Further RC Drilling Results From Siona
Released
Released
Announcement PDF
ASX Announcement
25 November 2024
Further RC Results from the Emerging Siona Gold Discovery
Follow-up RC Program Expanded
•
The first assay results from the follow-up RC program across the emerging Siona
Gold Discovery have been received. Ten RC holes have been completed across
Siona for 2,200m of drilling, testing approximately 500m of strike.
•
24IWBRC0039 re-entry extended the original intercept by 29m to:
o
•
107m*1 @ 1.0 g/t Au from 96m to EOH (estimated true width of ~30m),
including:
5m*1 @ 3.2 g/t Au from 109m, and
33m*1 @ 1.4g/t Au from 139m
A scissor hole to the 24IWBRC0039 intercept returned:
o
35m*1 @ 1.0g/t Au from 122m in 24IWBRC0046 (estimated true width of
~28m), including
•
28m*1 @ 1.4g/t Au from 131m, and
24IWBRC0047, located approximately 40m along strike of 24IWBRC0039 returned
an intercept of:
o
80m*1 @ 1.0g/t Au from 67m (estimated true width of ~28m), including
5m*1 @ 3.2 g/t Au from 109m, and
33m*1 @ 1.4g/t Au from 83m
•
The interpreted geometry of mineralisation is sub-vertical, dipping variably to the
southwest or northeast and striking to the northwest.
•
The RC program at Siona has been extended, and preparations are being made
for diamond drilling.
•
Drilling focus will now shift to testing structural targets proximal to Siona
*1 All intercept lengths are reported as down-hole lengths as the true width is uncertain; an
estimate of true width is provided for the primary Siona intercepts.
For further information or to ask questions in relation to this announcement, please visit our
Investor Hub at https://investorhub.yandalresources.com.au/link/lejllP
Contact Us
A: Level 1 Unit 5/62 Ord Street,
West Perth WA 6005
T: +61 (0)8 9389 9021
E: yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL
Board and Management
Chris Oorschot
Managing Director/CEO
Greg Evans
Non-Exec Chair
Katina Law
Non-Exec Director
Tim Kennedy
Non-Exec Director
Greg Fitzgerald
Company Secretary
Commenting on the new results and observations, Yandal Resources’ Managing Director,
Mr. Chris Oorschot, said: “These initial results and geological observations enable the
exploration team to verify the approximate geometry of mineralisation at Siona. This
confirms the current geological model the technical team is applying to target further
mineralisation across Siona, and we are looking forward to seeing further results over the
coming weeks.
With the approximate geometry of mineralisation confirmed, RC drilling will now focus on
testing the broader extent of mineralisation and targeting potential parallel positions while
the team awaits further results. Testing these Siona adjacent positions will provide an early
indication of the magnitude of the broader mineralised system across the New England
Granite.
Mineralisation is very visual, which is excellent, as it allows the team to make real-time
interpretations and decisions regarding the current drill program. The exploration team will
continue to refine and expand the drilling program as geological observations are made.”
Yandal Resources Ltd (ASX: YRL, “Yandal Resources” or the “Company”) is pleased to advise that
it has received the first assay results from the follow-up RC program at the Siona Gold Discovery
that commenced earlier in November. A total of ten RC holes have been drilled since RC drilling
commenced, for a total of 2,200m. In addition to this, five of the six remaining RC holes from the
October RC drilling program testing structural targets across the large-scale New England Granite
target area (NEG) have also been received.
The New England Granite target area (within E 53/1843) is part of the broader Ironstone Well–
Barwidgee (IWB) Gold Project (see Figure 6), located approximately 45km north of Northern Star’s
(ASX: NST) Bronzewing mining centre and 75km south of the Jundee mining centre (ASX: NST),
within the Yandal Greenstone Belt.
The first results from the follow-up drilling at Siona confirm mineralisation is sub-vertical and dipping
variably to the northeast or southwest along strike. Results have also confirmed mineralisation
continuity along the strike to the northwest. Geological observation for completed RC holes
suggests mineralisation strikes parallel to the northwest-trending granodiorite-basalt contact.
