Arrakis Results Further Extend Gold Mineralisation at Depth
Released
Released
Announcement PDF
Contact Us
A: Suite 1, Level 3, 1138 Hay Street,
West Perth WA 6005
T: +61 (0)8 9389 9021
E: yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL
Board and Management
Eduard Eshuys Non-Exec Chair
Andrew Jackson Non-Exec Director
Greg Evans Non-Exec Director
Sevan Gore Non-Exec Director
Greg Fitzgerald Company Secretary
Arrakis Diamond Drilling Continues to
Extend Gold Mineralisation at Depth
Arrakis Results
• Significant intercepts from the latest diamond drilling program include:
o 17.8m @ 2.5g/t Au from 391.2m in 26IWBDD0019 (ETW*1 11m),
including,
9.9m @ 3.1g/t Au from 391.6m, and
2.9m @ 3.1g/t Au from 403m
o 44.4m @ 1.3g/t Au from 450.6m in 26IWBDD0018 (ETW*1 28m)
• Results demonstrate that both broad and higher-grade mineralisation are
present at depth across Arrakis
• Completed diamond holes 26IWBDD0020 and 26IWBDD0021 have all
successfully intercepted the Arrakis structure, with results from priority
samples expected in late November.
• Additional diamond hole 26IWBDD0022 added to the program and
completed approximately 100m below the previously reported
26IWBRC0017 (ASX release 19 October 2026) intercept of:
o 56.6m @ 1.1g/t Au from 398.5m in 26IWBDD0017 (ETW*1 32m),
including,
29.8m @ 1.4g/t Au from 398.5m, and
20.5m @ 1.0g/t Au from 434.7m,
• A nine-hole RC program is underway at Arrakis to test the shallow portion of
Domain C.
*1 ETW - Estimated True Width
For further information or to ask questions in response to this announcement, please visit our
Investor Hub at https://yandalresources.com.au/link/yO5n7r
ASX Announcement
12 November 2026
yandalresources.com.au | ASX:YRL 2
Yandal Resources Ltd (ASX: YRL, “Yandal Resources” or the “Company”) is pleased to
provide an update on the ongoing exploration activities across the Ironstone Well-Barwidgee
(IWB) Gold Project, situated in the Yandal Greenstone Belt of Western Australia (see Figure
9).
Priority results from Arrakis diamond holes 26IWBDD0018 and 26IWBDD0019 have been
received. Both diamond holes are part of an expanded eight-hole, ~3,800m diamond drilling
program completed across Arrakis that is designed to test the scale of high-grade
mineralisation at depth (see Figures 1, 2, 3 and 4). The diamond drilling program was
completed in early November. Reported results are from priority sample zones; additional
results from non-priority samples are anticipated in December.
Final follow-up RC drilling results from Siona have also been received and reported below.
Results suggest shallow oxide gold mineralisation tied to a weathered intrusive margin parallel
to Siona (see Figures 5, 6 and 7).
Arrakis Diamond Drilling
An eight-hole, ~3,800m diamond drilling program was completed across Arrakis in early
November. The program is designed to assess the scale of high-grade mineralisation at depth.
Results from priority sample zones from 26IWBDD0018 and 26IWBDD0019 have been received;
results (see Tables 2 and 3) include:
o 17.8m @ 2.5g/t Au from 391.2m in 26IWBDD0019 (ETW*1 11m), including,
9.9m @ 3.1g/t Au from 391.6m, and
2.9m @ 3.1g/t Au from 403m
o 44.4m @ 1.3g/t Au from 450.6m in 26IWBDD0018 (ETW*1 28m)
*1 ETW - Estimated True Width
Results from 26IWBDD0018 and 26IWBDD0019 demonstrate the potential for strong mineralisation
continuity at depth (See Figures 1, 2 and 3) and for the mineralised system to produce both broad
mineralisation and narrower high-grade mineralisation comparable to shallower drilling.
