Exploration Program Update:
Gold Discoveries Expanding Across Multiple Fronts
Arrakis Drilling Highlights
• Yandal has received further assay results from RC drilling completed across
the Arrakis gold discovery.
• Significant Intercepts from the extensional RC drilling include:
o 13m @ 1.6g/t Au from 206m in 26IWBRC0069m (ETW*1 11m), including
8m @ 2.2g/t Au from 210m,
o 11m @ 1.7g/t Au from 84m in 26IWBRC0100 (ETW*1 10m), including
6m @ 2.8g/t Au from 84m, and
o 3m @ 1.2g/t Au from 214m in 26IWBRC0089
• Targeted RC infill drilling on the 6,250mN section has intercepted
mineralisation in all holes, including:
o 11m @ 1.3g/t Au from 236m in 26IWBRC0102 (ETW*1 10m), including
3m @ 1.8g/t Au from 237 and 2m @ 3.2g/t Au from 245m and
o 4m @ 2.1g/t Au from 29m in 26IWBRC0091 (ETW*1 3m)
• RC drilling targeting the offset continuation of the Arrakis structure to the
south-east has visually identified comparable stratigraphy to Arrakis that
hosts several structures of interest over 600m of strike with assays pending.
Flushing Meadows Diamond Drilling
• Six of the eight diamond holes drilled have been completed below the
Flushing Meadows 268koz Mineral Resource Estimate.
• Geological observations from the diamond core indicate Flushing
Meadows mineralised structures continue down dip into fresh rock.
Flushing Meadows and Giedi Prime Air-core Program
• The 10,000m air-core program utilising 800m spaced lines across the
broader Flushing Meadows and Giedi Prime target areas has commenced.
ASX Announcement
9 June 2026
*1 ETW - Estimated True Width
For further information or to ask questions in reaction to this announcement, please
visit our Investor Hub at https://yandalresources.com.au/link/eoLjdr
yandalresources.com.au | ASX:YRL 2
Commenting on the extensional results and geological observations from drilling, Yandal
Resources’ Managing Director, Mr. Chris Oorschot, said: “Yandal’s exploration strategy has
always been centred around defining mineralised systems of scale. At Arrakis, we have
been focusing on delineating the south-east continuation of the mineralised Arrakis
structure beyond a large north-south offsetting structure that was confirmed in the early
stages of the current RC program. Based on visual observations, we have identified a
similar stratigraphic position to the Arrakis system further to the northeast and we’ve also
observed structures of interest occupying the target position. Samples from this line have
been dispatched to the lab for priority analysis.
RC results from within the currently defined extents of the Arrakis mineralised system are
beginning to define several potential high-grade trends. We hove to refine this further as
more results are received over the coming month. Understanding the geometry of high-
grade mineralisation will be critical for developing deeper exploration targets.
Our diamond drilling program across the Flushing Meadows deposit has provided the first
systematic opportunity to understand the fresh rock geology and mineralisation host of the
strike extensive system. Geological observation from the first six diamond holes indicates
that there is potential for numerous sub-parallel mineralised structures both in the hanging-
wall and footwall of the currently defined Flushing Meadows deposit. Significantly, these
positions have not been tested near surface and offer a significant opportunity to build on
the current 268koz Mineral Resource should these logged intervals of deformation and
alteration host significant gold mineralisation. We have prioritised the processing of our first
diamond hole at Flushing Meadows, 26IWBRC0095D, with samples now dispatched to the
lab for analysis.”
Yandal Resources Ltd (ASX: YRL, “Yandal Resources” or the “Company”) is pleased to
provide an exploration update for both the Arrakis Prospect and Flushing Meadows deposit
within the Ironstone Well-Barwidgee Gold Project (see Figures 10 and 11). RC exploration
drilling recommenced at Arrakis in early April. The drilling program was designed with two key
aims: to extend primary gold mineralisation south-eastward from the 6,150mN section (local
grid), and to complete testing of the continuity of higher-grade mineralisation within the
currently defined extents of the newly discovered mineralised system. To date, 29 RC holes
for approximately 6,600m have been completed (see Tables 3, 4 and 5).