The current follow-up RC program has been expanded and will focus on testing structural targets
proximal to Siona while the exploration team waits for additional results. RC drilling will continue
through to late December. In addition to RC drilling, preparations are being made for the
mobilisation of a diamond rig to Siona.
yandalresources.com.au | ASX:YRL
2
Figure 1: Plan view over the emerging Siona discovery area displaying all drilling and drill traces. Previous RAB
and AC drilling collars are colour-coded by max Au (g/t) in the hole. A simple projection of the granodiorite-basalt
contact is shown in dashed magenta. Underlying the plan is a composite aerial magnetic image (total magnetic
intensity and reduce-to-pole first vertical derivative).
yandalresources.com.au | ASX:YRL
3
Section A
SW
NE
Surface
Transported
Cover
BOT
BOCO
Basalt
New England
Granite
24IWBRC0046
35m @ 1.0 g/t Au
Incl. 7m @ 1.4 g/t Au
& 5m @ 2.5g/t Au
24IWBRC0039
107m @ 1.0 g/t Au
Incl. 5m @ 3.2 g/t Au
& 33m @ 1.4 g/t Au
Figure 2: Cross section A, across Siona, showing mineralisation intercepted in 24IWBRC0039, including 107m @
1.0g/t Au from 96m down-hole to bottom of the hole. The mineralisation is open downhole, down dip and along
strike. See Figures 1 and 4 for the location of the section in the plan. The section shows all drilling +/-25m away
from the section plane.
yandalresources.com.au | ASX:YRL
4
SW
NE
Section B
Surface
Transported
Cover
BOT
23m @ 0.4 g/t Au
Incl. 5m @ 1.1 g/t Au
Possible Au depletion
BOCO
24IWBRC0047
80m @ 1.0 g/t Au
Incl. 20m @ 1.4 g/t Au
& 7m @ 1.4 g/t Au
TOFR
New England
Granite
Basalt
Figure 3: Cross section B, across Siona, showing mineralisation intercepted in 24IWBRC0047, including 80m @
1.0g/t Au from 67m down-hole to bottom of the hole. The mineralisation is open downhole, down dip and along
strike. See Figures 1 and 4 for the location of the section in the plan. The section shows all drilling +/-25m away
from the section plane.
yandalresources.com.au | ASX:YRL
5
Figure 4: A Collar plan for the broader New England Granite area displaying all drilling collars, colourcoded by max Au in hole (g/t Au), overlying a simplified interpretation of bedrock geology. Note
interpreted northwest trending structures internal to the New England Granite. The inset labelled Figure
1 shows the extent of the Siona collar plan illustrated in Figure 1.
yandalresources.com.au | ASX:YRL
6
Siona RC Drilling Results
*1 All intercept lengths are reported as down-hole lengths as the true width is
uncertain. An estimate of true width is provided for primary Siona intercepts.
The re-entry of 24IWBRC0039 extended the hole 29m to a depth of 203m (see Figure 2).
Unfortunately, the RC collar became unstable, and the hole had to be abandoned, with the
hole ending in mineralisation. Results from the additional 29m drilled extend the original
intercept reported to the ASX on 21 October to:
o
107m*1 @ 1.0 g/t Au from 96m to EOH (estimated true width of ~30m),
including:
5m*1 @ 3.2 g/t Au from 109m, and
33m*1 @ 1.4g/t Au from 139m
Interpretations using the results from 24IWBRC0046 and 24IWBRC0047 suggest the RC hole
was approaching the edge of mineralisation at 203m. Modelling of the structural
granodiorite contact indicated the intrusive contact dips very steeply to the southwest on
Section A. The intrusive contact then transitions to the northeast, dipping along strike to the
northwest. The approximate true width of mineralisation is interpreted to be approximately
30m within section A; however, additional drilling is needed to validate this.
Results from 24IWBRC0046, a scissor designed to test the approximate dip of mineralisation
with 24IWBRC0039 (see Figure 2), returned a significant intercept of:
o
35m @ 1.0g/t Au from 122m (estimated true width of ~30m), including,
7m @ 1.4g/t Au from 131m, and
5m @ 2.5g/t Au from 145m
Similar to 24IWBRC0039, gold mineralisation is associated with foliated and/or fractured
granodiorite pervasively silica-sericite altered with disseminations or stringers of pyrite and
arsenopyrite. Higher-grade intervals are associated with increased quartz veining and
increased arsenopyrite.