Further drilling is needed to determine if the results from 26IWBDD0019 are associated with Domain
C or Domain A. Geological observations from diamond holes 26IWBDD0020 and 26IWBDD0021
indicate the Arrakis structure was successfully intercepted.
An additional diamond hole, 26IWBDD0022, was added to the program to test for Arrakis
mineralisation approximately 100m below the recently reported 26IWBDD0017 intercept (56.6m
@ 1.1g/t Au from 398.5m).
yandalresources.com.au | ASX:YRL 3
With the completion of the diamond drilling program at Arrakis, a nine-hole RC program
(approximately 1,000m) has commenced to test the shallow portion of Domain C (see Figure 2).
The program will be completed over the coming weeks.
Figure 1: Cross-section showing mineralised intervals from 26IWBDD0019 from the Arrakis Prospect. The
section location is shown in Figure 4. The section shows all drilling within +/- 25m of the section plane.
Cross-Section
6,250mN
northwest facing
Transported Cover
Surface
BOCO
TOFR
17.8m @ 2.5g/t Au
Incl. 9.9m @ 3.1g/t Au
& 2.9m @ 3.1g/t Au
11m @ 1.2g/t Au
Incl. 3m @ 1.8g/t Au
& 2m @ 3.2g/t Au
10m @ 0.6g/t Au
Incl. 1m @ 2.2g/t Au
5m @ 1.2g/t Au
Incl. 2m @ 2.0g/t Au
4m @ 2.1g/t Au
Incl. 1m @ 5.6g/t Au
2m @ 1.4g/t Au
10m @ 1.2g/t Au
Incl. 1m @ 10.0g/t Au
yandalresources.com.au | ASX:YRL 4
Figure 2: A longitudinal section displaying intercept midpoints within the main Arrakis mineralised structure (intercepts from subordinate structures are excluded). Grade
accumulation (length multiplied by Au grade) is based on down-hole length, with no true width correction applied. This longitudinal section has been prepared to show the
distribution of recent intercepts across the interpreted Arrakis trend. Contours are based on grade (g/t Au) multiplied by down-hole length (m) values, and are presented to
provide a visual interpretation of high-grade domains across the Arrakis mineralised system. Please note that closer-spaced drilling is needed to verify geological and grade
continuity along strike. Closer-spaced drilling is also needed to verify the geometry and extent of the higher-grade domains contoured in this longitudinal section.
Scale
250m
NORTHWEST
Surface
BOCO
Arrakis
Longitudinal Section
southwest facing
SOUTHEAST
26IWBRC0120
20m @ 8.7g/t Au
Incl. 6m @ 28.3g/t Au
Incl. 3m @ 52.8g/t Au
Long-section Plots Confirmed
Intercepts Within the Primary
Arrakis Structure Only
Transported Cover
26IWBRC0121D
15m @ 1.2g/t Au, Incl. 5 m @ 2.4g/t
17.5m @ 2.3 g/t Au, Incl. 3.8m @ 2.8g/t Au,
& Incl. 4.8m @ 4.0g/t Au, followed by
17.0m @ 1.1 g/t Au, Incl. 1.6m @ 3.8g/t Au
Domain A
Domain B
Domain C
25IWBRC0042
50m @ 1.3 g/t Au incl.
28m @ 1.9g/t Au
26IWBRC0066D- 11.5m @ 1.6g/t Au, Incl. 5.0m @
3.1g/t Au & 21.7m @ 0.8g/t Au Incl. 4m @ 2.1g/t Au
26IWBRC0117D
24.2m @ 1.4g/t Au
Incl. 8.3m @ 3.0g/t Au
26IWBDD0017
56.6m @ 1.1g/t Au,
Incl. 29.8m @ 1.4g/t Au
& 20.5m @ 1.0g/t Au
26IWBDD0016
16.7m @ 1.0g/t Au
26IWBRC0110D
1.6m @ 1.2g/t Au
26IWBDD0018
44.4m @ 1.3g/t Au
26IWBDD0019
17.8m @ 2.5g/t Au
Incl. 9.9m @ 3.1g/t Au
& 2.9m @ 3.1g/t Au
26IWBDD0020
Results Pending
26IWBDD0021
Results Pending
26IWBDD0022
Results Pending
yandalresources.com.au | ASX:YRL 5
Figure 3: Cross-section showing mineralised intervals from 26IWBDD0018 from the Arrakis Prospect. The
section location is shown in Figure 4. The section shows all drilling within +/- 25m of the section plane.