Assay results from the final hole from the 6,050mN section have been received and are now
reported (see Figures 1, 3 and 4). These RC results confirm primary mineralisation remains
open at depth. Results continue to demonstrate a consistently higher-grade (>2.0 g/t Au)
zone within broader mineralised intercepts, supporting the concept of both open pit and
underground exploration targets for Arrakis.
Results from the 5,950mN and 5,850mN lines did not return any significant results in line with
visual interpretations, confirming the presence of a north-south striking offsetting structure
(see Figure 3).
yandalresources.com.au | ASX:YRL 3
RC drilling targeting the offset south-east continuation of the Arrakis structure (see Figure 3)
has successfully identified a comparable stratigraphic sequence to Arrakis, and geological
observations from drilling demonstrate a structure of interest. These observations provide the
first validation of the modelled offset of the Arrakis stratigraphy and suggest potential for the
mineralised system to continue further to the southeast. Assay results from these RC holes are
anticipated in June.
At Flushing Meadows, six of the eight 200m spaced diamond holes have been completed
below the 268koz Mineral Resource Estimate (MRE). This includes 1,015m of RC pre-collars and
1,750m of diamond drilling. Drilling at Flushing Meadows commenced in late April and is
designed to assess the continuity of mineralisation below the shallow MRE, which strikes for
over 1.9km at surface. The planned diamond drilling has successfully intersected the targeted
structures down-dip of known Flushing Meadows mineralisation. Additionally, diamond
logging indicates potential for multiple parallel structures of interest in both the footwall and
hanging wall of known mineralisation (See Figure 5).
Arrakis Extensional RC Drilling Results
A total of 21 RC holes have been completed on six 100m to 200m spaced lines covering
approximately 800m of strike, to test for southeast strike extensions of the primary Arrakis
mineralisation through a zone of interpreted structural complexity. Assay results from the first three
100m spaced extensional RC lines directly along strike of the primary Arrakis structure (6,050mN,
5,950mN and 5,850mN) have been received (see Figures 1, 2 and 3), and significant intercepts
include:
• 13m @ 1.6g/t Au from 206m in 26IWBRC0069m (ETW*1 11m), including
8m @ 2.2g/t Au from 210m,
• 11m @ 1.7g/t Au from 84m in 26IWBRC0100 (ETW*1 10m), including
6m @ 2.8g/t Au from 84m,
• 3m @ 1.2g/t Au from 214m, and 4m @ 0.9g/t Au from 223m in 26IWBRC0089
The result from 26IWBRC0069 and 26IWBRC0100 completes the 6050mN section, which includes
previously reported (See ASX release 28 April 2026) intercepts of:
• 27m @ 1.2g/t Au from 87m in 26IWBRC0065 (ETW*1 20m), including
2m @ 5.1g/t Au from 89m, and
5m @ 2.7g/t Au from 100m
• 12m @ 2.3g/t Au from 152m in 26IWBRC0067 (ETW*1 10m), including
6m @ 3.7g/t Au from 152m
*1 ETW - Estimated True Width
yandalresources.com.au | ASX:YRL 4
The results from the 6,050mN section continue to reaffirm strong along-strike and down-dip gold
mineralisation continuity with a consistent mineralisation style and geometry (see Figures 1 and
3). Results also continue to demonstrate a persistent >2.0g/t Au higher-grade zone within broader
mineralisation associated with the eastern (or hanging-wall) margin (contact) of the mineralised
zone. Results from the 6050mN and 6150mN lines show evidence for a high-grade domain of
mineralisation that strikes over approximately 150m and with a sub-vertical plunge. This domain
remains open at depth.
The continuous nature of mineralisation and relatively simple geometry provides the Company
with increased confidence in the geological model underpinning the Arrakis Prospect.
Furthermore, the early delineation of broad high-grade domains within the mineralised system
will support the testing of deeper exploration targets as drilling advances throughout 2026.
Results from the 5,950mN and 5,850mN lines, directly along strike of the Arrakis structure, confirm
previously reported interpretations (See ASX release 28 April 2026) derived from visual
observations that the host and associated Arrakis stratigraphy are absent directly along strike,
and have been offset by the north-south trending Scytale Shear Zone (see Figure 3).
