South-west Connect Presentation
Released
Released
Announcement PDF
Discovery &
Resource Growth
in WA’s Tier-1
Gold Belts
South-West Connect | 16th October 2024
ASX:YRL
yandalresources.com.au
Visit our InvestorHub at:
https://investorhub.yandalresources.com.au
IMPORTANT INFORMATION
Disclaimers
FORWARD LOOKING STATEMENT
COMPETENT PERSONS STATEMENT
This presentation has been prepared by Yandal Resources Ltd (“Yandal” or “YRL”). The information contained in this presentation is a
The information in this document that relates to Exploration Results, geology and data compilation is
professional opinion only and is given in good faith. Certain information in this document has been derived from third parties and though YRL has
based on information reviewed or compiled by Mr Chris Oorshcot, a Competent Person who is a
no reason to believe that it is not accurate, reliable or complete, it has not been independently audited or verified by YRL. This presentation is in
Member of The Australasian Institute Geoscientists. Mr Oorschot is the Managing Director of the
summary form and does not purport to be all inclusive or complete. Recipients should conduct their own investigations and perform their own
Company, is a full-time employee and holds shares and options in the Company. Mr Oorschot has
analysis in order to satisfy themselves as to the accuracy and completeness of the information, statements and opinions contained.
sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined
This is for information purposes only. Neither this nor the information contained in it constitutes an offer, invitation, solicitation or recommendation
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
in relation to the purchase or sale of YRL shares in any jurisdiction. This does not constitute investment advice and has been prepared without
Ore Reserves’. Mr Oorschot consents to the inclusion in this announcement of the matters based on this
taking into account the recipient’s investment objectives, financial circumstances or particular needs and the opinions and recommendations
information in the form and context in which it appears.
in this presentation are not intended to represent recommendations of particular investments to particular persons. Recipients should seek
professional advice when deciding if an investment is appropriate. All securities transactions involve risks, which include (among others) the risk
The information in this announcement that relates to the Flushing Meadows, Mt McClure and Gordons
of adverse or unanticipated market, financial or political developments.
Dam Mineral Resource Estimates is based on information compiled and generated by Andrew
Bewsher, an employee of BM Geological Services Pty Ltd (“BMGS”). Both Andrew Bewsher and BMGS
To the fullest extent permitted by law, YRL, its officers, employees, related bodies corporate, agents and advisers do not make any
hold shares in the company. BMGS consents to the inclusion, form and context of the relevant
representation or warranty, express or implied, as to the currency, accuracy, reliability or completeness of any information, statements, opinions,
information herein as derived from the original resource reports. Mr Bewsher has sufficient experience
estimates, forecasts or other representations contained in this presentation. No responsibility for any errors or omissions from this arising out of
relevant to the style of mineralization and type of deposit under consideration and to the activity which
negligence or otherwise is accepted.
is being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the JORC
Any forward-looking statements included in this document involve subjective judgment and analysis and are subject to uncertainties, risks and
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.
contingencies, many of which are outside the control of, and may be unknown to YRL. In particular, they speak only as of the date of this
YRL confirms that it is not aware of any new information or data that materially affects the information
document, they assume the success of YRL’s strategies, and they are subject to significant regulatory, business, competitive and economic
included in the original market announcements. The company confirms that the form and context in
uncertainties and risks. Actual future events may vary materially from the forward-looking statements and the assumptions on which the forward-
which the Competent Person’s findings are presented have not been materially modified from the
looking statements are based. Recipients of this document are cautionead to not place undue reliance on such forward-looking statements.
original market announcements.
