Ironstone Well - Barwidgee Exploration Update
Released
Released
Announcement PDF
ASX Announcement
26 February 2024
Ironstone Well - Barwidgee Exploration Update
Key Points:
• Results from the orientation soil survey trialling the applicability of the method in regional
exploration have been received,
o Results confirm a consistent bedrock geochemical response, indicating the
method provides an effective and low-cost screen for identifying new gold
targets, evaluating existing targets, and testing other commodities of interest
such as lithium.
o As a result of this orientation work, a systematic soil sampling program will be
rolled out across a broad area of the Project.
• RC drilling testing the large-scale Oblique and Quarter Moon prospects, approximately 50km
south of the Jundee gold mine, is scheduled for early March.
• An infill aerial magnetic survey over the Oblique Prospect to refine potential structural
controls on higher-grade mineralisation is scheduled for the end of February.
• Diamond drilling to test mineralisation at depth and provide structural and lithological
information is scheduled for April across the Oblique, Quarter Moon and New England
Prospects.
• With approximately $7.5m available funds, the Company is well positioned to maintain the
current high level of exploration throughout 2024.
For further information or to ask questions concerning this announcement, please visit our
Investor Hub at: https://investorhub.yandalresources.com.au/link/mPqBBy
Registered Address
Board Members
Yandal Resources Limited
Tim Kennedy
Managing Director/CEO
Greg Evans
Non-Exec Chairman
Katina Law
Non-Exec Director
Chris Oorschot
Technical Director
Greg Fitzgerald
Company Secretary
T
+61 8 9389 9021
E
yandal@yandalresources.com.au
W
www.yandalresources.com.au
ACN 108 753 608
A
P
ABN 86 108 753 608
Level 1, U5/62 Ord Street
West Perth WA 6005
PO Box 1104
Nedlands WA 6909
Commenting on the new results, Yandal Resources’ Managing Director, Mr Tim
Kennedy, said:
“Results from the trial soil sampling survey give us confidence that a larger scale soil sampling
program will greatly assist in delineating new exploration targets and evaluating existing
targets. Though the survey was intended to highlight areas of lithium prospectivity in the first
instance, it is clear from the results that sampling should also be effective in highlighting areas
of interest for other commodities, including gold. This is an excellent outcome as it should
provide a rapid and cost-effective screen for areas of interest and help refine targets for more
follow-up drilling.
Despite heavy rainfall in late January, the team is scheduled to commence drilling activities
across the Oblique and Quarter Moon Prospect. To support our aggressive exploration
program moving forward, we are pleased to welcome respected Senior Geologist Dr Anthony
Morey to the technical team and also Adam Baynes as Senior Field Technician, who recently
held a similar role with Musgrave Minerals.”
Yandal Resources Ltd (ASX: YRL, “Yandal Resources” or the “Company”) is pleased to provide an
exploration update for the Company’s 100% owned Ironstone Well-Barwidgee (IWB) Gold Project,
located within the Yandal Greenstone Belt of Western Australia, situated between the Jundee and
Bronzewing Operations.
Orientation Soil Sampling Program
A total of 246 soil samples were collected in November 2023 as part of a small orientation (trial) soil
sampling survey to evaluate the efficacy of soils across the northwest portion of the Ironstone WellBarwidgee Project and the preferred sample spacing for a broader program. Six 400m spaced lines
with 50m spaced samples over two areas (three lines at each area) were completed (See Figure 1).
Samples were submitted for Ultrafine+ Analysis at Lab West in Perth, Western Australia. Survey Area
A lies directly north of the Quarter Moon Prospect and covers a range of lithologies, including dolerites
and felsic intrusions. Survey Area B lies 1.5km northwest of the Oblique Prospect and covers both lower
mafic stratigraphy and upper felsic stratigraphy; see Figure 1 below.
