Oblique RC Drilling Results
Released
Released
Announcement PDF
ASX Announcement
18 June 2024
Exploration Update
Oblique RC Drilling Confirms the Continuity of Wide Oxide Mineralisation within
the OBL01 Structure, and Further Extends Mineralisation to the North
•
All assay results have been received from the RC drilling program completed
across the Oblique Prospect in 2024 as part of a larger 4,500m RC and 2,800m
diamond drilling program.
•
The results confirm the continuity of broad and higher-grade mineralisation
associated with the OBL01 structure at the Oblique Prospect:
o
o
28m @ 1.1 g/t Au from 50m (24IWBRC0012),
including 4m @ 3.3g/t Au from 51m and
4m @ 2.1g/t Au from 71m
9m @ 1.8/t Au from 34m (24IWBRC0011),
•
RC drilling has again extended oxide mineralisation 150m to the north at Oblique
with:
o
o
•
including 1m @ 10.2g/t Au from 34m
7m @ 0.9 g/t Au from 47m (24IWBRC0018),
3m @ 1.4 g/t Au from 73m (24IWBRC0018),
These results are in addition to initial results (reported 29tt of April 2024) from the north
of Oblique suggestive of another mineralised structure and include:
o
15m @ 1.7g/t from 74m (24IWBRC0002)
including 3m @ 5.3g/t Au from 79m
•
The diamond drilling program at Oblique is progressing well. Four of five diamond
holes are complete, and the first diamond core samples will be dispatched for
analysis this week. Initial diamond logging has identified numerous intervals of
interest, with several different styles of veining and alteration observed.
•
Quarter Moon RC drilling results are expected in late June.
For further information or to ask questions in relation to this announcement, please visit our
Investor Hub at https://investorhub.yandalresources.com.au/link/mPqm8P
Contact Us
A: Level 1 Unit 5/62 Ord Street,
West Perth WA 6005
T: +61 (0)8 9389 9021
E: yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL
Board and Management
Tim Kennedy
Managing Director/CEO
Greg Evans
Non-Exec Chairman
Katina Law
Non-Exec Director
Chris Oorschot
Technical Director
Greg Fitzgerald
Company Secretary
Commenting on the new results, Yandal Resources’ Technical Director, Mr Chris Oorschot,
said: “The latest round of Oblique RC results are very encouraging. Closer spaced drilling
within and to the south of the OBL01 structure has confirmed the interpreted geometry and
mineralisation continuity of the structure. RC drilling results from the north of Oblique build on
the 15m @ 1.7g/t result from late April, displaying similar geological characteristics to the
OBL01 structure 500m to the south.
While we were receiving these results, diamond drilling has been progressing well, with the
team focused on collecting detailed information concerning stratigraphy, structure,
alteration and geological timing relationships that will provide invaluable context to assay
results and allow an effective evaluation of the Oblique Prospect’s broader potential.
The Yandal exploration team is well placed to realise larger-scale discovery opportunities
across the Ironstone Well-Barwidgee Gold Project as we head into the second half of 2024
with the ongoing diamond drilling program, combined with some exceptional conceptual
targets derived from the recently acquired ground gravity data and the soon to be received
regional soil results.”
Yandal Resources Ltd (ASX: YRL, “Yandal Resources” or the “Company”) is pleased to advise that
it has received all assay results from the eighteen holes completed across the Oblique Prospect,
part of a larger 4,500m program across both the Oblique and Quarter Moon Prospects. The
Oblique and Quarter Moon (E 53/1882) Prospects form part of the broader Ironstone Well–
Barwidgee (IWB) Gold Project (see Figure 8).
In addition to drilling results, the Company has completed four of five diamond holes across the
Oblique Prospect. The first batch of diamond core samples is scheduled to be dispatched to the
lab for analysis this week.
The Company is well-funded and focused on making significant gold discoveries on its portfolio
of highly prospective 100% owned gold projects in the Yandal and Norseman-Wiluna Greenstone
Belts in Western Australia.