Cross-Section
6,200mN
northwest facing
Transported Cover
Surface
BOCO
TOFR
17.7m @ 1.4g/t Au
Incl. 8.0m @ 2.5g/t Au
44.4m @ 1.3g/t Au
39m @ 0.4g/t Au
Incl. 3m @ 2.1g/t Au
yandalresources.com.au | ASX:YRL 6
Figure 4: A collar plan over the Arrakis Prospect within the Caladan target area, overlying a
ground gravity image (BA267 1VD linear colour scale, with northeast shade). All Yandal drilling is
plotted (historic drilling has been excluded). Collars are thematically coloured by max Au (g/t) in
the hole. Dashed yellow polygons represent air-core regolith anomalies (Results include ~4m @
0.1 g/t Au or greater, with the upper profile or the bottom-of-hole sample is 0.1g/t Au or greater).
The plan is plotted to the Arrakis Local Grid; see Appendix 1 for the two-point transformation to
EPSG: 28351.
500m
6,350mN
6750mN
6150mN
5350mN
5950mN
6950mN
7050mN
6,050mN
6450mN
6850mN
26IWBRC0120
20m @ 8.7g/t Au
Incl. 6m @ 28.3g/t Au
6550mN
6650mN
26IWBRC0135
6m @ 2.5g/t Au Incl.
4m @ 3.5g/t Au
26IWBRC0121D
15m @ 1.2g/t Au,
Incl. 5m @ 2.4g/t
17.5m @ 2.3 g/t Au,
Incl. 3.8m @ 2.8g/t Au,
& 4.8m @ 4.0g/t Au,
17.0m @ 1.1 g/t Au,
Incl. 1.6m @ 3.8g/t Au
26IWBRC0117D
24.2m @ 1.4g/t Au
Incl. 8.3m @ 3.0g/t Au
Incl. 3.0m @ 5.4g/t Au
25IWBAC096
9m @ 1.2 g/t Au
< 6250mN Section
26IWBDD0016
16.7m @ 1.0g/t Au
Incl. 2.7m @ 1.8g/t Au
26IWBDD0017
56.6m @ 1.1g/t Au
Incl. 8m @ 1.8g/t Au,
6.4m @ 2.3g/t Au, &
3.8m @ 2.8g/tAu
< 6200mN Section
26IWBDD0019
17.8m @ 2.5g/t Au
Incl. 9.9m @ 3.1g/t Au
& 2.9m @ 3.1g/t Au
26IWBDD0018
44.4m @ 1.3g/t Au
yandalresources.com.au | ASX:YRL 7
Siona RC Drilling Results
Results from the final two of nine RC holes following up shallow oxide intercepts from the Siona
Prospect, within the New England Granite target (see Figure 8), reported in July (See ASX release
13 July 2026), have been received (see Tables 4 and 5). Best results from the final holes include:
o 12m @ 0.6g/t Au from 47m in 26IWBRC0148, including,
3m @ 1.5g/t Au from 49m, and
o 15m @ 0.4g/t Au from 110m in 26IWBRC0148.
Results from 26IWBRC0148 and previously reported 26IWBRC0150 (see ASX release 19 October
2026) occur within partially weathered rock proximal to the contact between the New England
Granite (NEG) and an east-west striking dolerite dyke (see Figures 5, 6 and 7). The NEG side of the
contact appears to be heavily weathered compared to the dolerite, with mineralisation
occurring in the upper part of the weathering profile.
yandalresources.com.au | ASX:YRL 8
Figure 5: Cross-section showing mineralised intervals from 26IWBRC0147 and 26IWBRC0148
from the Siona Prospect. The section location is shown in Figure 7. The section shows all
drilling within +/- 20m of the section plane.