ASX: YRL | YANDALRESOURCES. COM. AU
02
YANDAL RESOURCES
BUSINESS MODEL
Objective
Increase shareholder value through the discovery of
substantial gold Resources in areas with a low
threshold to development and/or clear monetisation
pathways
Strategy
Reduce geological risk by focusing on belts that have
demonstrated Tier-1 gold discovery potential
Increase the probability of success by applying a
rigorous scientific approach in under explored areas
Mitigate development risk by leveraging established
infrastructure (haul roads/milling capacity)
YANDAL RESOURCES HIGHLIGHTS
KEY INVESTMENT HIGHLIGHTS
Three Strategically Located Projects in Tier-1 Belts in WA
Current Resource Inventory of 0.47Moz Au (granted ML’s)
Demonstrated Potential For Significant Discoveries
Focused, Funded, Technically Driven and Determined
Highly Leveraged to Exploration Success
CORPORATE OVERVIEW
A STRONGLY SUPPORTIVE SHARE REGISTER
CAPITAL STRUCTURE
SHAREHOLDERS
267.8M
Board, Management, Founders
Shares On Issue
76.5M
$5.8M
Options
Cash
(30/6/2024)
10.0c
~$26.7M
Share Price
(15/10/2024)
~$20.9M
Enterprise Value
Gold Road
Other
Market Cap
Au Xingao
~83%
Top 20 Holding
ASX: YRL | YANDALRESOURCES. COM. AU
Alianda Oaks (E. Eshuys)
Datt Capital
Regal Funds
BOARD & MANAGEMENT
EFFECTIVE BOARD & MANAGEMENT TEAM
EXPLORATION & DEVELOPMENT
| PROJECT FINANCE
| STRATEGY
| GOVERNANCE
Chris Oorschot
Managing Director & CEO
Greg Evans
Non-Executive Chair
Katina Law
Non-Executive Director
BSc (Hons 1st Class), MAIG, MSEG
BCom, DipApp Fin, GAICD
BCom, FCPA, MBA, GAICD
• Exploration Geologist with +15yrs experience
predominantly in the Western Australian gold
sector
• Expertise in complex stratigraphic environments
• +25yrs in investment banking in the mining and
resources sector
• Corporate and Financial Advisor to public
• +30yrs experience in the mining industry
covering corporate and site-based finance
roles across several continents
• Has held senior positions at Newmont Mining
and structurally controlled mineralised systems
companies and large private business owners
across multiple sectors
Tim Kennedy
Non-Executive Director
Owen Casey
Exploration Manager
Eduard Eshuys
Strategic/Technical Advisor
BApp Sc (Geol), MBA, MAusIMM, MGSA
BSc (Hons), MAIG
BSc, FAusIMM, FAICD
• Geologist with +35yrs experience
• Exploration, Feasibility and Development
• Involvement in significant discoveries including;
• Karlawinda & Tropicana (Au), Rosie (Ni), Triumph
(Zn-Cu)
ASX: YRL | YANDALRESOURCES. COM. AU
• Exploration geologist with + 14yrs experience
predominantly in the Western Australia gold
sector
• Strong background in WA gold exploration,
management and project development
Corporation’s head office in Denver, USA
• Highly successful explorer and gold industry
executive.
• Led teams in discovery of numerous gold
deposits including Plutonic, Jundee and
Bronzewing
• Former Executive Chairman of DGO Gold
6
SIGNIFICANT DISCOVERY POTENTIAL
STRATEGICALLY LOCATED PROJECTS
Ironstone Well – Barwidgee: Flagship Project
• Tenements cover > 53km of strike between Jundee (ASX: NST)and
Bronzewing (ASX: NST)
Mt McClure
• >12km long gold system located 15km south-west of Bronzewing mill and
adjacent to the Orelia mine (ASX: NST)
Gordons
• High-grade prospects in a similar structural setting to Kanowna Belle
(ASX: NST) and Paddington (Norton) 30km from Kalgoorlie
All Projects
• Combined Resources of 470,200oz1 gold on granted mining leases
• Located in Proven Tier 1 gold producing belts close to operating mines
and infrastructure
1. Refer to supplementary information at the back of this presentation for further details of all Resources
ASX: YRL | YANDALRESOURCES. COM. AU
7
Flagship Project
IRONSTONE WELL – BARWIDGEE
Located in the Yandal Belt - A true Tier 1 gold belt
• +20Moz endowment and growing
• Numerous deposits ranging from +1Moz to +10Moz
Strong potential for further discoveries
• Relatively short exploration history (ca. 30 years vs. +100 years in
other belts)
• Less than 2% outcrop has sidelined traditional prospecting methods
Well-positioned near existing mines and infrastructure
• 268,000oz Resource on granted mining leases 55km from Jundee
• Located centrally between Bronzewing and Jundee
ASX: YRL | YANDALRESOURCES. COM. AU
8
IRONSTONE WELL & BARWIDGEE
ALL THE INGREDIENTS FOR A DISCOVERY
Excellent geological setting
• Fertile regional and second-order structures
• Prospective stratigraphy
• Spatial distribution of major deposits
Underexplored
• Complex regolith
• Common transported cover
• Deep weathering and geochemical depletion
(>100m in places)
Modern regional datasets have the potential to unearth
new targets
The previous drilling was often ineffective
ASX: YRL | YANDALRESOURCES. COM. AU
9
IRONSTONE WELL & BARWIDGEE
A SCIENTIFIC APPROACH NEEDED
Minerals system approach
• Underlying geological process and empirical data
• Involve independent consultants with a track record of
discovery to help develop targets
Rank targets with a focus on
• Potential for large-scale discovery that will “move the dial” or
• Provide material Resource growth to existing deposits
Forensically evaluate past exploration to determine where the real
discovery opportunities are
Acquire modern regional datasets to enhance targeting
• Enhance existing targets and generate new targets
ASX: YRL | YANDALRESOURCES. COM. AU
10
IRONSTONE WELL & BARWIDGEE
CALADAN
Scale Comparison
Giedi Prime Target; Flexurein
interpreted structure/contact
proximal to Flushing Meadows
Deposit with late structures
associated with the deposit
projecting into the position
Corrino Target; Flexure
on the interpreted contact
between gravity Domains
A and B
Previously unrecognised largescale structures
• Large-scale fold structure,
Flushing
Meadows
Deposit
3km wide and >8km long
• Truncated by the Idaho Shear
• Drilling along strike to the
Mt Charlotte
Caladan Target;
large fold truncated
by a northwest
striking structure.
north suggests mafic
dominant stratigraphy
(Dolerite?)