RC Drilling Results
The 2024 Oblique RC program comprised 2,450m of drilling for a total of 18 holes (including
five diamond pre-collars with 516m drilled). Results from all RC holes have been received.
The holes were designed to identify OBL01 parallel structures to the north, then test the
continuity and extend drilling within the OBL01 mineralised structure (see Figure 1). RC drilling
was successful in achieving both objectives.
Significant intercepts are summarised below, illustrated in Figures 1 to 6 below, and listed in
Tables 1 and 2 at the end of this document.
yandalresources.com.au | ASX:YRL
2
Drilling to the north of Oblique has confirmed an OBL01-like structure up to 650m from any
previous drilling completed by the Company in 2023. Notable intercepts include:
•
15m @ 1.7 g/t Au from 74m in 24IWBRC0002 (Figure 3) (previously reported on the 29tt of April
2024)
o
including 3m @ 5.3g/t Au from 79m
And
•
7m @ 0.9 g/t Au from 47m (Figure 4) and
•
3m @ 1.4 g/t Au from 73m both from 24IWBRC0018,
These results suggest that mineralisation is associated with a dextral offset in stratigraphy
(based on historic surface mapping) and the core of the large-scale magnetic anomaly
coincident with the prospect (See Figure 1).
RC drilling within and to the south of the OBL01 structure resulted in several intercepts,
including:
•
28m @ 1.1 g/t Au from 50m in 24IWBRC0012 (Figure 6)
o
o
including 4m @ 3.3g/t Au from 51m and
4m @ 2.1g/t Au from 71m
This result extends oxide mineralisation 50m south of the previously reported:
•
24m @ 1.8g/t Au from 60m in YRLRC1177 (previously reported on the 12tt of January 2024)
Results such as:
•
9m @ 1.8/t Au from 34m in 24IWBRC0011 (Figure 5)
o
including 1m @ 10.2g/t Au from 34m
•
7m @ 0.8g/t Au from 20m, and
•
4m @ 1.3g/t Au from 76m in 24IWBRC0011 (a vertical hole)
confirm mineralisation continuity within the interpreted OBL01 structure, which is associated with
a wide interval of oxidised and deformed quartz veining and/or microcrystalline chert with
evidence of strong alteration, including sulphide alteration (now oxidised).
The results build on previous RC drilling completed in October 2023 (see ASX releases of 25
October 2023, 12 January 2024, and 29 April 2024). Once the diamond drilling phase of the
program testing the broader mineralised system at Oblique has been completed (refer to
section below), our mineralisation model for the prospect will be updated, and further drill
testing is planned.
yandalresources.com.au | ASX:YRL
3
Oblique Diamond Drilling
Diamond drilling commenced on May 24th at the Oblique Prospect and underpins the
Company’s strategy to understand the broader potential of the Oblique mineralised system.
Four of five planned diamond holes have been completed, which will test the stratigraphy
and structures along an 800m strike length, providing invaluable insights into the structural,
stratigraphy, and alteration styles across Oblique. Figure 2 highlights the projected pierce
points of diamond drilling within the OBL01 structure.
Preliminary logging indicates that the stratigraphy is dominated by a bimodal sequence of
variably altered fine-grained andesite and an intermediate tuff characterised by medium to
coarse-grained volcanic laths.
Several different styles of structure and alteration have been observed, including:
• Altered and sulphide-bearing shear zones (figure 7A),
•
Deformed quartz veining (Figure 7B),
•
Massive to semi-massive pyrite dominant sulfides typically adjacent to or containing
quartz veining and/or microcrystalline cherts. Equivalent sulphide alteration has been
observed in RC drilling previously and is typically correlated with low-level anomalous
gold values only (figure 7C).
Samples from the first diamond hole are being cut and sampled and scheduled to be
dispatched for analysis this week.
Next Steps
The diamond rig is likely to finish at Oblique in the next week. It will then move to the Quarter
Moon Prospect before mobilising down to the New England Granite Prospect to complete
two co-sponsored Exploration Incentive Scheme (EIS) holes in late June through early July.