Results indicate a consistent bedrock geochemical response in both areas, along with elevated
orogenic gold pathfinders along the strike of the Quarter Moon mineralisation in Survey Area A. The
results provide confidence in the broader application of soil sampling across the project area to aid in
advancing gold exploration and lithium-bearing pegmatite targets across the IWB Project area (see
Figure 2).
Based on these results, a large-scale follow-up program will apply the initial soil sampling grid of 400m
spaced lines with 200m spaced samples. The Company aims to complete the survey in the current
Quarter, subject to the impact of seasonal rainfall. The resultant dataset will be the largest and most
comprehensive geochemical dataset across all the Company’s projects and will enable rapid screening
of areas of interest for further targeting and drill testing.
ASX Announcement 26 February 2024
Page 2
Infill Aerial Magnetic Data
Following a review of the available aerial magnetic dataset across the Oblique Prospect, a small infill
magnetic survey utilising a helicopter drone is scheduled to be completed later this month. Current
aerial magnetic data, collected on 100m spaced E-W lines, highlight structures that are potentially an
important control on mineralisation. The infill survey will infill the prospect to 25m spaced lines, thereby
providing better resolution of the structures of interest and drill targets. The survey is scheduled for
completion in late February.
Jundee Gold
Mine (NST)
40km Nth
Area B
E 53/1882
Oblique Prospect
Quarter Moon
Area A
FIGURE 1: COMPOSITE AERIAL IMAGE AND INTERPRETED BEDROCK GEOLOGY IMAGE SHOWING THE LOCATION OF
THE ORIENTATION SOIL SAMPLING SURVEY. SOIL SAMPLING LOCATIONS ARE THEMATICALLY COLOURED FOR AU
(PPB) BASED ON KEY PERCENTILE RANGES.
ASX Announcement 26 February 2024
Page 3
FIGURE 2: INTERPRETED BEDROCK GEOLOGY ACROSS THE IRONSTONE WELL-BARWIDGEE GOLD PROJECT SHOWING THE
COMPANY’S TENEMENTS AND THE EXTENT OF THE PLANNED SOILS SAMPLING PROGRAM.
ASX Announcement 26 February 2024
Page 4
Oblique and Quarter Moon Drilling
4,500m of RC and 2,500m of diamond drilling are scheduled across the Oblique and Quarter Moon
Prospects combined. RC drilling will commence in early March, with diamond drilling to follow in April.
RC drilling at Oblique aims to follow up on a number of significant intercepts from the phase 2 RC drilling
completed in November 2023 (See ASX release 12th January 2024). In addition, RC drilling will also
test regolith anomalies across the northern half of the prospect (see Figure 3).
FIGURE 3: COMPOSITE RTP 1VD AND RTP 2VD AERIAL MAGNETIC IMAGE WITH ALL DRILLING ACROSS THE OBLIQUE
PROSPECT SHOWN AND THEMATICALLY COLOURED BY MAX AU IN HOLE. THE SURFACE PROJECTION OF THE INTERPRETED
CHLORITE-MAGNETITE ALTERED UNIT IS ALSO DISPLAYED.
The diamond drilling program across Oblique will include several broad-spaced holes as a framework
program to test the depth extensions of mineralisation within fresh rock along 800m of strike and test
the broader scale of the mineralised system.
ASX Announcement 26 February 2024
Page 5
RC drilling at Quarter Moon looks to test along strike and below higher-grade intercepts to understand
the continuity and geometry of mineralisation. Several drill holes will also test anomalous footwall
positions west of the primary mineralised trend.
New England Granite Diamond Drilling
Two 400m deep diamond holes are planned across the New England Granite Prospect and are cofunded under the Geological Survey of Western Australia Exploration Incentive Scheme. The two holes
test the sheared southern margin of the granitoid adjacent to the Barwidgee Shear Zone and the
anomalous eastern margin (see Figure 4). The resultant data will inform the design of an RC program
scheduled for later in the June Quarter.