Transported
Cover
New England
Granite
Surface
Dolerite
15m @ 0.4g/t Au
Incl. 1m @ 1.9g/t Au
Siona
Cross-Section B
northwest facing
12m @ 0.6g/t Au
Incl. 3m @ 1.5g/t Au
yandalresources.com.au | ASX:YRL 9
Figure 6: Cross-section showing mineralised intervals from previously reported 26IWBRC0149
and 26IWBRC0150 from the Siona Prospect. The section location is shown in Figure 7. The
section shows all drilling within +/- 20m of the section plane.
Transported
Cover
New England
Granite
Surface
Basalt
Dolerite
19m @ 1.2g/t Au
Incl. 11m @ 1.8g/t Au
Siona
Cross-Section A
northwest facing
yandalresources.com.au | ASX:YRL 10
Figure 7: Siona collar plan overlaid on a ground gravity image (BA267 1VD linear colour scale, with
northeast shading). All Yandal drilling is plotted. Collars are thematically coloured by max Au (g/t) in
the hole. The section lines for cross-section A and B (Figures 5 and 6) are also displayed. See Figure 8 for
the location of Siona within the NEG target area.
26IWBRC0074
13m @ 1.5g/t Au
Incl. 2m @ 8.1g/t Au
Surface Projection of
Previously Defined Main
Siona Mineralised
Structure
200m
26IWBRC0084
17m @ 1.3g/t Au
Incl. 3m @ 5.0g/t Au
26IWBRC0080
10m @ 0.9g/t Au
Incl. 1m @ 3.7g/t Au
26IWBRC0076
15m @ 0.5g/t Au
26IWBRC00148
12m @ 0.6g/t Au
Incl. 3m @ 1.5g/t Au
&15m @ 0.4g/t Au
Incl. 1m @ 1.9g/t Au
26IWBRC0150
19m @ 1.2g/t Au
Incl. 11m @ 1.8g/t Au
26IWBRC0086
10m @ 0.9g/t Au
Incl. 1m @ 2.0g/t Au
& 2m @ 3.2g/t Au
yandalresources.com.au | ASX:YRL 11
Figure 8: Plan showing processed infill ground gravity dataset (BA267 1VD northwest
shade linear colour scale) across the New England Granite target area. The plan
includes the interpretation of the intrusive margin and a preliminary interpretation of
structures interacting with the intrusion. Broad structural targets include Salusa and
NEG01-NEG04.
yandalresources.com.au | ASX:YRL 12
Next Steps and Looking Ahead
The active exploration programs across the IWB Gold Project are advancing well, as the
Company pursues large-scale gold discoveries in under-explored areas within the well-endowed
Yandal Greenstone Belt. Notable near-term activities include:
Arrakis Drilling
• Results from recently completed diamond holes 26IWBDD0020, 26IWBDD0021
and 26IWBDD0022 are anticipated from late November to Mid-December;
• An infill RC drilling program (approximately 1,000 m) to define the shallow up-dip
component of Domain C is underway, with results expected in early January.
• Follow-up air-core drilling across the Anders target (parallel to Arrakis)
will commence in late November.
Flushing Meadows (MRE 268koz @ 1.1g/t Au, see Table 1)
• Assays from the air-core drilling completed over the broader Flushing Meadows
and parallel Giedi Prime target areas are anticipated in November;
• A small RC drilling program to test for steep west-dipping structures at Flushing
Meadows will commence in the coming weeks.
Broad-scale IWB Soil sampling program
• A soil sampling program has commenced across the southern half of the IWB
Gold Project, including the New England Granite;
• Samples will be submitted for UltraFine+ multi-element analysis, and results will be
used to support target generation over the wider IWB Gold Project.