Follow-up drilling at Oblique is being assessed and will be finalised and scheduled once all
diamond core results have been received.
yandalresources.com.au | ASX:YRL
4
15m @ 1.7 g/t Au
Incl. 3m @ 5.3 g/t Au
24IWBRD0005
24IWBRD0009
7m @ 0.9 g/t Au
24IWBRD0013
24IWBRD0014
24IWBRD0016
5m @ 1.0 g/t Au
9m @ 1.8g/t Au
Incl. 1m @ 10.4g/t Au
7m @ 1.2 g/t Au
28m @ 1.1 g/t Au
Incl. 4m @ 3.3g/t Au
& 4m @ 2.1g/t Au
Figure 1: A Collar plan for the Oblique Prospect displaying all drilling collars, colour-coded by max
Au in hole (g/t Au), overlying a composite aerial magnetic image e (RTP 1VD non-linear and RTP
2VD non-linear). Diamond pre-collars and section/longitudinal section positions are labelled.
yandalresources.com.au | ASX:YRL
5
Figure 2: Longitudinal section, southwest facing, showing intercepts within the OBL01 structure and
thematically contoured by grade (g/t Au) multiplied by down-hole width (m). The planned position of
diamond hole pierce points within the OBL01 structure are also shown.
yandalresources.com.au | ASX:YRL
6
SW
NE
Surface
7m @ 0.9 g/t Au
3m @ 1.4 g/t Au
BOCO
TOFR
Figure 3: Cross-section A, showing RC drilling results from 24IWBRC0007 and 24IWBRC0018, with a
preliminary interpretation of mineralisation. The location of section A is referenced in Figure 1.
yandalresources.com.au | ASX:YRL
7
SW
NE
Surface
3m @ 1.5 g/t Au
15m @ 1.7 g/t Au
Incl. 3m @ 5.3 g/t Au
TOFR
Figure 4: Cross-section B, showing RC drilling results from 24IWBRC0001 and 24IWBRC0002
(previously reported in April 2024), with a preliminary interpretation of mineralisation. The location of
section B is referenced in Figure 1.
yandalresources.com.au | ASX:YRL
8
SW
NE
24m @ 1.8 g/t Au
Surface
5m @ 1.0 g/t Au
OBL01
Structure
16m @ 0.4 g/t Au
BOCO
TOFR
7m @ 1.2 g/t Au
9m @ 1.8g/t Au
Incl. 1m @ 10.4g/t Au
2m @ 5.8 g/t Au
Figure 5: Cross-section C, showing RC drilling results from 24IWBRC0011 and YRLRC1177
(previously reported in January 2024), with a preliminary interpretation of mineralisation. The trace of
the recently completed diamond hole 24IWBRD0013 is also plotted on the section (not yet sampled)
The interpreted OBL01 structure is labelled in the section. The location of section B is referenced in
Figure 1.
yandalresources.com.au | ASX:YRL
9
SW
NE
Surface
12m @ 1.2 g/t Au
28m @ 1.1 g/t Au
Incl. 4m @ 3.3g/t Au
& 4m @ 2.1g/t Au
OBL01
Structure
9.1m @ 0.9 g/t Au
TOFR
25m @ 0.6 g/t Au
Figure 6: Cross-section D, showing RC drilling results from 24IWBRC0012 and 24IWBRC0002
(previously reported in April), with a preliminary interpretation of mineralisation. The interpreted OBL01
structure is labelled in the section. The location of section B is referenced in Figure 1.
yandalresources.com.au | ASX:YRL
10
A
24IWBRD0005 207m
B
24IWBRD0005 291.7m
C
24IWBRD0009 circa 286m to 289.5m
Figure 7: A. An example of an altered shear zone within NQ2 core 24IWBRD0005. B. An example
of a deformed and altered early quartz veining within NQ2 core from 24IWBRD0005. C An example
of massive to semi-massive sulphide (pyrite dominant) intercalated with narrow quartz veins and/or
micro-crystalline chert within NQ2 core from 24IWBRD0009.
