YRL 2019-2020 drilling, AC and RC recovery and meterage were assessed by
comparing drill chip volumes for individual meters. Estimates of sample recoveries were
routinely recorded. Routine checks for correct sample depths are undertaken at the
completion of each rod (3m for AC and 6m for RC).
AC and RC sample recoveries were visually checked for recovery, moisture and
Page 11
Criteria
JORC Code explanation
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Logging
Commentary
•
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
•
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
•
•
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
contamination. The cyclone was routinely cleaned to ensure no material buildup.
Due to the generally good drilling conditions around the Rosewall Prospect, samples
represent the interval drilled.
Historical recording of the sample recovery is limited; however, logging data captures
sample condition, with only a small percentage of intervals drilling noting damp or wet
samples. It was noted in historical logs that some holes failed to penetrate through the
hard semi-lithified transported cover.
For YRL 2019-2020 drilling, the supervising geologist completed AC and RC drill chip
logging at one-metre intervals at the rig. Logging data was captured in Excel
spreadsheets and stored in a micromine data file format. It is qualitative in nature. All
drilled intervals were logged.
For historic RAB drilling completed by Eagle Mining and Hunter Resources in 1995, logging
was completed at various intervals based on geological observation and recorded by
hand into pre-printed logging forms. These forms were scanned and included in WAMEX
report A047408. It was qualitative in nature. All drilled intervals were logged.
The total length and percentage of the relevant
intersections logged.
Sub-sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter, half or
all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected, including
for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled.
ASX Announcement 10 October 2024
•
•
•
•
•
•
•
•
For YRL 2019-2020 drilling, both AC and RC samples were collected. AC and RC 4m
composite samples were collected from the drill rig by spearing each 1m sample pile.
Single metres samples were collected for AC drilling by spearing individual metre sample
piles. For RC drilling, 1m samples were collected from an onboard cone splitter and
placed into a calico bag with a unique sample ID. Samples were collected dry.
For YRL AC samples, no duplicate 1m samples were taken in the field. Standards and
blanks were routinely inserted into the sample sequence for 4m and 1m samples.
For YRL RC samples, field duplicates were collected routinely. Standards and blanks were
routinely inserted into the sample sequence for 4m and 1m samples. Duplicate results
were acceptable, given the variable nature of orogenic gold mineralisation.
YRL AC sample weights were relatively consistent, approximately 2.0-2.5 kg.
YRL RC sample weights were relatively consistent, approximately 2.0-3.5 kg.
For labs used by YRL, internal lab quality control measures include lab duplicates and the
insertion of lab standards and blanks.
The sample size is appropriate given the fine to medium-grained size of the sheared
dolerite host.
For historic RAB drilling completed by Eagle Mining and Hunter Resources in 1995, details
of sample methods and quality control measures were not recorded but are assumed to
be of an industry standard for the time. It was noted that field duplicates were collected
from intervals of interest during the Hunter Resources drilling.
Page 12
Criteria
JORC Code explanation
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
•
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation,
etc.
•
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
Commentary
•
•
•
Verification
of sampling
and assaying
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
ASX Announcement 10 October 2024
•
•
•
•
For YRL 2019-2020 drilling, the 4m composite samples were assayed by Aqua Regia
(0.01ppm Au lower detection limit) and the 1m splits by Fire Assay ICP-MS (inductively
coupled plasma – mass spectrometry) with a lower detection limit of 0.01ppm Au, by
accredited Aurum Laboratories Pty Ltd in Beckenham, Perth, WA. for gold only.
Aurum laboratories QA/QC involves the insertion of internal lab standards using certified
reference material, blanks, splits and replicates as part of the in-house procedures. QC
results (blanks, duplicates, standards) are aligned with commercial procedures,
reproducibility, and accuracy. These comparisons were deemed satisfactory.
For YRL 2019-2020 AC and RC drilling 4m composites, one standard was inserted for every
40 samples and one blank was inserted for every 80 samples. For 1m samples, one
standard was inserted for every 40 samples, and one blank was inserted for every 80
samples.
For historic RAB drilling completed by Eagle Mining, samples were submitted to Genalysis
Laboratories in Perth for Au analysis by BETA with a lower detection limit of 1ppb Au. Scans
of the original lab reports are retained in the WAMEX report A047408. Internal lab QC
protocols are unknown and assumed to be the industry standard for the time.
For historic RAB drilling completed by Hunter Resources, samples were submitted to Amdel
Laboratories in Perth for Au analysis by aqua regia digest/Carbon rod AA method, with a
lower detection limit of 1ppb Au. Scans of the original lab reports are retained in the
WAMEX report A047408. Internal lab QC protocols are unknown and assumed to be the
industry standard for the time.
For YRL drilling, all significant intercepts have been visually verified against the retained
AC and RC chip trays, with all significant intercepts showing evidence of shearing,
alteration and quartz veining at the expected intervals. Lab and drilling data is stored as
PDF scans or Excel spreadsheets on the Company Server in the Perth office.
No data was adjusted. No twinned holes have been drilled.
For YRL drilling, all intercepts have been previously reported. Significant intercepts were
calculated by generating a length-weighted average of sample grades for all intervals
greater than or equal to 0.3g/t Au, with no more than 2m of continuous internal waste
included unless otherwise stated.
For historic drilling, all drilling data has been previously reported. The data is publicly
available from WAMEX report A047408. Scanning of original logging and sampling data
were reviewed and transcribed into an Excel spreadsheet by Company geologists under
the supervision of Mr. Chris Oorschot. Data was then verified by comparing results to
original plans and sections included within WAMEX report A047408. Furthermore, several
pads from the 1995 drilling program were located in the field and found to be located
within 30m of the historic coordinates. Given the low-level nature of the significant results
and the lack of historic chips at the drill site, visual verification of results was impossible.
Page 13
Criteria
JORC Code explanation
Location of
data points
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
Specification of the grid system used.
Commentary
•
•
•
Quality and adequacy of topographic control.
•
Data spacing
and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
•
•
•
Whether sample compositing has been applied.
Orientation of
data in
relation to
geological
structure
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this
is known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
ASX Announcement 10 October 2024
•
•
There has been no adjustment to historic assay data.
For YRL 2019-2020 AC and RC drilling, all drill collar locations were initially pegged and
surveyed using a handheld Garmin GPS, which was accurate to within 3-5m. The
topography is mainly flat at the drilling location. No downhole surveys were completed
for the AC or RC drilling.
For YRL drilling, MGA94 Zone 51 for AC drilling and local grid and AMG coordinates for
historic drilling converted to MGA94 Zone 51. The topography is flat, with only minor
elevation differences between drill holes. This difference is unlikely to impact geological
interpretations materially. A topographic surface from the recently completed ground
gravity survey has been used to validate RL’s.
For historic RAB drilling completed by Eagle Mining and Hunter Resources, the original
AGD84, AMG zone 51s coordinates were transcribed from scans of the o