RC hole 24IWBRC0047 was drilled 40m to the northwest of 24IWBRC0039 and was designed
to test the continuity of mineralisation to the northwest, parallel to the structural granodiorite
contact (see Figure 3), and returned a significant intercept of:
o
80m*1 @ 1.0g/t Au from 67m (estimated true width of ~28m), including
5m*1 @ 3.2 g/t Au from 109m, and
33m*1 @ 1.4g/t Au from 83m
yandalresources.com.au | ASX:YRL
7
Within 24IWBRC0047, the contact between the host granodiorite and basalt was intercepted
within the transitional weathering zone and returned a low-grade intercept of:
o
23m*1 @ 0.4 g/t Au from 38m (using a lower cutoff grade of >0.1 g/t Au)
This result may suggest mineralisation is present at shallower depths but is possibly depleted
relative to mineralisation within fresh rock when the host is completely to partially oxidised.
Significant intercepts are shown in Figures 1 to 3 and listed in Tables 2 and 3 at the end of this
release. All intercept lengths are reported as down-hole lengths as the true width is uncertain.
An estimate of true width is provided for primary Siona intercepts.
Geological Observations
Modelling suggests that the structural granodiorite-basalt contact is sub-vertical, variably
dipping to the northeast or southwest and striking towards the northeast. It is unknown if the
intrusive contact is a significant control of mineralisation.
Based on current observations, a broad zone of moderate to intense silica-sericite alteration
with fine disseminated pyrite and arsenopyrite broadly envelopes mineralisation within the
host granodiorite (New England Granite). Within this broad envelope is a more intensely
deformed (with both brittle and ductile textures) zone characterised by increased sulphides
with arsenopyrite as the dominant sulphide phase and increased quartz veining as both
laminar veins and irregular fracture fill veins (see Figure 5). This more intensely deformed zone
correlates with broad intervals of mineralisation when compared to current lab results.
On interpreted sections, the structural granodiorite-basalt contact varies from dipping
steeply towards the southwest and northeast along strike from southeast to the northwest
(see Figure 3). The cause of these subtle dip changes is currently unknown.
Expansion of the RC Program
With the completion of the initial follow-up RC program, RC drilling will now look to begin
testing structural targets that are proximal to Siona (see Figure 1). These targets include:
o
Testing north-west trending magnetic low directly along strike to Siona
o
Testing a parallel magnetic low to the southwest and directly adjacent to Siona
o
Testing the north-northeast trending intrusive margin directly north of Siona.
yandalresources.com.au | ASX:YRL
8
80-81m
0.5 g/t Au
81-82m
0.8g/t Au
82-83m
0.6g/t Au
83-84m
3.8g/t Au
24IWBRC0047
Figure 1: RC chips from 24IWBRC0047, 80-84m, showing alteration and veining typical
of mineralisation at Siona.
New England Granite RC results
The results from five of the remaining six RC holes designed to test structural targets across
the broader New England Granite target area that were completed in October have been
received. They are summarised in Tables 2 and 3. Results demonstrate elevated gold
associated with several early-stage structural targets across the broad-scale New England
Granite. These results will be further assessed as more geological details regarding Siona are
received.
Next Steps
Further results from the RC drilling program are expected over the coming weeks.
The exploration team has expanded the current follow-up RC drilling program at Siona and
commenced preparation for diamond drilling. Subject to weather conditions, diamond
drilling will commence in either December 2024 or January 2025. While the Company awaits
further RC results, drilling will focus on testing structural targets adjacent to Siona.
In addition to the above, the exploration team will commence collecting geochemical data
to aid in characterising and targeting mineralisation. The planning of several geophysical
investigations is also underway, including more detailed ground gravity and passive seismic
yandalresources.com.au | ASX:YRL
9
Figure 2: A simplified geology plan across the IWB Gold Project shows active prospects and
exploration target areas, including the New England Granite Prospect to the southeast.
yandalresources.com.au | ASX:YRL
10
Looking Ahead
The Company has a very active end of CY 2024 scheduled with exploration activities and
news flow, including;
1.
Results from the ongoing follow-up RC drilling across Siona will continue to be received
over the coming weeks;
2.
Air-core drilling results from across the Caladan and Irulan target areas are anticipated
in 3-6 weeks;
3.
Subject to weather conditions, diamond drilling at Siona will commence in December
2024 or January 2025;
4.
Results from the second phase of soil sampling covering the broader Caladan target
have been received and will be released once processing and analysis are complete.
