Drilling Commences at Mt McClure
Released
Released
Announcement PDF
ASX Announcement
31 May 2023
Drilling Commences at Mt McClure
RC drilling campaign is centred on the HMS Sulphur discovery
and aims to define further growth potential
KEY POINTS
Reverse Circulation (RC) drilling program, comprising approximately 29 holes for
2,500m, has commenced at the Mt McClure Gold Project
Drilling aims to provide geological support for an initial Mineral Resource Estimate
(MRE) across the HMS Sulphur Prospect located directly north of the current Success
open pit Mineral Resource
HMS Sulphur is located on a granted mining lease approximately 10km south of
Northern Star’s (ASX: NST) +1Moz Orelia development
Results expected in July-August 2023
Commenting on the upcoming program, Yandal Resources’ Managing Director Mr Tim Kennedy
said: “This RC program follows on from RC drilling completed in the December quarter last year that
was designed to highlight areas with potential to add to our 136,000 ounce resource at Mt McClure.
HMS Sulphur is a stand-out target showing consistent shallow mineralisation over a 700m plus strike
length located immediately adjacent to our Success Resource. As with all of the Resources at Mt
McClure it has the added advantage of being located on granted mining leases and close to existing
haulage infrastructure. This drilling, which is designed to provide sufficient drill density to complete an
initial Mineral Resource Estimate, will also add to our geological knowledge and will potentially highlight
the presence of higher grade plunging shoots similar to those at the nearby +1Moz Orelia deposit being
developed by Northern Star (ASX:NST)”.
Registered Address
Board Members
Yandal Resources Limited
Tim Kennedy
Greg Evans
Katina Law
Greg Fitzgerald
ACN 108 753 608
A
P
ABN 86 108 753 608
Level 1, 5/62 Ord Street
West Perth WA 6005
PO Box 1104
Nedlands WA 6909
T
E
W
Gold Projects
Managing Director/CEO
Chair
Non-Executive Director
Company Secretary
+61 8 9389 9021
yandal@yandalresources.com.au
www.yandalresources.com.au
Ironstone Well (100% owned)
Barwidgee (100% owned)
Mt McClure (100% owned)
Gordons (100% owned)
Shares on Issue
Share Price
Market Cap
157,803,079
$0.076
$12.0M
Yandal Resources Ltd (ASX: YRL, “Yandal” or the “Company”) is pleased to advise that an RC
drilling program has commenced on its 100% owned Mt McClure Project aimed at growing the 136,000
ounce Resource inventory. The Mt McClure Project is located 15km SW of the historic Bronzewing
gold mine and 10km from the Orelia gold mine, both owned by Northern Star Resources Ltd (ASX:
NST) in the southern Yandal Belt (Figure 2).
During the September 2022 quarter, the Company completed initial Mineral Resource Estimates
(“MRE’s”) on the margins of the Success, Parmelia and Challenger historic open pits which resulted
in a combined Resource inventory of 2.225Mt @ 1.9g/t Au for 136,000oz at a 1.0g/t lower cut-off(1)
Drilling completed after the completion of the MRE confirmed a number of areas with the potential to
build on this initial Resource. The most advanced opportunity is the HMS Sulphur deposit located
immediately north and along strike to the Success deposit (Figures 1 & 2).
Sulphur was first targeted and drill tested by Yandal in 2021, returning a number of encouraging
intercepts such as 11m @ 2.6g/t Au from 73m, including 8m @ 3.3g/t Au (YRLRC401)(2). More recent
drilling has returned further positive results; 14m @ 1.5g/t Au from 113m (YRLRC1076)(3) and 11m @
1.5g/t Au from 64m (YRLRC1098)(4).
Previous drilling indicates relatively continuous mineralisation extending over a strike length of
approximately 700m from the near-surface. The mineralisation appears to occupy a common structure
or stratigraphic package that dips approximately 55° to the east. Weathering is relatively deep, with
top-of-fresh rock occurring around 125m vertically. Mineralisation has been identified to a vertical
depth of over 200m within fresh rock, where it remains open at depth. As with the nearby Success
and Orelia deposits, there is an indication of south plunging high-grade structural controls; however,
the current drill spacing remains too broad for this to be confirmed. The program will comprise
approximately 29 drill holes for 2,500m and will provide drill coverage at a nominal 50m by 50m
spacing across the current extents of mineralisation (see Figure 1).
Figure 1 – West facing long-section (north to the right-hand-side) from Success to HMS Sulphur
showing drill hole pierce points coloured by grade (g/t Au) multiplied by down-hole length (m). The area
to be tested by RC drilling (green dashes) and potential south plunging shoots (red arrows). For
Success, only the pierce points for the hanging-wall lode are displayed.
(1) Refer to ASX announcements of 22 August 2022, 6 September 2022 and 20 September 2022 (2) Refer to ASX announcement of 23
March 2021 (3) Refer to ASX announcement of 17 November 2022 (4) Refer to ASX announcement of 23 February 2023
ASX Announcement 31 May 2023
Page 2
Information from the program will assist in refining our geological understanding of the mineralisation
and is aimed at providing sufficient drill density to enable the completion of an initial Mineral Resource
Estimate at HMS Sulphur.
The program is expected to be completed by mid-June, with results available in July-August 2023.