Authorised by the Board of Yandal Resources
Eduard Eshuys
Chair
Yandal Resources Limited
yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL 13
About Yandal Resources Limited
Yandal Resources has a portfolio of advanced gold exploration projects in the highly prospective Yandal
and Norseman-Wiluna Greenstone Belts of Western Australia.
Ironstone Well-Barwidgee Gold Project
The 100% owned Ironstone Well-Barwidgee (IWB) Gold Project covers approximately 456km² of highly
prospective and under-explored tenure located between the Jundee and Bronzewing mines in the
northern Yandal Greenstone Belt. Yandal has an established Resource of 268,000oz of gold at Flushing
Meadows (within IBW) and considers there to be strong potential to make new discoveries and expand
this resource base within its extensive tenure holding. (Refer to the ASX announcement of 4 November
2020 and Table 1 for details of the Flushing Meadows Resource).
The IWB project area also includes two new gold discoveries, the Arrakis and Siona Prospects, both made
within the last two years. These outcomes were driven by the execution of a targeted exploration
program that followed a systematic, geologically driven strategy that was developed in early 2023. The
Arrakis Prospect is hosted within the Caladan fold, and the Siona Prospect is hosted within the New
England Granite.
Both discoveries are currently at an early stage but progressing well, with future activities focused on
delineating the scale of each of the newly defined mineralised systems.
The IWB Gold Project also includes several advanced prospects, where limited historic and YRL drilling has
returned robust gold intercepts, indicating the potential for shallow oxide mineralisation. Both the early-
stage and more advanced prospects are the focus of ongoing exploration.
Mt McClure
The Mt McClure Gold Project, acquired in August 2022, is located ~15 km southwest of the historic
Bronzewing Mine and includes three mining leases with JORC 2012 Resources totalling 182,200oz Au (see
Table 1).
The project has prospectivity for new shallow gold deposits adjacent to current Resources and in the
footwall and hanging wall of the stratigraphy. Ground gravity survey data support ongoing
structural/stratigraphic interpretations for 2027 targeting.
yandalresources.com.au | ASX:YRL 14
Figure 9: Yandal Resource exploration Project locations within the Yandal Greenstone Belt.
The Arrakis Prospect is located within the Caladan target area.
King of the Hills
Thunder Box
Darlot
Bellevue
Kathleen Valley
Mt Keith
Wiluna
Jundee
Bronzewing
Wiluna
Leinster
New England Granite
Siona Discovery
Flushing Meadows
Deposit 268koz
Caladan Target area
Arrakis Discovery
50km
Ironstone Well-
Barwidgee Gold Project
Mt McClure Gold
Project 182koz
Dingo Range Project
yandalresources.com.au | ASX:YRL 15
Table 1 – Yandal Resources Ltd - Mineral Resource Summary
Deposit
Indicated Inferred Total
Tonnes
(‘000s)
Grade
(g/t)
Au
(oz)
Tonnes
(‘000)
Grade
(g/t)
Au
(oz)
Tonnes
(000’s)
Grade
(g/t)
Au
(Oz)
Ironstone Well
Flushing Meadows1 2,141 1.3 91,000 5,245 1.1 177,000 7,386 1.1 268,000
Mt McClure
Challenger2 718 1.9 44,000 718 1.9 44,000
Success3 1,255 1.9 75,000 1,255 1.9 75,000
Parmelia4 252 2.1 17,000 252 2.1 17,000
HMS Sulphur5 1010 1.2 39,000 1010 1.2 39,000
Gilmore6 134 1.7 7,200 134 1.7 7,200
Sub-total - MMC 3,369 1.7 182,200 3,369 1.7 182,200
Grand-total7 2,141 1.3 91,000 8,614 1.3 359,200 10,755 1.3 450,200
Due to the effects of rounding, totals may not represent the sum of the individual components.
1. Reported above 0.5g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 4 November 2020 for full
details. 2. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 22 August 2022 for
full details 3. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 6 September
2022 for full details. 4. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 20
September 2022 for full details. 5. Reported above 0.5g/t Au lower cut-off grade within this announcement 6. Reported above 1.0g/t
Au lower cut-off grade within this announcement. 7. All Resources are reported as global estimates, not constrained by optimised pit
shells.