Authorised by the board of Yandal Resources
For further information, please contact:
Chris Oorschot
Managing Director
Yandal Resources Limited
yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL
Greg Fitzgerald
Company Secretary
+61 8 9389 9021
yandal@yandalresources.com.au
11
About Yandal Resources Limited
Yandal Resources has a portfolio of advanced gold exploration projects in the highly prospective Yandal
and Norseman-Wiluna Greenstone Belts of Western Australia.
Yandal Resources’ gold project locations.
Table 1 – Yandal Resources Ltd - Mineral Resource Summary
Indicated
Inferred
Deposit
Tonnes Grade
Au
Tonnes
Grade
Au
(‘000s)
(g/t)
(oz)
(‘000)
(g/t)
(oz)
Ironstone Well
Flushing Meadows1
2,141
1.3
91,000
5,245
1.1
177,000
Mt McClure
Challenger2
718
1.9
44,000
3
Success
1,255
1.9
75,000
Parmelia4
252
2.1
17,000
5
HMS Sulphur
1010
1.2
39,000
6
Gilmore
134
1.7
7,200
Sub-total - MMC
3,369
1.7
182,200
Gordons
Gordons Dam7
365
1.7
20,000
2,141
Grand-total8
8,979
1.3
379,200
1.3
91,000
Total
Tonnes
(000’s)
Grade
(g/t)
Au
(Oz)
7,386
1.1
268,000
718
1.9
44,000
1,255
1.9
75,000
252
2.1
17,000
1010
1.2
39,000
134
3,369
1.7
1.7
7,200
182,200
365
1.7
20,000
11,120
1.4
470,200
Due to the effects of rounding, totals may not represent the sum of the individual components.
1. Reported above 0.5g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 4 November 2020 for full
details. 2. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 22 August 2022 for full
details 3. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 6 September 2022 for
full details.4. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 20 September 2022
for full details 5. Reported above 0.5g/t Au lower cut-off grade within this announcement 6. Reported above 1.0g/t Au lower cut-off
grade within this announcement 7. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement
dated 6 April 2023 for full details 8. All Resources are reported as global estimates, not constrained by optimised pit shells.
yandalresources.com.au | ASX:YRL
12
Competent Person Statement
The information in this document related to Exploration Targets and Exploration Results, geology and data
compilation is based on information reviewed or compiled by Mr Christopher Oorschot, a Competent
Person who is a Member of The Australasian Institute Geoscientists. Mr Oorschot is the Managing Director
of the Company, is a full-time employee and holds shares and options in the Company. Mr Oorschot has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Oorschot consents to the inclusion in this announcement of the matters based on this information in the
form and context in which it appears.
The information in this announcement that relates to the Flushing Meadows, Mt McClure and Gordons Dam
Mineral Resource Estimates is based on information compiled and generated by Andrew Bewsher, an
employee of BM Geological Services Pty Ltd (“BMGS”). Both Andrew Bewsher and BMGS hold shares in
the company. BMGS consents to the inclusion, form and context of the relevant information herein as
derived from the original resource reports. Mr Bewsher has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration and to the activity which is being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the JORC ‘Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves’.
YRL confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement. The company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
Forward Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include, but
are not limited to, statements concerning Yandal Resources Limited’s (Yandal’s) current expectations,
estimates and projections about the industry in which Yandal operates, and beliefs and assumptions
regarding Yandal’s future performance. When used in this document, words such as “anticipate”, “could”,
“plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are
forward-looking statements. Although Yandal believes that its expectations reflected in these forwardlooking statements are reasonable, such statements are subject to known and unknown risks, uncertainties
and other factors, some of which are beyond the control of Yandal and no assurance can be given that
actual results will be consistent with these forward-looking statements. Drilling results presented indicate
geological potential for mineralisation but there can be no certainty that these results will eventually form
part of a Mineral Resource Estimate.
yandalresources.com.au | ASX:YRL
13
Table 2 – New England Granite RC collar location summary for this release. Please note that assays
for holes with collar IDs that are not in bold font have not yet been received.