Figure 2 – Location map of Mt McClure showing key prospects
and occurrences in relation to project tenure and regional geology
ASX Announcement 31 May 2023
Page 3
LOOKING AHEAD
The Company has a very active Q1-Q2 2023 planned with priority exploration activities, including;
1. Undertake RC drilling at HMS Sulphur at Mt McClure to enable an initial Mineral Resource
Estimate for that prospect.
2. Complete 3D modelling of historic and recent drilling data at Mt McClure to establish controls
on potential higher-grade plunging shoots for follow-up drill testing.
3. Interpretation of air-core drill results over structural and geochemical targets at Mt McClure and
Ironstone Well/Barwidgee.
4. Arrange access approval for drill testing targets at Ironstone Well/Barwidgee, including Quarter
Moon, Oblique and the New England prospects.
5. Follow-up of targets highlighted in the recent independent geological targeting studies at
Gordons (completed by Ben McCormack of Outlier Geoscience) and Ironstone Well/Barwidgee
(completed by Mike Outhwaite of Lithify Pty Ltd).
Authorised by the board of Yandal Resources
For further information please contact:
Tim Kennedy
Managing Director
Yandal Resources Limited
yandal@yandalresources.com.au
ASX Announcement 31 May 2023
Greg Fitzgerald
Company Secretary
+61 8 9389 9021
yandal@yandalresources.com.au
Page 4
About Yandal Resources Limited
Yandal Resources listed on the ASX in December 2018 and has a portfolio of advanced gold exploration projects in
the highly prospective Yandal and Norseman-Wiluna Greenstone Belts of Western Australia.
Yandal Resources’ gold project locations.
Yandal Resources Ltd - Mineral Resource Summary
Deposit
Ironstone Well
Flushing Meadows1
Mt McClure
Challenger2
Success3
Parmelia4
Sub-total - MMC
Gordons
Gordon’s Dam5
Grand-total6
Tonnes
(‘000s)
Indicated
Grade
(g/t)
Au
(oz)
1.3
91,000
2,141
2,141
1.3
91,000
Inferred
Grade
(g/t)
Au
(oz)
5,245
1.1
177,000
718
1,255
252
2,225
1.9
1.9
2.1
1.9
365
7,835
1.7
1.3
Tonnes
(‘000)
Total
Grade
(g/t)
Au
(Oz)
7,386
1.1
268,000
44,000
75,000
17,000
136,000
718
1,255
252
2,225
1.9
1.9
2.1
1.9
44,000
75,000
17,000
136,000
20,000
333,000
365
9,976
1.7
1.3
20,000
424,000
Tonnes
(000’s)
Due to the effects of rounding totals may not represent the sum of the individual components
1. Reported above 0.5g/t Au lower cut-off grade, refer to Yandal Resources Ltd ASX announcement dated 4 November 2020 for full
details. 2. Reported above 1.0g/t Au lower cut-off grade, refer to Yandal Resources Ltd ASX announcement dated 22 August 2022 for
full details 3. Reported above 1.0g/t Au lower cut-off grade, refer to Yandal Resources Ltd ASX announcement dated 6 September
2022 for full details.4. Reported above 1.0g/t Au lower cut-off grade, refer to Yandal Resources Ltd ASX announcement dated 20
September 2022 for full details 5. Reported above 1.0g/t Au lower cut-off grade, refer to Yandal Resources Ltd ASX announcement
dated 6 April 2023 for full details 6. All Resources are reported as global estimates, not constrained by optimised pit shells.
ASX Announcement 31 May 2023
Page 5
Competent Person Statement
The information in this document that relates to Exploration Results, geology and data compilation is based
on information reviewed or compiled by Mr Chris Oorschot, a Competent Person who is a Member of The
Australasian Institute Geoscientists. Mr Oorschot is the Exploration Manager for the Company, is a full-time
employee and holds options in the Company. Mr Oorschot has sufficient experience which is relevant to the
style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to
qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’. Mr Oorschot consents to the inclusion in this
announcement of the matters based on this information in the form and context in which it appears.
The information in this announcement that relates to the Flushing Meadows, Mt McClure and Gordons Dam
Mineral Resource Estimates is based on information compiled and generated by Andrew Bewsher, an
employee of BM Geological Services Pty Ltd (“BMGS”). Both Andrew Bewsher and BMGS hold shares in
the company. BMGS consents to the inclusion, form and context of the relevant information herein as
derived from the original resource reports. Mr Bewsher has sufficient experience relevant to the style of
mineralization and type of deposit under consideration and to the activity which is being undertaken to qualify
as a Competent Person as defined in the 2012 Edition of the JORC ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’.
YRL confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement. The company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
Forward Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include, but
are not limited to, statements concerning Yandal Resources Limited’s (Yandal’s) current expectations,
estimates and projections about the industry in which Yandal operates, and beliefs and assumptions
regarding Yandal’s future performance. When used in this document, words such as “anticipate”, “could”,
“plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are
forward-looking statements. Although Yandal believes that its expectations reflected in these forwardlooking statements are reasonable, such statements are subject to known and unknown risks, uncertainties
and other factors, some of which are beyond the control of Yandal and no assurance can be given that
actual results will be consistent with these forward-looking statements. Drilling results presented indicate
geological potential for mineralisation but there can be no certainty that these results will eventually form
part of a Mineral Resource Estimate
ASX Announcement 31 May 2023
Page 6
Share your feedback
Discover