RC drilling across four 200m spaced lines covering the interpreted offset position of the Arrakis
Structure (see Figure 3), has successfully intersected the targeted stratigraphy in the interpreted
offset position. This observation is significant as it provides preliminary support for the Arrakis
mineralised system to continue southeast of the Scytale Shear Zone. Select samples from RC
drilling from across the interpreted offset position have been prioritised at the lab with results
anticipated in 2 to 4 weeks.
Targeted Arrakis Infill Drilling Results
Targeted infill RC drilling on 100m spaced lines within the currently defined extents of the Arrakis
mineralised system is underway to define the geometry and extent of higher-grade gold
mineralisation to inform future exploration targeting. To date, eight (8) RC holes have been
completed, with results from the first line of drilling on the 6,250mN line recently received (see
Figures 2, 3 and 4), with intercepts including:
• 11m @ 1.3g/t Au from 236m in 26IWBRC0102m (ETW*1 10m), including
3m @ 1.8g/t Au from 237, and
2m @ 3.2g/t Au from 245m
• 4m @ 2.1g/t Au from 29m in 26IWBRC0091 (ETW*1 3m)
• 5m @ 1.2g/t Au from 93m in 26IWBRC0093 (ETW*1 4m), including
2m @ 2.0g/t Au from 96m
Or 39m @ 0.3g/t Au from 93m (using a 0.1g/t Au lower cut-off)
• 6m @ 0.9g/t Au from 153m from 26IWBRC0101 (ETW*1 5m)
Or 26m @ 0.4g/t Au from 153m (using a 0.1g/t Au lower cut-off)
yandalresources.com.au | ASX:YRL 5
Mineralisation remains open at depth on the 6,250mN line. Results combined with geological
observations show a broadening of the host porphyry down dip and along strike. Further results
from the targeted infill program are anticipated in the coming weeks (See Figure 4).
Figure 1: 6,050mN cross-section showing the completed section and all drilling results from
26IWBRC0069. The section location is shown in Figure 3. The section shows all drilling within +/-
25m of the section plane.
Cross-Section
6,050mN
northwest facing
Transported Cover
Surface
Dolerite
TOFR
3m @ 2.0g/t Au
Incl. 1m @ 4.1g/t Au
Pillow
Basalt
12m @ 2.3g/t Au
Incl. 6m @ 3.7g/t Au
27m @ 1.2g/t Au
Incl. 2m @ 5.1g/t Au &
5m @ 2.7g/t Au
13m @ 1.5g/t Au
Incl. 8m @ 2.2g/t Au
11m @ 1.7g/t Au
Incl. 6m @ 2.8g/t Au
yandalresources.com.au | ASX:YRL 6
Figure 2: 6,250mN cross-section showing the completed section and all drilling results from
26IWBRC0091, 26IWBRC0093, 26IWBRC0101 and 26IWBRC0102. The section location is shown in
Figure 3. The section shows all drilling within +/- 25m of the section plane.
Cross-Section
6,250mN
northwest facing
Transported Cover
Surface
Dolerite
Pillow
Basalt
5m @ 1.2g/t Au
Incl. 2m @ 2.0g/t Au
[ 41m @ 0.3g/t Au ]
10m @ 0.6g/t Au
Incl. 1m @ 2.2g/t Au
[ 26m @ 0.4g/t Au ]
4m @ 2.1g/t Au
Incl. 1m @ 5.6g/t Au
2m @ 1.4g/t Au
11m @ 1.2g/t Au
Incl. 3m @ 1.8g/t Au
& 2m @ 3.2g/t Au
yandalresources.com.au | ASX:YRL 7
Figure 3: A collar plan over the Arrakis Prospect overlying a ground gravity image (BA267 1VD
linear colour scale, with northeast shade). All Yandal drilling is plotted (historic drilling has been
excluded). Collars are thematically coloured by max Au (g/t) in the hole. Dashed yellow polygons
represent air-core regolith anomalies.