yandalresources.com.au | ASX:YRL
11
Oblique
Flushing
Meadows
Quarter
Moon
New England
Granite
Figure 8: The Ironstone Well / Barwidgee Project overview shows the outline of YRL tenure,
regional interpreted bedrock geology, and the location of prospects discussed in this report. The
red circle with a 5km radius highlights the proximity between the Flushing Meadows Deposit and
the Oblique and Quarter Moon Prospects.
yandalresources.com.au | ASX:YRL
12
Looking Ahead
The Company has a very active CY 2024 planned with priority exploration activities,
including;
1.
Regional soil sampling results are anticipated shortly and will be released once these
large datasets have been processed and a preliminary interpretation completed;
2.
Receiving RC results for the Quarter Moon prospect in the latter half of June,
3.
The completion of diamond drilling at Oblique and the start of diamond drilling at the
Quarter Moon Prospect, with initial assay results expected in early July;
4.
The mobilisation of the diamond rig to the New England Granite Prospect in late June
to early July.
5.
An assessment of historical exploration work across the recently identified conceptual
targets, including the Caladan Fold and Irulan Dolerite Complex, derived from the 2024
ground gravity survey across the Ironstone Well-Barwidgee Gold Project, is underway
(see ASX announcement dated 11 June 2024).
Authorised by the board of Yandal Resources
For further information, please contact:
Tim Kennedy
Managing Director
Yandal Resources Limited
yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL
Greg Fitzgerald
Company Secretary
+61 8 9389 9021
yandal@yandalresources.com.au
13
About Yandal Resources Limited
Yandal Resources has a portfolio of advanced gold exploration projects in the highly prospective Yandal
and Norseman-Wiluna Greenstone Belts of Western Australia.
Yandal Resources’ gold project locations.
Yandal Resources Ltd - Mineral Resource Summary
Indicated
Inferred
Deposit
Tonnes Grade
Au
Tonnes
Grade
Au
(‘000s)
(g/t)
(oz)
(‘000)
(g/t)
(oz)
Ironstone Well
Flushing Meadows1
2,141
1.3
91,000
5,245
1.1
177,000
Mt McClure
Challenger2
718
1.9
44,000
3
Success
1,255
1.9
75,000
Parmelia4
252
2.1
17,000
5
HMS Sulphur
1010
1.2
39,000
6
Gilmore
134
1.7
7,200
Sub-total - MMC
3,369
1.7
182,200
Gordons
Gordons Dam7
365
1.7
20,000
2,141
Grand-total8
8,979
1.3
379,200
1.3
91,000
Total
Tonnes
(000’s)
Grade
(g/t)
Au
(Oz)
7,386
1.1
268,000
718
1.9
44,000
1,255
1.9
75,000
252
2.1
17,000
1010
1.2
39,000
134
3,369
1.7
1.7
7,200
182,200
365
1.7
20,000
11,120
1.4
470,200
Due to the effects of rounding, totals may not represent the sum of the individual components.
1. Reported above 0.5g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 4 November 2020 for full
details. 2. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 22 August 2022 for full
details 3. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 6 September 2022 for
full details.4. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 20 September 2022
for full details 5. Reported above 0.5g/t Au lower cut-off grade within this announcement 6. Reported above 1.0g/t Au lower cut-off
grade within this announcement 7. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement
dated 6 April 2023 for full details 8. All Resources are reported as global estimates, not constrained by optimised pit shells.
yandalresources.com.au | ASX:YRL
14
Competent Person Statement
The information in this document related to Exploration Targets and Exploration Results, geology and data
compilation is based on information reviewed or compiled by Mr Christopher Oorschot, a Competent
Person who is a Member of The Australasian Institute Geoscientists. Mr Oorschot is the Exploration Manager
and Technical Director for the Company, is a full-time employee and holds shares and options in the
Company. Mr Oorschot has sufficient experience which is relevant to the style of mineralisation and type
of deposit under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Mr Oorschot consents to the inclusion in this announcement of the matters
based on this information in the form and context in which it appears.
