Additional AGM Resolution
Released
Released
Announcement PDF
Contact Us
A: Suite 1, Level 3, 1138 Hay Street,
West Perth WA 6005
T: +61 (0)8 9389 9021
E: yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL
Board and Management
Chris Oorschot CEO
Eduard Eshuys Non-Exec Chair
Greg Evans Non-Exec Director
Andrew Jackson Non-Exec Director
Sevan Gore Non-Exec Director
Greg Fitzgerald Company Secretary
Additional AGM Resolution
As announced on 27 October 2026, the directors of Yandal Resources Limited (“Yandal” or
“the Company”)(ASX:YRL) appointed Mr Sevan Gore as a non-executive Director of the
Company with effect from 1 November 2026.
The appointment of Mr Gore as a director occurred after the Notice of Annual General
Meeting (AGM) was dispatched to shareholders.
Section 250R(1) of the Corporations Act provides that the business of an AGM may include
the election of directors even if not referred to in the Notice of Meeting. As a result, a
resolution will be put to shareholders at the Company’s AGM to be held on Tuesday 24
November 2026 at 11:00am WST as follows:
To consider and, if thought fit, to pass, with or without amendment, the following resolution
as an ordinary resolution:
“That, for the purpose of clause 15.4 of the Constitution, Listing Rule 14.4 and for all other
purposes, Sevan Gore, who was appointed as a Director on 1 November 2026, retires and,
being eligible, offers himself for election, is elected as a Director.”
Shareholders are referred to the Company’s ASX announcement dated 27 October 2026
for details relating to Mr Gore’s background and relevant experience.
For further information or to ask questions in relation to this announcement, please visit our
Investor Hub at https://yandalresources.com.au/link/P2wEzy
Authorised by the board of Yandal Resources
For further information, please contact:
Eduard Eshuys
Chair
Yandal Resources Limited
yandal@yandalresources.com.au
ASX Announcement
13 November 2026
yandalresources.com.au | ASX:YRL 2
About Yandal Resources Limited
Yandal Resources has a portfolio of advanced gold exploration projects in the highly prospective Yandal
and Norseman-Wiluna Greenstone Belts of Western Australia.
Ironstone Well-Barwidgee Gold Project
The 100% owned Ironstone Well-Barwidgee (IWB) Gold Project covers approximately 456 km² of highly
prospective and under-explored tenure located between the Jundee and Bronzewing mines in the
northern Yandal Greenstone Belt. Yandal has an established Resource of 268,000oz of gold at Flushing
Meadows (within IWB) and considers there to be strong potential to make new discoveries and expand
this resource base across its extensive tenure. (Refer to the ASX announcement of 4 November 2020 for
details of the Flushing Meadows Resource).
The IWB project area also includes two new gold discoveries, the Arrakis and Siona Prospects, both made
within the last two years. These outcomes were driven by the execution of a targeted exploration
program that followed a systematic, geologically driven strategy that was developed in early 2023. The
Arrakis Prospect is hosted within the Caladan fold, and the Siona Prospect is hosted within the New
England Granite.
Both discoveries are currently at an early stage but progressing well, with future activities focused on
delineating the scale of each of the newly defined mineralised systems.
The IWB Gold Project also includes several advanced prospects, where limited historic and YRL drilling has
returned robust gold intercepts, indicating the potential for shallow oxide mineralisation. Both the early-
stage and more advanced prospects are the focus of ongoing exploration.
Mt McClure
The Mt McClure Gold Project, acquired in August 2022, is located ~15 km southwest of the historic
Bronzewing Mine and includes three mining leases with JORC 2012 Resources totalling 182,200oz Au
(Refer to the ASX announcements of 22 August 2022, 6 September 2022 and 20 September 2022, for
details of the Mt McClure Gold Project Resource).
The project has prospectivity for new shallow gold deposits adjacent to current Resources and in the
footwall and hanging wall of the stratigraphy. Ground gravity survey data support ongoing
structural/stratigraphic interpretations for 2026 targeting.
Previously Reported Mineral Resource Estimate
The information in this announcement that relates to the Mineral Resource estimates for the IWB and Mt
McClure Gold Projects is extracted from the Company’s ASX announcements referenced in this release
(Original Announcements), which are available to view at www.asx.com.au. The Company confirms that
it is not aware of any new information or data that materially affects the information included in the
Original Announcements and, in the case of estimates of Mineral Resources, that all material assumptions
and technical parameters underpinning the estimates in the Original Announcements continue to apply
and have not materially changed. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the Original
Announcements.
yandalresources.com.au | ASX:YRL 3
Yandal Resource exploration Project locations within the Yandal Greenstone Belt
Share your feedback
Discover