Caladan
Fold
1000m
1.3km Surface
Projection of
Arrakis Structure
Parallel Air-core
Trend
25IWBAC096
9m @ 1.2 g/t Au
26IWBRC0067
12m @ 2.3g/t Au
Incl. 6m @ 3.7g/t Au
26IWBRC0065
27m @ 1.2g/t Au
Incl. 2m @ 5.1g/t Au &
5m @ 2.7g/t Au
Gravity
1VD Lin
26IWBRC0069
13m @ 1.6g/t Au
Incl. 8m @ 2.2g/t Au
26IWBRC0102
11m @ 1.2 g/t Au
Incl. 3m @ 1.8g/t Au
& 2m @ 3.2g/t Au
RC Drilling Testing
Southeast Offset
Extension – Results
Pending
26IWBRC0100
11m @ 1.7g/t Au
Incl. 6m @ 2.8g/t Au
yandalresources.com.au | ASX:YRL 8
Figure 4: A longitudinal section displaying intercept midpoints within the main Arrakis mineralised structure (intercepts from subordinate structures are
excluded). Grade accumulation (length multiplied by Au grade) is based on down-hole length, with no true width correction applied. This longitudinal
section has been prepared to show the distribution of recent intercepts across the interpreted Arrakis trend.
Scale
250m
NORTHWEST
Surface
Arrakis
Longitudinal Section
southwest facing
SOUTHEAST
Primary Arrakis Structure >1.3km
26IWBRC0089
3m @ 1.2g/t Au &
4m @ 0.9g/t Au
26IWBRC0102
11m @ 1.2g/t Au
Incl. 3m @ 1.8g/t Au
& 2m @ 3.2g/t Au
Interpreted
Scytale Shear
Zone Offsetting
Stratigraphy
26IWBRC0069
13m @ 1.6g/t Au
Incl. 8m @ 2.2g/t Au
26IWBRC0093
5m @ 1.2g/t Au
Incl. 2m @ 2.0g/t Au
26IWBRC0091
4m @ 2.1g/t Au
Incl. 1m @ 5.6g/t Au
Long-section Only Plots
Confirmed Intercepts Within
the Primary Arrakis Structure
RC Drilling of Southeast
Offset Extension –
Results Pending
26IWBRC0100
11m @ 1.7g/t Au
Incl. 6m @ 2.8g/t Au
yandalresources.com.au | ASX:YRL 9
Flushing Meadows Diamond Drilling
The Flushing Meadows framework diamond drilling program commenced in late April. The
program will see up to eight 200m spaced diamond holes covering 1.6km of strike completed
below the current Flushing Meadows MRE (See ASX release 4 November 2020). Diamond
drilling is targeting down-dip intercepts, approximately 100m below the fresh rock boundary.
The key aims of the framework program included:
• Completing the first effective and systematic test of primary fresh rock
mineralisation across the Flushing Meadows deposit,
• Assess the potential for high-grade mineralisation within fresh rock, and
• Identify key stratigraphic, intrusive and structural controls on mineralisation to inform
a preliminary geological model.
Six of the eight diamond holes have now been completed (for ~2,750m of diamond drilling
and RC pre-collars, see Figures 8 and 9), with all six holes successfully intercepting the
interpreted down-dip Flushing Meadows mineralised structures. Significantly, numerous
additional structures of interest have also been identified in both the hanging-wall and
footwall of the known mineralised trend (see Figure 5). The potential of the Flushing Meadows
mineralised system would be substantially bolstered should these parallel positions host
significant gold mineralisation. The first Flushing Meadows diamond hole, 26IWBRC0095D was
prioritised for sampling, with all samples from this hole now at the lab for analysis.
Drilling to date has also facilitated significant geological insights into the nature of the
mineralised system across Flushing Meadows. Based on geological observation from
diamond core, Flushing Meadows is hosted within a thick sequence of basalt flows (often
pillowed), with minor dolerite and narrow intervals of iron-rich sediments. Based on the down-
dip projections, gold mineralisation is likely associated with deformed felsic porphyry dykes
of variable thickness. The intrusive porphyry contacts appear to localise strain and fluid flow,
resulting in a range of both brittle and ductile deformation textures, typically presenting as
either intense ductile shear fabrics or breccias that include fragments of both the porphyry
and the bounding rock (see Figure 6 below). Where these contacts occur within iron-rich
sediments (with primary magnetite), strong sulphide replacement has occurred, dominated
by pyrite and/or pyrrhotite (see Figure 7) with trace sphalerite, arsenopyrite and chalcopyrite.
Results from the framework diamond drilling program will enable an assessment of
mineralisation potential below the current MRE.
yandalresources.com.au | ASX:YRL 10
Figure 5: 6,050mN cross-section showing logged structures from 26IWBRC0095D. The section
location is shown in Figure 9. The section shows all drilling within +/- 50m of the section plane. See
Table 6 for a geological summary of each interval of interest noted in the cross-section.