FIGURE 4: PLAN OF THE NEW ENGLAND GRANITE PROSPECT (E 53/1843) SHOWING SIGNIFICANT
INTERCEPTS AND INTERPRETED BEDROCK GEOLOGY. THE LOCATION OF THE TWO PLANNED EIS
DIAMOND DRILL HOLES ARE SHOWN AS EIS-001 AND EIS-002).
ASX Announcement 26 February 2024
Page 6
Operational Capability Expanded
With the increased work programs, the Company has successfully expanded the team by appointing a
Senior Exploration Geologist, Dr Anthony Morey, and a Senior Field Assistant, Adam Baynes. Both
bring exceptional experience that will benefit the progression of exploration across all projects and the
safe and effective completion of exploration programs.
Gordons South
A 10,000m AC program is now planned for mid-2024 following the grant of exploration License
Application ELA 27/701. This lease covers the newly interpreted Gordon Sirdar Shear Zone and splays,
which are interpreted to extend through the Gordons project toward Kanowna Belle.
Mt McClure
A review of prospective footwall and hanging wall targets will be completed this quarter, with AC and/or
RC drilling scheduled for the second half of 2024.
Authorised by the board of Yandal Resources
For further information, please contact:
Tim Kennedy
Managing Director
Yandal Resources Limited
yandal@yandalresources.com.au
ASX Announcement 26 February 2024
Greg Fitzgerald
Company Secretary
+61 8 9389 9021
yandal@yandalresources.com.au
Page 7
About Yandal Resources Limited
Yandal Resources was listed on the ASX in December 2018 and has a portfolio of advanced gold exploration
projects in the highly prospective Yandal and Norseman-Wiluna Greenstone Belts of Western Australia.
Yandal Resources’ gold project locations.
Yandal Resources Ltd - Mineral Resource Summary
Deposit
Ironstone Well
Flushing Meadows1
Mt McClure
Challenger2
Success3
Parmelia4
HMS Sulphur5
Gilmore6
Sub-total - MMC
Gordons
Gordons Dam7
Grand-total8
Tonnes
(‘000s)
2,141
2,141
Indicated
Grade
(g/t)
Au
(oz)
1.3
91,000
1.3
91,000
Inferred
Grade
(g/t)
Au
(oz)
5,245
1.1
177,000
718
1,255
252
1010
134
3,369
1.9
1.9
2.1
1.2
1.7
1.7
365
8,979
1.7
1.3
Tonnes
(‘000)
Total
Grade
(g/t)
Au
(Oz)
7,386
1.1
268,000
44,000
75,000
17,000
39,000
7,200
182,200
718
1,255
252
1010
134
3,369
1.9
1.9
2.1
1.2
1.7
1.7
44,000
75,000
17,000
39,000
7,200
182,200
20,000
379,200
365
11,120
1.7
1.4
20,000
470,200
Tonnes
(000’s)
Due to the effects of rounding, totals may not represent the sum of the individual components.
1. Reported above 0.5g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 4 November 2020 for full
details. 2. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 22 August 2022 for
full details 3. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 6 September
2022 for full details.4. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 20
September 2022 for full details 5. Reported above 0.5g/t Au lower cut-off grade within this announcement 6. Reported above 1.0g/t Au
lower cut-off grade within this announcement 7. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX
announcement dated 6 April 2023 for full details 8. All Resources are reported as global estimates, not constrained by optimised pit
shells.
ASX Announcement 26 February 2024
Page 8
Competent Person Statement
The information in this document related to Exploration Results, geology and data compilation is based on
information reviewed or compiled by Mr Christopher Oorschot, a Competent Person who is a Member of
The Australasian Institute Geoscientists. Mr Oorschot is the Exploration Manager and Technical Director for
the Company, is a full-time employee and holds shares and options in the Company. Mr Oorschot has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Oorschot consents to the inclusion in this announcement of the matters based on this information in the form
and context in which it appears.