The information in this announcement that relates to the Flushing Meadows, Mt McClure and Gordons Dam
Mineral Resource Estimates is based on information compiled and generated by Andrew Bewsher, an
employee of BM Geological Services Pty Ltd (“BMGS”). Both Andrew Bewsher and BMGS hold shares in
the company. BMGS consents to the inclusion, form and context of the relevant information herein as
derived from the original resource reports. Mr Bewsher has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration and to the activity which is being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the JORC ‘Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves’.
YRL confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement. The company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
Forward Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include, but
are not limited to, statements concerning Yandal Resources Limited’s (Yandal’s) current expectations,
estimates and projections about the industry in which Yandal operates, and beliefs and assumptions
regarding Yandal’s future performance. When used in this document, words such as “anticipate”, “could”,
“plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are
forward-looking statements. Although Yandal believes that its expectations reflected in these forwardlooking statements are reasonable, such statements are subject to known and unknown risks, uncertainties
and other factors, some of which are beyond the control of Yandal and no assurance can be given that
actual results will be consistent with these forward-looking statements. Drilling results presented indicate
geological potential for mineralisation but there can be no certainty that these results will eventually form
part of a Mineral Resource Estimate.
yandalresources.com.au | ASX:YRL
15
Table 1 – Oblique RC collar location summary for this release. Note that grey text represents results
that have previously been released on 29/4/2024)
Prospect
Hole ID
Hole type
Oblique
Oblique
Oblique
Oblique
Oblique
Oblique
Oblique
Oblique
Oblique
Oblique
Oblique
Oblique
Oblique
Oblique
Oblique
Oblique
Oblique
24IWBRC0001
24IWBRC0002
24IWBRC0003
24IWBRC0004
24IWBRD0005
24IWBRC0007
24IWBRC0008
24IWBRD0009
24IWBRC0010
24IWBRC0011
24IWBRC0012
24IWBRD0013
24IWBRD0014
24IWBRC0015
24IWBRD0016
24IWBRC0017
24IWBRC0018
RC
RC
RC
RC
RC Pre-Collar
RC
RC
RC Pre-Collar
RC
RC Water Bore
RC
RC Pre-Collar
RC Pre-Collar
RC
RC Pre-Collar
RC
RC
East
(m)
274413
274449
274464
274542
274603
274372
274523
274755
274630
274720
274781
274825
274948
275123
275184
275305
274339
North
RL
Azimuth
Dip
(m)
(mAHD)
(degrees)
(degrees)
7035823
7035867
7035729
7035822
7035657
7036011
7035487
7035612
7035301
7035249
7035249
7035376
7035216
7035032
7035108
7035099
7035970
542
541
543
542
545
542
546
545
545
544
544
546
543
538
539
538
543
219
221
218
220
223
223
223
220
360
225
221
223
223
222
218
219
224
-59
-61
-61
-60
-60
-60
-60
-60
-90
-60
-61
-61
-59
-60
-62
-61
-60
Total
Depth
(m)
174
134
174
136
114
180
222
102
100
120
150
90
102
186
108
180
162
Table 2 – Oblique - Summary of significant RC drilling assay results >0.3g/t Au with no more than 2m
of continuous internal waste included unless otherwise stated. Note that grey text represents results
that have previously been released on 29/4/2024.