Cross-Section
10,525mN
northwest facing
Surface
BOCO
TOFR
< Start of diamond core
Assays
Pending
Target
Structures
Parallel Structures
of Interest
Parallel Structures
of Interest
yandalresources.com.au | ASX:YRL 11
Figure 6: HQ core from 26IWBRC0095D showing an example of a heavily altered and sulphide rich
brecciated sediments adjacent to a porphyry dyke observed within one of the target structures (see
Table 6).
Figure 7: HQ core from 26IWBRC0095D showing an example of iron-rich sediments with deformed
pyrrhotite and pyrite laminations associated with a parallel structure of interest (see Table 6).
yandalresources.com.au | ASX:YRL 12
Figure 8: A southwest facing longitudinal section displaying the Flushing Meadows MRE outline (see ASX release 4 November 2020) and the drill strings of completed
diamond drilling below the MRE.
yandalresources.com.au | ASX:YRL 13
Figure 9: Flushing Meadows collar plan overlying a ground gravity image (BA267 1VD linear
colour scale, with northeast shade). All Yandal drilling is plotted, with only effective (>20m
down-hole depth) historic drilling displayed. Collars are thematically coloured by max Au (g/t)
in the hole.
Ground Gravity Survey
Infill ground gravity surveys have been completed across the Arrakis, Flushing Meadows and
Geidi Prime prospects. The data will be used to refine stratigraphic, structural and targeting
models across all three areas.
Flushing
Meadows
268koz MRE
500m
< 26IWBRC0095D
< 26IWBRC0097D
< 26IWBRC0090D
< 26IWBRC0099D
< 26IWBRC0098DA
< To be drilled
< To be drilled
< 26IWBRC0096DA
yandalresources.com.au | ASX:YRL 14
Flushing Meadows Air Core Drilling Program
The 10,000m air-core utilising 800m spaced lines covering the broader Flushing Meadows target
area and the Giedi Prime target area has commenced. The program is designed to test several
conceptual or structural targets parallel to the current Flushing Meadows deposit.
Next Steps and Looking Ahead
The active exploration programs across the IWB Gold Project are advancing well, and the
Company maintains a strong cash position while continuing the busy exploration schedule
remaining in CY 2026.
The notable near-term activities and news flow from the planned circa 10km RC; 5km DD,
and 15km AC drilling programs (see Table 1 below for schedule) include;
Arrakis Discovery
• RC drilling assay results targeting the southeast extension of the Arrakis structure;
• Additional assay results from targeted RC drilling to define the scale and
geometry of higher-grade mineralisation across the recent gold discovery;
• First assay results from diamond drilling designed to assess the depth continuity
of higher-grade mineralisation;
Flushing Meadows (MRE 268koz @ 1.1g/t Au, see Table 2)
• Assay results from RC drilling of pre-collars are expected in the coming weeks;
• Core samples from diamond hole 26IWBRC0095D has been dispatched to the
lab and prioritised with results expected in 2-3 weeks’ time.
• Air-core drilling has commenced over the broader Flushing Meadows and
parallel Giedi Prime target area with first results expected late July.
New England Granite Target Area
• Drilling of the high-grade target (6m @ 6.3g/t Au from 36m, including 2m @
18.2g/t from 36m) identified at the Salusa prospect will recommence in June;
• Assay results from the Siona oxide RC drilling program are anticipated in the
coming weeks.
• Further air-core drilling across the western side of the New England Granite
target area will commence once final heritage clearance is received.
yandalresources.com.au | ASX:YRL 15
Table 1: Proposed indicative exploration schedule for the six-month period to September 2026.
Authorised by the board of Yandal Resources
Chris Oorschot
Managing Director
Yandal Resources Limited
yandal@yandalresources.com.au
Lucas Robinson
Corporate Storytime
+61 408 228 889
lucas@corporatestorytime.com
yandalresources.com.au | ASX:YRL 16
About Yandal Resources Limited
Yandal Resources has a portfolio of advanced gold exploration projects in the highly prospective Yandal
and Norseman-Wiluna Greenstone Belts of Western Australia.