The information in this announcement that relates to the Flushing Meadows, Mt McClure and Gordons Dam
Mineral Resource Estimates is based on information compiled and generated by Andrew Bewsher, an
employee of BM Geological Services Pty Ltd (“BMGS”). Both Andrew Bewsher and BMGS hold shares in
the company. BMGS consents to the inclusion, form and context of the relevant information herein as derived
from the original resource reports. Mr Bewsher has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration and to the activity which is being undertaken to qualify
as a Competent Person as defined in the 2012 Edition of the JORC ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’.
YRL confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement. The company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market
announcement.
Forward Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include, but are
not limited to, statements concerning Yandal Resources Limited’s (Yandal’s) current expectations, estimates
and projections about the industry in which Yandal operates, and beliefs and assumptions regarding
Yandal’s future performance. When used in this document, words such as “anticipate”, “could”, “plan”,
“estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are forwardlooking statements. Although Yandal believes that its expectations reflected in these forward-looking
statements are reasonable, such statements are subject to known and unknown risks, uncertainties and
other factors, some of which are beyond the control of Yandal and no assurance can be given that actual
results will be consistent with these forward-looking statements. Drilling results presented indicate geological
potential for mineralisation but there can be no certainty that these results will eventually form part of a
Mineral Resource Estimate.
ASX Announcement 26 February 2024
Page 9
Table 1 – Trial Soil Sampling Locations. Sample locations presented are relative to UTM MGA94 Zone 51s.
Sample ID Easting Northing
Sample ID Easting Northing
Sample ID Easting Northing
MLS00001
273270 7038189
MLS00047 273122 7037679
MLS00093 273109 7037232
MLS00002
273224 7038168
MLS00048 273076 7037658
MLS00094 273064 7037211
MLS00003
273179 7038147
MLS00049 273031 7037637
MLS00095 273019 7037190
MLS00004
273134 7038126
MLS00050 272986 7037615
MLS00096 272973 7037168
MLS00005
273088 7038105
MLS00051 272940 7037594
MLS00097 272928 7037147
MLS00006
273043 7038084
MLS00052 272895 7037573
MLS00098 272883 7037126
MLS00007
272998 7038063
MLS00053 272850 7037552
MLS00099 272837 7037105
MLS00008
272953 7038041
MLS00054 272804 7037531
MLS00100 272792 7037084
MLS00009
272907 7038020
MLS00055 272759 7037510
MLS00101 272747 7037063
MLS00010
272862 7037999
MLS00056 272714 7037489
MLS00102 272702 7037042
MLS00011
272817 7037978
MLS00057 272668 7037468
MLS00103 272656 7037020
MLS00012
272771 7037957
MLS00058 272623 7037446
MLS00104 272611 7036999
MLS00013
272726 7037936
MLS00059 272578 7037425
MLS00105 272566 7036978
MLS00014
272681 7037915
MLS00060 272532 7037404
MLS00106 272520 7036957
MLS00015
272635 7037893
MLS00061 272487 7037383