Prospect
Hole ID
Hole
type
East
NEG
24IWBRC0037
RC
NEG
24IWBRC0038
RC
Siona
24IWBRC0039
NEG
(m)
North
RL
Azimuth
Dip
Total
Depth
(m)
(mAHD)
(degrees)
(degrees)
295880.7
7013356.7
504.9
225.7
-60.5
252
295710.2
7013403.6
506.1
225.9
-59.5
192
RC reentry
295770.0
7013651.8
505.0
226.0
-60.4
24IWBRC0040
RC
295539.1
7011690.5
497.6
225.3
-60.4
204
NEG
24IWBRC0041
RC
295505.1
7011863.1
498.3
271.1
-60.8
198
NEG
24IWBRC0042
RC
295151.0
7011956.8
498.8
225.3
-59.9
168
NEG
24IWBRC0043
RC
295200.6
7012019.0
499.4
225.4
-60.2
252
Siona
24IWBRC0046
RC
295671.0
7013551.0
505.7
46.3
-60.6
221
Siona
24IWBRC0047
RC
295720.6
7013649.5
504.1
223.2
-70.5
197
Siona
24IWBRC0048
RC
295588.0
7013647.7
502.8
46.9
-59.9
180
Siona
24IWBRC0049
RC
295632.0
7013746.0
505.2
226.9
-69.3
185
Siona
24IWBRC0050
RC
295521.0
7013746.0
505.4
46.0
-60.8
191
Siona
24IWBRC0051
RC
295543.0
7013853.0
502.6
225.0
-60.0
131
Siona
24IWBRC0052
RC
295430.0
7013804.0
503.3
45.5
-60.0
305
`Siona
24IWBRC0053
RC
295590.0
7013855.0
502.6
224.5
-59.6
197
Siona
24IWBRC0054
RC
295820.0
7013638.0
505.9
225.0
-70.0
353
Siona
24IWBRC0055
RC
295868.1
7013555.6
506.4
227.66
-60.3
In-Progress
(m)
203
Table 3 – New England Granite - Summary of significant RC drilling assay results >0.3g/t Au with no
more than 2m of continuous internal waste included unless otherwise stated. All intercept lengths are
reported as down-hole lengths, and an estimate of true width is provided for Siona intercepts.
Hole
ID
Sample
type /
Sub
From
(m)
To
(m)
Interval
(m)
Au
(g/t)
Comment
1m RC
138
139
1
0.6
Fresh rock
24IWBRC0037
1m RC
148
155
7
0.3
Fresh rock
24IWBRC0037
1m RC
208
210
2
0.8
Fresh rock
24IWBRC0038
1m RC
78
79
1
0.6
Transitional
24IWBRC0038
1m RC
88
89
1
0.7
Transitional
24IWBRC0039
re-reported
96
203
107
1
Fresh rock – True width ~ 30m
24IWBRC0039
Including
109
114
5
3.2
Fresh rock
24IWBRC0039
Including
139
172
33
1.4
Fresh rock
24IWBRC0040
1m RC
196
203
7
0.7
Fresh rock
24IWBRC0041
1m RC
44
45
1
0.5
Oxide
24IWBRC0041
1m RC
52
55
3
0.3
Oxide
24IWBRC0043
1m RC
112
113
1
0.5
Fresh rock
24IWBRC0046
1m RC
122
157
35
1
Fresh rock
24IWBRC0046
Including
131
138
7
1.4
Fresh rock
24IWBRC0037
yandalresources.com.au | ASX:YRL
14
Sample
type /
Sub
From
(m)
To
(m)
Including
145
24IWBRC0047
1m RC
38
24IWBRC0047
1m RC
24IWBRC0047
Including
Hole
ID
24IWBRC0046
Interval
(m)
Au
(g/t)
150
5
2.5
Fresh rock
60
22
0.4
67
147
80
1
83
111
28
1.4
Transitional – uses a >0.1g/t Au lower
cutoff grade
Fresh rock from 78m – True width
~28m
Fresh rock
yandalresources.com.au | ASX:YRL
Comment
15
Appendix 1 – Ironstone Well-Barwidgee Gold Project, New England Granite Prospect
JORC Code (2012) Table 1, Sections 1 and 2
Mr Christopher Oorschot, Managing Director of Yandal Resources, compiled the information in Section 1 and Section 2 of the following JORC Table 1 and
is the Competent Person for those sections. The following Table and Sections are provided to ensure compliance with the JORC Code (2012 edition)
requirements for the reporting of Exploration Results.
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
•
•
•
•
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
•
•
Aspects of the determination of mineralisation that are
Material to the Public Report. In cases where ‘industry
standard’ work has been done this would be relatively
ASX Announcement 25 November 2024
•
Yandal Resources has completed RC drilling across several structural targets within the New
England Granite Prospect, including Siona. The drilling involved 5.5-inch face sampling bit
down to an average down-hole depth of 210m (between 168m to 266m. Hole were drilled at
an angle of -60° either to the southwest or directly west. Groundwater was encountered during
the process of drilling; however, water volumes were well managed, and did not impact
sample quality.