Ironstone Well-Barwidgee Gold Project
The 100% owned Ironstone Well-Barwidgee (IWB) Gold Project covers approximately 370km² of highly
prospective and under-explored tenure located between the Jundee and Bronzewing mines in the
northern Yandal Greenstone Belt. Yandal has an established Resource of 268,000oz of gold at Flushing
Meadows (within IBW) and considers there to be strong potential to make new discoveries and expand
this resource base within its extensive tenure holding. (Refer to the ASX announcement of 4 November
2020 for details of the Flushing Meadows Resource).
The IWB project area also includes two new gold discoveries, the Arrakis and Siona Prospects, both made
within the last twelve months. These outcomes were driven by the execution of a targeted exploration
program that followed a systematic, geologically driven strategy that was developed in early 2023. The
Arrakis prospect is hosted within the Caladan fold, and the Siona prospect is hosted within the New
England Granite.
Both discoveries are currently at an early stage but progressing well, with future activities focused on
delineating the scale of each of the newly defined mineralised systems.
The IWB Gold Project also includes several advanced prospects, where limited historic and YRL drilling has
returned robust gold intercepts, indicating the potential for shallow oxide mineralisation. Both the early-
stage and more advanced prospects are the focus of ongoing exploration.
Mt McClure
The Mt McClure Gold Project, acquired in August 2022, is located ~15km southwest of the historic
Bronzewing Mine and includes three mining leases with JORC 2012 Resources totalling 182,200oz Au.
The project has prospectivity for new shallow gold deposits adjacent to current Resources and in the
footwall and hanging wall of the stratigraphy. Ground gravity survey data from the prior Quarter support
ongoing structural/stratigraphic interpretations for 2026 targeting.
yandalresources.com.au | ASX:YRL 17
Figure 10: Yandal Resource exploration Project locations within the Yandal
Greenstone Belt. The Arrakis Prospect is located within the Caladan target area.
King of the Hills
Thunder Box
Darlot
Bellevue
Kathleen Valley
Mt Keith
Wiluna
Jundee
Bronzewing
Wiluna
Leinster
New England Granite
Siona Discovery
Flushing Meadows
Deposit 268koz
Caladan Target area
Arrakis Discovery
0 100km
Ironstone Well-
Barwidgee Gold Project
Mt McClure Gold
Project 182koz
Dingo Range Project
yandalresources.com.au | ASX:YRL 18
Figure 11: Yandal Resource exploration target areas and prospect locations within the northern
Yandal Greenstone Belt. The Arrakis Prospect is located within the Caladan target area.
5km
Salusa
Caladan
Target Area
Siona
Flushing Meadows
(268Koz)
New England
Granite
Nayla Target
Area
Geidi Prime
Target Area
5km
Radius
Arrakis
Discovery
Irulan Dolerite
Complex
yandalresources.com.au | ASX:YRL 19
Table 2 – Yandal Resources Ltd - Mineral Resource Summary
Deposit
Indicated Inferred Total
Tonnes
(‘000s)
Grade
(g/t)
Au
(oz)
Tonnes
(‘000)
Grade
(g/t)
Au
(oz)
Tonnes
(000’s)
Grade
(g/t)
Au
(Oz)
Ironstone Well
Flushing Meadows1 2,141 1.3 91,000 5,245 1.1 177,000 7,386 1.1 268,000
Mt McClure
Challenger2 718 1.9 44,000 718 1.9 44,000
Success3 1,255 1.9 75,000 1,255 1.9 75,000
Parmelia4 252 2.1 17,000 252 2.1 17,000
HMS Sulphur5 1010 1.2 39,000 1010 1.2 39,000
Gilmore6 134 1.7 7,200 134 1.7 7,200
Sub-total - MMC 3,369 1.7 182,200 3,369 1.7 182,200
Grand-total7 2,141 1.3 91,000 8,614 1.3 359,200 10,755 1.3 450,200
Due to the effects of rounding, totals may not represent the sum of the individual components.
1. Reported above 0.5g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 4 November 2020 for full
details. 2. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 22 August 2022 for
full details 3. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 6 September
2022 for full details. 4. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 20
September 2022 for full details. 5. Reported above 0.5g/t Au lower cut-off grade within this announcement 6. Reported above 1.0g/t
Au lower cut-off grade within this announcement. 7. All Resources are reported as global estimates, not constrained by optimised pit
shells.