MLS00107 272475 7036936
MLS00016
272590 7037872
MLS00062 272442 7037362
MLS00108 272430 7036915
MLS00017
272545 7037851
MLS00063 272397 7037341
MLS00109 272384 7036894
MLS00018
272499 7037830
MLS00064 272351 7037320
MLS00110 272339 7036873
MLS00019
272454 7037809
MLS00065 272306 7037298
MLS00111 272294 7036851
MLS00020
272409 7037788
MLS00066 272261 7037277
MLS00112 272248 7036830
MLS00021
272363 7037767
MLS00067 272215 7037256
MLS00113 272203 7036809
MLS00022
272318 7037746
MLS00068 272170 7037235
MLS00114 272158 7036788
MLS00023
272273 7037724
MLS00069 272125 7037214
MLS00115 272112 7036767
MLS00024
272227 7037703
MLS00070 272079 7037193
MLS00116 272067 7036746
MLS00025
272182 7037682
MLS00071 272034 7037172
MLS00117 272022 7036725
MLS00026
272137 7037661
MLS00072 271989 7037151
MLS00118 271976 7036704
MLS00027
272092 7037640
MLS00073 271943 7037129
MLS00119 271931 7036682
MLS00028
272046 7037619
MLS00074 271898 7037108
MLS00120 271886 7036661
MLS00029
272006 7037605
MLS00075 271853 7037087
MLS00121 271841 7036640
MLS00030
271956 7037576
MLS00076 271807 7037066
MLS00122 271795 7036619
MLS00031
271910 7037555
MLS00077 271762 7037045
MLS00123 271750 7036598
MLS00032
271865 7037534
MLS00078 271717 7037024
MLS00124 271705 7036577
MLS00033
271820 7037513
MLS00079 271671 7037003
MLS00125 271659 7036556
MLS00034
271774 7037492
MLS00080 271626 7036982
MLS00126 273591 7031940
MLS00035
271729 7037471
MLS00081 273653 7037485
MLS00127 273636 7031961
MLS00036
271548 7037386
MLS00082 273608 7037464
MLS00128 273682 7031982
MLS00037
271593 7037407
MLS00083 273563 7037443
MLS00129 273727 7032003
MLS00038
271638 7037429
MLS00084 273517 7037422
MLS00130 273772 7032024
MLS00039
271684 7037450
MLS00085 273472 7037401
MLS00131 273818 7032045
MLS00040
273439 7037827
MLS00086 273427 7037380
MLS00132 273863 7032066
MLS00041
273393 7037806
MLS00087 273381 7037359
MLS00133 273908 7032087
MLS00042
273348 7037785
MLS00088 273336 7037337
MLS00134 273954 7032109
MLS00043
273303 7037763
MLS00089 273291 7037316
MLS00135 273999 7032130
MLS00044
273258 7037742
MLS00090 273245 7037295
MLS00136 274044 7032151
MLS00045
273212 7037721
MLS00091 273200 7037274
MLS00137 274090 7032172
MLS00046
273167 7037700
MLS00092 273155 7037253
MLS00138 274135 7032193
ASX Announcement 26 February 2024
Page 10
Sample ID Easting Northing
Sample ID Easting Northing
Sample ID Easting Northing
MLS00139
274180 7032214
MLS00186 274712 7032021
MLS00232 275742 7032060
MLS00140
274226 7032235
MLS00187 274757 7032042
MLS00233 275696 7032039
MLS00141
274271 7032257
MLS00188 274802 7032063
MLS00234 275651 7032017
MLS00142
274316 7032278
MLS00189 274848 7032084
MLS00235 275606 7031996
MLS00143
274361 7032299
MLS00190 274893 7032105
MLS00236 275561 7031975
MLS00144
274407 7032320
MLS00191 274938 7032126
MLS00237 275515 7031954
MLS00145
274452 7032341
MLS00192 274984 7032148
MLS00238 275470 7031933
MLS00146
274497 7032362
MLS00193 275029 7032169
MLS00239 275425 7031912
MLS00147
274543 7032383
MLS00194 275074 7032190
MLS00240 275379 7031891
MLS00148
274588 7032404
MLS00195 275120 7032211
MLS00241 275334 7031870
MLS00149
274633 7032426