Competent Person Statement
The information in this document related to Exploration Targets and Exploration Results, geology and data
compilation is based on information reviewed or compiled by Mr Christopher Oorschot, a Competent
Person who is a Member of The Australasian Institute of Geoscientists. Mr Oorschot is the CEO of the
Company, is a full-time employee and holds shares and options in the Company. Mr Oorschot has sufficient
experience, which is relevant to the style of mineralisation and type of deposit under consideration, and
to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of
the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Oorschot consents to the inclusion in this announcement of the matters based on this information in the
form and context in which it appears.
The information in this announcement that relates to the Flushing Meadows and Mt McClure Mineral
Resource Estimates is based on information compiled and generated by Andrew Bewsher, an employee
of BM Geological Services Pty Ltd (“BMGS”). Both Andrew Bewsher and BMGS hold shares in the company.
BMGS consents to the inclusion, form and context of the relevant information herein as derived from the
original resource reports. Mr Bewsher has sufficient experience relevant to the style of mineralisation and
type of deposit under consideration and to the activity which is being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the JORC ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’.
YRL confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
yandalresources.com.au | ASX:YRL 16
Forward Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include, but
are not limited to, statements concerning Yandal Resources Limited’s (Yandal’s) current expectations,
estimates and projections about the industry in which Yandal operates, and beliefs and assumptions
regarding Yandal’s future performance. When used in this document, words such as “anticipate”, “could”,
“plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are
forward-looking statements. Although Yandal believes that its expectations reflected in these forward-
looking statements are reasonable, such statements are subject to known and unknown risks, uncertainties
and other factors, some of which are beyond the control of Yandal, and no assurance can be given that
actual results will be consistent with these forward-looking statements. Drilling results presented indicate
geological potential for mineralisation, but there can be no certainty that these results will eventually form
part of a Mineral Resource Estimate.
Table 2 – Arrakis Diamond drilling collar location summary; please note that three holes have
diamond tails. The coordinates below are derived from a handheld GPS and are accurate to within
+/- 5m.
Hole ID
Hole
type
East
(m)
North
(m)
RL
(mAHD)
Azimuth
(degrees)
Dip
(degrees)
Total
Depth
(m)
z26IWBDD0018 DD 287586 7027307 525.2 223 -60 517.1
26IWBDD0019 DD 287486 7027330 525.3 225 -60 439.0
26IWBDD0020 DD 287321 7027458 524.0 225 -60 462.8
26IWBDD0021 DD 287282 7027567 523.3 225 -60 535.0
26IWBDD0022 DD 587759 7027272 522.9 225 -60 625.0
Table 3 – Arrakis Prospect - Summary of significant diamond core assay results >0.3g/t Au with no more
than 4m of continuous internal waste included unless otherwise stated. All intercept lengths are reported
as down-hole lengths.
Hole
ID
Sample
type / Sub
Interval
From
(m)
To
(m)
Interval
(m)
Au
(g/t)
Comment
26IWBDD0018 NQ2 450.6 495.0 44.4 1.3 Fresh Rock
26IWBDD0019 NQ2 391.2 409.0 17.8 2.5 Fresh rock
26IWBDD0019 Including 391.6 401.5 9.9 3.1 Fresh rock
26IWBDD0019 Including 403.0 405.9 2.9 3.1 Fresh rock
Table 4 – Completed Siona RC drilling program collar location summary. The coordinates
below are derived from a hand-held GPS and are accurate to within +/- 5m.
Hole ID
Hole
type
East
(m)
North
(m)
RL
(mAHD)
Azimuth
(degrees)
Dip
(degrees)
Total
Depth
(m)
26IWBRC0147 RC 295727 7013344 502.0 047 -60 122
26IWBRC0148 RC 295757 7013356 505.0 047 -60 132
yandalresources.com.au | ASX:YRL 17
Table 5 – Siona Prospect - Summary of significant diamond core and RC assay results >0.3g/t Au with no
more than 4m of continuous internal waste included unless otherwise stated. All intercept lengths are
reported as down-hole lengths.