Hole
ID
24IWBRC0001
24IWBRC0002
24IWBRC0002
24IWBRC0002
24IWBRC0003
24IWBRC0003
24IWBRC0003
24IWBRC0003
24IWBRC0004
24IWBRC0004
24IWBRD0005
24IWBRD0007
24IWBRC0008
24IWBRD0009
24IWBRC0010
24IWBRC0010
24IWBRC0010
24IWBRC0010
24IWBRC0010
Sample
type / Sub
Interval
1m RC
1m RC
Including
Including
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
From
(m)
To
(m)
Interval
(m)
Au
(g/t)
Comment
66
74
78
79
65
76
85
163
97
114
14
NSA
NSA
NSA
15
20
39
61
66
69
89
86
82
66
79
86
164
100
118
15
3
15
8
3
1
3
1
1
3
4
1
1.5
1.7
2.7
5.3
0.6
0.8
0.5
0.5
0.5
0.4
0.5
Oxide
Transitional
Transitional
Transitional
Oxide
Oxide
Oxide
Oxide
Transitional
Fresh
Oxide
16
27
41
62
67
1
7
2
1
1
0.9
0.8
0.4
0.5
0.3
OBL01, Oxide
OBL01, Oxide
OBL01, Oxide
OBL01, Oxide
OBL01, Oxide
yandalresources.com.au | ASX:YRL
16
Hole
ID
24IWBRC0010
24IWBRC0010
24IWBRC0010
24IWBRC0011
24IWBRC0011
24IWBRC0011
24IWBRC0011
24IWBRC0011
24IWBRC0012
24IWBRC0012
24IWBRC0012
24IWBRC0012
24IWBRC0012
24IWBRC0012
24IWBRC0012
24IWBRC0012
24IWBRC0012
24IWBRC0013
24IWBRD0014
24IWBRC0015
24IWBRC0015
24IWBRC0015
24IWBRC0015
24IWBRC0015
24IWBRC0015
24IWBRD0016
24IWBRC0017
24IWBRC0018
24IWBRC0018
24IWBRC0018
24IWBRC0018
Sample
type / Sub
Interval
1m RC
1m RC
1m RC
1m RC
1m RC
Including
1m RC
1m RC
1m RC
Including
Including
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
1m RC
From
(m)
To
(m)
Interval
(m)
Au
(g/t)
Comment
73
76
93
19
34
34
51
89
50
51
71
96
102
117
123
132
139
1
90
86
93
106
111
136
181
NSA
NSA
47
58
73
83
74
80
97
24
43
35
53
96
78
55
75
97
105
118
124
134
140
2
102
87
94
107
116
140
182
1
4
4
5
9
1
2
7
28
4
4
1
3
1
1
2
1
1
12
1
1
1
5
4
1
0.3
1.3
0.5
1.0
1.8
10.2
0.6
1.2
1.1
3.3
2.1
0.4
0.5
0.3
0.5
0.4
1.9
0.5
0.4
1
1.8
2.4
0.7
0.6
0.9
OBL01, Oxide
OBL01, Oxide
Oxide
OBL01, Oxide
OBL01, Oxide
Oxide
Oxide
Oxide
OBL01, Oxide
Oxide
Oxide
Oxide
Oxide
Oxide
Oxide
Transitional
Fresh
Transported
Transitional
Oxide
Oxide
Transitional
Fresh
Fresh
Fresh
54
59
76
84
7
1
3
1
0.9
0.7
1.4
0.4
Oxide
Transitional
Transitional
Transitional
yandalresources.com.au | ASX:YRL
17
Appendix 1 – Ironstone Well-Barwidgee Gold Project
JORC Code (2012) Table 1, Sections 1 and 2
Mr Christopher Oorschot, Exploration Manager and Technical Director of Yandal Resources, compiled the information in Section 1 and Section 2 of the
following JORC Table 1 and is the Competent Person for those sections. The following Table and Sections are provided to ensure compliance with the
JORC Code (2012 edition) requirements for the reporting of Exploration Results.
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
•
•
•
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
•
•
Aspects of the determination of mineralisation that are
Material to the Public Report. In cases where ‘industry
standard’ work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was used to obtain
1 m samples from which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is
ASX Announcement 18th June 2024
•
Yandal Resources (YRL) RC Samples were collected via a rig-mounted static cone splitter,
splitting approximately 12.5% of the total sample volume. Two splits are collected for each
metre: a primary and duplicate sample. The primary 1m samples are then sent to a lab for
further analysis. The duplicate samples are retained on-site unless they are submitted as routine
duplicates.