MLS00196 275165 7032232
MLS00242 275289 7031848
MLS00150
274679 7032447
MLS00197 275210 7032253
MLS00243 275243 7031827
MLS00151
274724 7032468
MLS00198 275256 7032274
MLS00244 275198 7031806
MLS00152
274769 7032489
MLS00199 275301 7032295
MLS00245 275153 7031785
MLS00153
274815 7032510
MLS00200 275346 7032317
MLS00246 275107 7031764
MLS00155
274905 7032552
MLS00201 275391 7032338
MLS00247 275062 7031743
MLS00156
274951 7032573
MLS00202 275437 7032359
MLS00157
274996 7032595
MLS00203 275482 7032380
MLS00158
275041 7032616
MLS00204 275527 7032401
MLS00159
275086 7032637
MLS00205 275573 7032422
MLS00160
275132 7032658
MLS00206 274790 7031616
MLS00161
275177 7032679
MLS00207 274745 7031595
MLS00162
275222 7032700
MLS00208 274700 7031574
MLS00163
275268 7032721
MLS00209 274654 7031553
MLS00164
275313 7032743
MLS00210 274609 7031531
MLS00165
273760 7031577
MLS00211 274564 7031510
MLS00166
273805 7031598
MLS00212 274518 7031489
MLS00167
273851 7031619
MLS00213 274473 7031468
MLS00168
273896 7031640
MLS00214 274428 7031447
MLS00169
273941 7031662
MLS00215 274382 7031426
MLS00170
273987 7031683
MLS00216 274337 7031405
MLS00171
274032 7031704
MLS00217 274292 7031384
MLS00172
274077 7031725
MLS00218 274246 7031362
MLS00173
274123 7031746
MLS00219 274201 7031341
MLS00174
274168 7031767
MLS00220 274156 7031320
MLS00175
274213 7031788
MLS00221 274110 7031299
MLS00176
274259 7031809
MLS00222 274065 7031278
MLS00177
274304 7031831
MLS00223 274020 7031257
MLS00178
274349 7031852
MLS00224 273975 7031236
MLS00179
274395 7031873
MLS00225 273929 7031215
MLS00180
274440 7031894
MLS00226 274835 7031637
MLS00181
274495 7031892
MLS00227 274881 7031658
MLS00182
274531 7031936
MLS00228 274926 7031679
MLS00183
274576 7031957
MLS00229 274971 7031701
MLS00184
274621 7031979
MLS00230 275017 7031722
MLS00185
274666 7032000
MLS00231 275787 7032081
ASX Announcement 26 February 2024
Page 11
Table 2 – Soil Sampling Results, Ultrafine+ Analysis – Statistical Summary of Results.
Element
Detection
Limit
Min
Max
Mean
Median
Standard
Deviation
25th
75th
90th
95th
99th
Ag ppm
0.003
0.007
0.06
0.022
0.021
0.006
0.018
0.025
0.0284
0.0317
0.04578
Al ppm
10
22600
61800
19636.351
49975
75225
89630
102650
111530
As ppm
0.5
6.4
10.4
42.480
9.1
14.9
51.68
76.61
193.95
Au ppb
0.5
0.5
35
3.892
2.7
4.132
1.7
4.3
8.2
11.6
23.56
B ppm
10
11
352
146.700
145
68.536
97.5
196.5
229.2
250
333.64
Ba ppm
0.2
12.5
161
56.620
50.75
23.615
40.8
65.35
83.17
102.3
152.71
115000 63387.805
543
22.038
Percentiles
Be ppm
0.01
0.44
2.2
1.213
1.19
0.327
0.95
1.45
1.619
1.813
2.0053
Bi ppm
0.002
0.279
0.876
0.500
0.498
0.084
0.44475
0.545
0.5933
0.638
0.8268
Br ppm
1
1
10
4.067
4
1.635
3
5
6
7
9
Ca ppm
10
44
3070
165.175
115
248.944
90.75
153.25
258.9
386
1547.3
Cd ppm
0.004
0.006
0.257
0.031
0.0225
0.029
0.017
0.03225
0.0582
0.08265 0.16077
Ce ppm
0.05
10.7
72
33.015
31.2
10.796
25.275
38.85
47.86
53.965
Co ppm
0.01
3.77
30.2
11.064
9.395
5.066
7.33
13.325
18.05
21.965
28.801
Cr ppm
2
65
406
126.053
112
47.134
100
136
167
203.9
362.09
Cs ppm
0.03
2.47
7.34
4.547
4.505
0.786
4.05
4.99
5.633
5.853
7.018
Cu ppm
0.1
28
64.1
45.088
44.65
5.282
41.375
48.5
52.03
53.7