Competent Person Statement
The information in this document related to Exploration Targets and Exploration Results, geology and data
compilation is based on information reviewed or compiled by Mr Christopher Oorschot, a Competent
Person who is a Member of The Australasian Institute of Geoscientists. Mr Oorschot is the Managing Director
of the Company, is a full-time employee and holds shares and options in the Company. Mr Oorschot has
sufficient experience, which is relevant to the style of mineralisation and type of deposit under
consideration, and to the activity which he is undertaking to qualify as a Competent Person as defined in
the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr Oorschot consents to the inclusion in this announcement of the matters based on this
information in the form and context in which it appears.
The information in this announcement that relates to the Flushing Meadows and Mt McClure Mineral
Resource Estimates is based on information compiled and generated by Andrew Bewsher, an employee
of BM Geological Services Pty Ltd (“BMGS”). Both Andrew Bewsher and BMGS hold shares in the company.
BMGS consents to the inclusion, form and context of the relevant information herein as derived from the
original resource reports. Mr Bewsher has sufficient experience relevant to the style of mineralisation and
type of deposit under consideration and to the activity which is being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the JORC ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’.
YRL confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
yandalresources.com.au | ASX:YRL 20
Forward Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include, but
are not limited to, statements concerning Yandal Resources Limited’s (Yandal’s) current expectations,
estimates and projections about the industry in which Yandal operates, and beliefs and assumptions
regarding Yandal’s future performance. When used in this document, words such as “anticipate”, “could”,
“plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are
forward-looking statements. Although Yandal believes that its expectations reflected in these forward-
looking statements are reasonable, such statements are subject to known and unknown risks, uncertainties
and other factors, some of which are beyond the control of Yandal, and no assurance can be given that
actual results will be consistent with these forward-looking statements. Drilling results presented indicate
geological potential for mineralisation, but there can be no certainty that these results will eventually form
part of a Mineral Resource Estimate.
Table 3 – Arrakis RC drilling program collar location summary. Please note that collars
have not yet been formally surveyed; the coordinates below are derived from a
handheld GPS and are accurate to within +/- 5m.
Hole ID
Hole
type
East
(m)
North
(m)
RL
(mAHD)
Azimuth
(degrees)
Dip
(degrees)
Total
Depth
(m)
26IWBRC0071 RC 287632 7027018 525.0 225 -60 157
26IWBRC0073 RC 287729 7027111 525.0 225 -60 287
26IWBRC0075 RC 287681 7026911 524.0 225 -60 177
26IWBRC0077 RC 287737 7026971 524.0 225 -60 207
26IWBRC0079 RC 287794 7027030 523.6 225 -60 207
26IWBRC0081 RC 287851 7027087 523.5 225 -60 227
26IWBRC0085 RC 287693 7027068 525.4 205 -60 217
26IWBRC0089 RC 287621 7027117 523.4 225 -60 282
26IWBRC0091 RC 287352 7027153 523.6 225 -60 167
26IWBRC0093 RC 287375 7027176 524.0 225 -60 182
26IWBRC0100 RC 287535 7027055 524.0 225 -60 122
26IWBRC0101 RC 287402 7027202 524.8 225 -60 207
26IWBRC0102 RC 287449 7027250 521.6 225 -60 277
26IWBRC0103 RC 287175 7027266 529.0 225 -60 172
26IWBRC0104 RC 287211 7027291 522.7 225 -60 201
26IWBRC0105 RC 287930 7027330 525.0 225 -60 252
26IWBRC0106 RC 288079 7027195 525.0 225 -60 247
26IWBRC0107 RC 288218 7027056 525.0 225 -60 202
26IWBRC0108 RC 287993 7027098 525.0 225 -60 222
26IWBRC0109 RC 288031 7027141 525.0 225 -60 222
26IWBRC0110 RC 287784 7027167 525.0 225 -60 224
26IWBRC0111 RC 287829 7027214 524.0 225 -60 222
26IWBRC0112 RC 288178 7027003 525.0 225 -60 202
26IWBRC0113 RC 288339 7026866 525.1 225 -60 202
26IWBRC0114 RC 287246 7027327 519.8 225 -60 242
26IWBRC0115 RC 286918 7027566 522.8