For historical RC drilling, sampling practices by previous operators are assumed to be industry
standard at that time. Sampling procedures would be comparable to those applied by Yandal
Resources as per the above but with variations in the type of splitter used, etc.
Historic core sampling procedures are unknown and are assumed to be industry standard at
that time. Historic core samples have not been retained by the project and are unavailable
for review.
For YRL RC drilling, the cone splitter is regularly cleaned and inspected. The 1m bulk samples
are laid out in drill order. These bulk samples are regularly inspected for contamination, and
the volume of the bulk sample is monitored. These bulk samples are retained until all results are
received and may be used to collect additional field duplicates to verify lab results, logged
geology or any other form of analysis. If the bulk sample appears visually low in volume or
weight, this is recorded with the sample details. The same applies to damp or wet samples.
Two splits are collected for each drilled metre: a primary and a secondary sample. The
Secondary sample is retained on-site and may be used to collect additional field duplicates
to verify lab results, logged geology or any other form of analysis
For all results, RC drilling was used to obtain 1m samples from which a portion, between 1-3kg
in weight, was crushed and pulverised to produce a 50g charge for fire assay with an AAS
(atomic absorption spectroscopy) finish for gold determination with a 0.01ppm detection limit.
Page 18
Criteria
JORC Code explanation
Commentary
coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed information.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (e.g. core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type, whether
core is oriented and if so, by what method, etc).
•
•
For YRL RC drilling, a 139mm diameter face sampling bit and hammer was used.
For historical RC drilling, a 5’ ¼ inch face sampling bit and hammer was used.
Drill sample
recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.
•
For YRL holes, RC drilling recoveries are visually assessed by the supervising geologist, and any
low-volume or weight samples are recorded, along with any damp or wet samples. Drill depths
are routinely verified at the completion of each drill rod (every 6m). The cone splitter is checked
for each drill site to ensure it is completely upright and level. Sample collection from the splitter
by drilling off-siders is monitored for any inefficiencies. For deeper holes, larger drilling
equipment is used, with boosted air pressure, to ensure samples are recovered and
groundwater is reasonably controlled as much as reasonably possible.
There is currently not enough data to assess if lower sample recoveries produce a sampling
bias within deeper drilling, noting that major shears bear water and volume loss is associated
with these structures. The Company aims to assess this through the use of diamond drilling.
For historic RC drilling, exact records of measures applied to manage or monitor sample
recoveries have not been preserved. It is assumed that previous project operators used industry
standard procedures comparable to those used by YRL above.
For YRL drilling, all RC holes have been logged in full by a qualified and experienced geologist.
RC chips and fines from each 1m interval drilled are inspected and logged for colour,
weathering, lithology, deformation, veining and mineralisation. All 1m samples are wet-sieved
and retained in labelled and annotated chip trays. Chip trays are stored on-site for review and
transported to Perth for long-term storage. The quality of logging information is considered
sufficient to support appropriate Mineral Resource Estimation studies.
Historic geological logging is limited in detail but provides sufficient information regarding
lithology, weathering, and mineralisation. It is assumed that previous project operators used
industry standard logging procedures comparable to those used by YRL above.
Data captured through geological logging by a geologist is qualitative in nature.
In addition to geological logging, the magnetic susceptibility of each interval is measured using
a KT-10 magnetic susceptibility metre, with a sensitivity of 1x10-6 SI Units. Magnetic susceptibility
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
•
•
Logging
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
ASX Announcement 18th June 2024
•
•
•
•
Page 19
Criteria
JORC Code explanation
Commentary
Sub-sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter, half or
all core taken.
•
If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected, including
for instance results for field duplicate/second-half
sampling.
•
•
•
•
readings are quantitative in nature.
YRL RC drilling utilised a rig-mounted cone splitter installed directly below and in line with the
rig-mounted cyclone. Two 1-3kg sub-samples are collected into calico bags labe
Share your feedback
Discover