60.866
Fe ppm
50
46100
83500
63128.049
63200
5995.535
59675
66525
70660
73765
78730
Ga ppm
0.05
7.07
29.5
18.621
18.25
3.567
16.375
20.65
23.53
25.465
28.371
Ge ppm
0.05
0.05
0.3
0.116
0.11
0.042
0.09
0.13
0.17
0.1985
0.24
Hf ppm
0.002
0.003
1.12
0.290
0.221
0.226
0.11075
0.426
0.6448
0.73625 0.90638
Hg ppm
0.001
0.001
0.052
0.012
0.01
0.007
0.007
0.015
0.0215
0.025
64.412
0.04615
I ppm
1
1
37
8.508
7
5.034
5
10
15
19
27.06
In ppm
0.001
0.026
0.104
0.072
0.0715
0.010
0.066
0.078
0.083
0.087
0.09506
5126.5
K ppm
10
1060
5550
2623.496
2480
792.016
2110
3002.5
3678
4163
La ppm
0.05
6.88
31.7
18.302
18.2
4.746
14.8
21.325
24.73
26.73
29.283
Li ppm
0.05
4.09
35
15.829
15.7
5.463
11.7
19.325
23.03
24.93
32.112
Mg ppm
10
445
10200
1277.305
1045
1042.338
876.25
1300
1719
2656.5
7667.6
Mn ppm
0.5
88.9
2480
406.272
274
342.202
186
531
877.6
1076.5
1792.7
Mo ppm
0.03
0.46
9.09
2.279
1.93
1.270
1.73
2.2525
3.406
5.3215
8.6053
Nb ppm
0.01
0.13
1.13
0.451
0.45
0.138
0.35
0.54
0.63
0.6665
0.7306
Ni ppm
0.2
11.4
52.1
27.753
27.2
7.136
22.6
32
37.1
41
48.936
Pb ppm
0.05
10.5
33.3
21.072
20.65
4.197
17.85
24
26.23
28.23
32.571
Pd ppb
1
1
7
3.183
3
1.158
2
4
5
5
7
Pt ppb
1
1
6
2.586
2
1.071
2
3
4
5
5.72
Rb ppm
0.1
37.9
92.3
61.587
61.55
10.624
54.3
68
74.31
81.305
90.63
Re ppm
0.0001
0.00013
0.00010
0.00005
S ppm
5
7
1500
114.502
105
96.007
Sb ppm
0.001
0.237
2.26
0.478
0.3995
Sc ppm
0.2
10.6
26.4
17.126
16.8
Se ppm
0.05
0.9
1.95
1.273
Sn ppm
0.02
1.6
3.23
2.431
0.00010 0.00030
0.00010 0.00020 0.00020 0.00020 0.00030
88.5
128
151
169.1
299.8
0.249
0.36
0.47425
0.6919
1.0187
1.6071
2.873
15.075
19.1
20.6
22.165
26.3
1.265
0.207
1.1175
1.3825
1.533
1.6695
1.8971
2.415
0.309
2.23
2.6225
2.89
2.9565
3.0777
Sr ppm
0.1
6.6
44.7
24.609
23.95
7.583
19.175
29.2
35.03
38.12
42.33
Ta ppm
0.001
0.001
0.029
0.005
0.004
0.004
0.003
0.006
0.009
0.012
0.0212
Te ppm
0.001
0.032
0.249
0.076
0.072
0.023
0.06275 0.08325
0.0953
0.1162
0.17565
Th ppm
0.02
5.27
17.1
10.099
10.1
1.961
8.635
12.5
13.03
15.306
ASX Announcement 26 February 2024
11.425
Page 12
Element
Detection
Limit
Min
Max
Mean
Median
Standard
Deviation
25th
75th
90th
95th
99th
Ti ppm
2
281
1810
737.821
714
199.464
610.75
835
954.8
1073
1501.9
Tl ppm
0.003
0.173
0.441
0.304
0.296
0.052
0.266
0.337
0.385
0.39965 0.43853
U ppm
0.003
0.854
6.04
3.621
3.57
0.845
3.075
4.29
4.743
4.986
5.9912
V ppm
1
105
210
145.703
144
18.997
133
156.25
169.6
185.65
203.53
W ppm
0.001
0.002
0.638
0.208
0.2065
0.091
0.1435
0.27625
0.3149
0.3446
0.4896
Y ppm
0.05
2.48
24.4
7.904
6.86
3.737
4.965
10.325
13.1
14.865
18.824
Zn ppm
0.2
25.5
140
59.684
57.25
15.185
49.475
68.925
80.56
85.28
97.86
Zr ppm
0.1
0.2
48.7
13.664
12.2
8.890
6.55
19.45
26.3
30.3
38.716
ASX Announcement 26 February 2024
Percentiles
Page 13
Appendix 1 – Ironstone Well-Barwidgee Gold Project
JORC Code (2012) Table 1, Sections 1 and 2
Mr Christopher Oorschot, Exploration Manager of Yandal Resources, compiled the information in Section 1 and Section 2 of the following JORC Table 1 and is the
Competent Person for those sections. The following Table and Sections are provided to ensure compliance with the JORC Code (2012 edition) requirements for the