Yandal Resources (YRL) RC drilling samples were collected via a rig-mounted static cone
splitter, splitting approximately 12.5% of the total sample volume. Two splits are collected for
each metre: a primary and duplicate sample. The primary 1m samples are then sent to a lab
for further analysis. The duplicate samples are retained on-site unless they are submitted as
routine duplicates.
For historical RC drilling, sampling practices by previous operators are assumed to be industry
standard at that time. Sampling procedures would be comparable to those applied by Yandal
Resources as per the above but with variations in the type of splitter used, etc.
A majority of historic RAB, air-core and RC drilling data is derived from open file WAMEX reports,
A068334, A071954. These results have been previously disclosed in the Company Prospectus.
For YRL RC drilling, the cone splitter is regularly cleaned and inspected. The 1m bulk samples
are laid out in drill order. These bulk samples are regularly inspected for contamination, and
the volume of the bulk sample is monitored. These bulk samples are retained until all results are
received and may be used to collect additional field duplicates to verify lab results, logged
geology or any other form of analysis. If the bulk sample appears visually low in volume or
weight, this is recorded with the sample details. The same applies to damp or wet samples.
Two splits are collected for each drilled metre: a primary and a secondary sample. The
Secondary sample is retained on-site and may be used to collect additional field duplicates
to verify lab results, logged geology or any other form of analysis
For all results, RC drilling was used to obtain 1m samples from which a portion, between 1-5kg
in weight, was crushed and pulverised to produce a 50g charge for fire assay with an AAS
(atomic absorption spectroscopy) finish for gold determination with a 0.01ppm detection limit.
Page 16
Criteria
JORC Code explanation
Commentary
simple (e.g. ‘reverse circulation drilling was used to obtain
1 m samples from which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed information.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (e.g. core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type, whether
core is oriented and if so, by what method, etc).
•
For YRL RC drilling, a 139mm diameter face sampling bit and hammer was used.
Drill sample
recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.
•
For YRL holes, RC drilling recoveries are visually assessed by the supervising geologist, and any
low-volume or weight samples are recorded, along with any damp or wet samples. Drill depths
are routinely verified at the completion of each drill rod (every 6m). The cone splitter is checked
for each drill site to ensure it is completely upright and level. Sample collection from the splitter
by drilling off-siders is monitored for any inefficiencies. For deeper holes, larger drilling
equipment is used, with boosted air pressure, to ensure samples are recovered and
groundwater is controlled as much as reasonably possible.
Within the limited drilling completed, there appears to be no correlation between sample
recovery and sample grade.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Logging
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
•
•
•
•
ASX Announcement 25 November 2024
For YRL drilling, all RC holes have been logged in full by a qualified and experienced geologist.
RC chips and fines from each 1m interval drilled are inspected and logged for colour,
weathering, lithology, deformation, veining and sulphide species. All 1m samples are sieved
and retained in labelled and annotated chip trays. Chip trays are transported to Perth for longterm storage and are available for review. The quality of logging information is considered
sufficient to support Mineral Resource Estimation studies.
Historic geological logging is limited in detail but provides sufficient information regarding
lithology, weathering, and mineralisation. It is assumed that previous project operators used
industry standard logging procedures comparable to those used by YRL above.
Data captured through geological logging by a geologist is qualitative in nature.
Page 17
Criteria
Sub-sampling
techniques
and sample
preparation
JORC Code explanation
Commentary
The total length and percentage of the relevant
intersections logged.
•
If core, whether cut or sawn and whether quarter, half or
all core taken.
•
If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
•
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
•
•
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
•
In addition to geological logging, the magnetic susceptibility of each interval is measured using
a KT-10 magnetic susceptibility metre, with a sensitivity of 1x10-6 SI Units. Magnetic susceptibility
readings are quantitative in nature.
YRL RC drilling utilised a rig-mounted cone splitter installed directly below and in line with the
rig-mounted cyclone. Two 1-5kg sub-samples are collected into calico bags labelled with a
unique alpha-numeric ID. Most samples collected were dry; if samples were damp or wet, this
was noted in the sample records.
For all YRL
Share your feedback
Discover