Hole
ID
Sample
type / Sub
Interval
From
(m)
To
(m)
Interval
(m)
Au
(g/t)
Comment
26IWBRC0148 1m RC 47 59 12 0.6 Partially weathered
26IWBRC0148 Including 49 52 3 1.5 Partially weathered
26IWBRC0148 1m RC 83 84 1 0.5 Weakly weathered
26IWBRC0148 1m RC 92 93 1 0.4 Weakly weathered
26IWBRC0148 1m RC 101 102 1 1.3 Weakly weathered
26IWBRC0148 1m RC 106 107 1 0.3 Weakly weathered
26IWBRC0148 1m RC 110 125 15 0.4 Weakly weathered to fresh rock
26IWBRC0148 Including 113 114 1 1.9 Weakly weathered
26IWBRC0147 1m RC 102 103 1 0.5 Fresh rock
yandalresources.com.au | ASX:YRL 18
Relevant Previous Arrakis ASX Announcements
• Arrakis Results Extend Gold Mineralisation at Depth, 19 October 2026
• Diamond Drilling Recommences at Arrakis, 8 October 2026
• Drilling Results Extend High-Grade Gold Domain at Arrakis, 8 September 2026
• Arrakis Results Confirm New High-grade Domain, 25 August 2026
• Arrakis Returns 20m @ 8.7g/t Au from 84m, 10 August 2026
• Arrakis Diamond Drilling Confirms High-Grade Gold at Depth, 6 July 2026
• Gold Discoveries Expanding Across the IWB Project, 9 June 2026
• First Arrakis RC Results Extend High-grade Mineralisation, 28 April 2026
• 2026 Exploration Commences Across the IWB Gold Project, 23 March 2026
• Arrakis RC Results Show High-Grade Mineralisation Potential, 15 January 2026
• Arrakis Diamond Drilling Delivers Strong Results, 8 December 2025
• First Arrakis Diamond Results & RC Drilling Underway, 24 November 2025
• Final Arrakis RC Results with Diamond Drilling to Commence, 13 October 2025
• Arrakis Gold Discovery Extended by 400m, 24 September 2025
• Arrakis Gold Discovery Confirmed With 54m @ 1.2g/t Au, 22 September 2025
• Arrakis RC Drilling Complete & All AC Results Now Received, 17 September 2025
• RC Drilling Commences Across Arrakis, 1 September 2025
• Arrakis Extended to Over 2.2km in Strike, 18 August 2025
• Caladan AC Results Further Extend Arrakis Mineralisation, 31 July 2025
• Caladan AC Shows Early Signs of Scale, 10 July 2025
• Caladan Air-Core Drilling Program Commences, 5 June 2025
• RIU Sydney Presentation, 7 May 2025
• Arrakis RC Drilling Results, 30 April 2025
• Ironstone Well-Barwidgee Exploration Update, 25 February 2025
• Caladan Air-Core Drilling Demonstrates Discovery Potential, 15 January 2025
• Air-core Drilling Commences Across Caladan and Irulan, 10 October 2024
• Oblique Diamond Drilling Results, 3 September 2024
• IWB Soil Results and NEG Diamond Drilling Complete, 12 August 2024
• Large-scale Gold Anomalies Across Emerging Targets, 15 July 2024
• Gold Coast Investment Showcase Presentation, 20 June 2024
• Exploration Update – IWB Ground Gravity Survey, 11 June 2024
ASX Announcement 12 November 2026 Page 19
Appendix 1 – Ironstone Well-Barwidgee Gold Project, RC and Diamond Core Drilling
JORC Code (2012) Table 1, Sections 1 and 2
Mr Christopher Oorschot, CEO of Yandal Resources, compiled the information in Section 1 and Section 2 of the following JORC Table 1 and is the
Competent Person for those sections. The following Table and Sections are provided to ensure compliance with the JORC Code (2012 edition)
requirements for the reporting of Exploration Results.