reporting of Exploration Results.
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random chips,
or specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down
hole gamma sondes, or handheld XRF instruments, etc.). These
examples should not be taken as limiting the broad meaning of
sampling.
•
A total of 247 Soil samples were collected over two trial areas utilising a 50m sample spacing on 400m
spaced west-southwest to east-northeast (065°) oriented lines (six lines completed in total). Samples
were collected from a depth between 0.2m and 0.3m. Samples were sieved in the field using a <1.6mm
mesh, and the finer fraction was transferred to a pre-labelled kraft sample packet. A minimum of 200g
of sample was collected for each site. Samples were then transported to Perth and delivered to Lab
West for analysis. At Lab West, samples were analysed using the Ultrafine+ method, where the <2µ
fraction is separated and collected for gold plus multielement analysis by ICP-MS/OES (lab code UFFPE). A list of elements analysed with detection limits is described in Table 2.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
•
Soil samples were collected at 50m by 400m spacing with the 400m spaced lines oriented towards 065°
(grid north), deemed appropriate for a trial soil sampling survey. This orientation is orthogonal to regional
stratigraphic trends and first-order shear zones.
Aspects of the determination of mineralisation that are Material
to the Public Report. In cases where ‘industry standard’ work
has been done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples from which 3
kg was pulverised to produce a 30 g charge for fire assay’). In
other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed information.
•
The completed soil sampling program was a trial program completed in preparation for a broader
regional soil sampling program to determine the ideal sample spacing and the effectiveness of the
analysis method. For this reason, the location of the trial survey was deliberately completed along strike
of known mineralisation and contrasting rock types. In analysing the results, anomalies were determined
using statistical analysis of the data population for a single element and groups of elements results
relative to the underlying geology and surface geomorphology. Soil samples were submitted to Lab
West in Perth, Western Australia, for Ultrafine+ Analysis.
Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented and if so, by
what method, etc).
•
No new drilling data is included within this release.
Drilling
techniques
ASX Announcement 26 February 2024
Page 14
Criteria
JORC Code explanation
Commentary
Drill sample
recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.
•
No new drilling data is included within this release.
•
Observations regarding the sample substrate and notable landform changes were logged during sample
collection, along with a photo of the sample adjacent to the collection site.
All observations are qualitative in nature.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists
Share your feedback
Discover