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
Arrakis
• Yandal Resources has completed eight deep diamond core holes variably spaced over 600m
of strike across the Arrakis prospect. All diamond holes were drilled through the target interval
using an NQ2 diameter coring bit (core diameter of ~50.6mm). The core was halved with a
core saw, with the right-hand side (looking downhole) sampled. Before sampling, a company
geologist logs the core for lithology type, veining, alteration, and deformation. Sample lengths
vary according to logged geological intervals of interest, with a minimum of 0.2 metres and a
maximum of 1.0 metres. Sample quality is considered high.
Siona
• Yandal Resources has completed RC drilling at variably spaced lines across the Siona Prospect
to assess the distribution and continuity of shallow oxide mineralisation. The drilling involved a
139mm face-sampling bit down to depths between 103m and 222m. Holes were drilled at an
angle of -60 ° or vertical, at various azimuths.
Flushing Meadows
• Yandal Resources has completed diamond drilling across the Flushing Meadows deposit. The
drilling involved a mix of RC pre-collars down to fresh rock, followed by HQ (diameter of ~63.5
mm unless otherwise noted) diamond core drilling to an average down-hole depth of 437m
(between 337m and 490m). Holes were drilled at an angle of -60 ° to the southwest. The core
was halved with a core saw, with the right-hand side (looking downhole) sampled. Before
sampling, a company geologist logs the core for lithology type, veining, alteration, and
deformation. Sample lengths vary according to logged geological intervals of interest, with a
minimum of 0.2 metres and a maximum of 1.0 metres. Sample quality is considered high.
• Yandal Resources has completed RC drilling at a variable spacing around recently completed
diamond holes that are situated on 200m spaced lines. The drilling involved a 139mm face
sampling bit down to between 182m and 332m. Holes were drilled at an angle of -60 ° to the
southwest.
• Yandal Resources (YRL) RC drilling samples were collected via a rig-mounted static cone
splitter, splitting approximately 12.5% of the total sample volume. Two splits are collected for
each metre: a primary and a duplicate sample. The primary 1m samples are then sent to a lab
ASX Announcement 12 November 2026 Page 20
Criteria JORC Code explanation Commentary
for further analysis. The duplicate samples are retained on-site unless they are submitted as
routine duplicates.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• For YRL RC drilling, the cone splitter is regularly cleaned and inspected. The 1m bulk samples
are laid out in drill order. These bulk samples are regularly inspected for contamination, and
the volume of the bulk sample is monitored. These bulk samples are retained until all results are
received and may be used to collect additional field duplicates to verify lab results, logged
geology or any other form of analysis. If the bulk sample appears visually low in volume or
weight, this is recorded with the sample details. The same applies to damp or wet samples.
• Two splits are collected for each drilled metre: a primary and a secondary sample. The
Secondary sample is retained on-site and may be used to collect additional field duplicates
to verify lab results, logged geology or any other form of analysis.
• For YRL diamond drilling, sample recovery of each metre drilled was measured and recorded,
and high-resolution photos of each tray before cutting were obtained. The unsampled half of
the drill core is also retained. Intervals where the core is unoriented have been recorded.
• For YRL diamond drilling, when the core is cut for sampling, the same side of the core, relative
to the bottom-of-hole orientation mark, is collected for analysis. For intervals without an
orientation mark, the core is pieced together, and foliation or common structures are used to
approximately orient the core for sampling purposes.
• Structural observations have also been recorded where the diamond core is oriented, and the
core was routinely checked for any structures sub-parallel to the core axis.
Aspects of the determination of mineralisation that are
Material to the Public Report. In cases where ‘industry
standard’ work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was used to obtain
1 m samples from which 3 kg was pulverised to produce a
30 g charge for f
Share your feedback
Discover