• Broad geological setting is
similar to Kalgoorlie
ASX: YRL | YANDALRESOURCES. COM. AU
Super
Pit
Irulan Target; Basalt-Dolerite
Complex; situated between more
ductile volcanic/sedimentary
Sequence and bracketed by
significant structures
Rosewall
Prospect
11
IRONSTONE WELL & BARWIDGEE
CALADAN
Greenfield Search Space
• Covered by 2-20m of transported cover
Limited Previous Drilling
• Only drilling completed in 1995, 400m by 400m
• Shallow, average depth of 22m
• Coherent, 3km long, Low-level regolith anomaly
• Never followed up
The first phase of AC drilling is underway
ASX: YRL | YANDALRESOURCES. COM. AU
12
IRONSTONE WELL & BARWIDGEE
IRULAN
Giedi Prime Target; Flexurein
interpreted structure/contact
proximal to Flushing Meadows
Deposit with late structures
associated with the deposit
projecting into the position
Corrino Target; Flexure
on the interpreted contact
between gravity Domains
A and B
Excellent setting & poorly tested
• Large dolerite complex
• The 2024 gravity survey expanded the known extent of the
Flushing
Meadows
Deposit
complex
• Bracketed by the regional Barwidgee Shear Zone to the
southwest
• Enveloped by ductile intermediate and sedimentary sequence
• Only 12% of the dolerite complex has been tested with drilling
Geological setting comparable to Jundee
Caladan Target;
large fold truncated
by a northwest
striking structure.
Irulan Target; Basalt-Dolerite
Complex; situated between more
ductile volcanic/sedimentary
Sequence and bracketed by
significant structures
Rosewall
Prospect
ASX: YRL | YANDALRESOURCES. COM. AU
13
IRONSTONE WELL & BARWIDGEE
IRULAN
Dolerites are a regionally significant host rock
• Rosewall Prospect evidence that the Irulan dolerite
complex can host mineralisation
• 9m @ 4.6g/t Au from 12m in GCMBDYC43 (historic drilling)
Including 5m @ 7.6g/t Au from 13m
• 10m @ 2.4 g/t Au from the surface in YRLAC0033
Including 5m @ 4.1g/t Au from the surface
• 7m @ 2.7g/t Au from 14m in YRLRC00469
Including 4m @ 3.9g/t Au from 16m
• 7m @ 2.0g/t Au from 16m in YRLAC0031
Including 3m @ 4.0g/t Au from 20m
• 6m @ 2.0g/t Au from 13m in YRLRC0469
The first phase of AC drilling is underway
ASX: YRL | YANDALRESOURCES. COM. AU
14
IRONSTONE WELL & BARWIDGEE
NEW ENGLAND GRANITE
Northwest structures
interpreted from aerial
magnetics
Scale
• 4.4 x 2km granitic intrusion under 6-20m of cover
• Regolith Au anomaly along the eastern margin
Surface Projection of
shear zone observed in
24YRLEIS0002
• based on broad-spaced RAB and air-core drilling
Excellent geological setting
• Adjacent to a major regional structure
• Cut by late north-west striking structures
• Large and small-scale offsets evident
• Internal complexity
• Common setting for gold deposits (e.g., King of the Hills (VAU), Ramone
Structural target where
the shear interacts with
the intrusive contact
(NST), Montague (BTR), Theia (AAR).
ASX: YRL | YANDALRESOURCES. COM. AU
15
Wes t
Ea s t
IRONSTONE WELL & BARWIDGEE
NEW ENGLAND GRANITE
BOT
Transported
Cover
BOCO
2023 RC test
• Confirmed a clear alteration associated with anomalism and
mineralisation
Co-sponsored diamond drilling in July 2024
• Confirmed geometry of the intrusive margin
• Mineralisation is hosted primarily within the granitoid
A broad zone of anomalous Au
including:
• 2.9m @ 0.5g/t Au from 286.2m
• 3.3m @ 1.1g/t Au from 345.3m
• 3.8m @ 0.4g/t Au from 384.1m
• 0.5m @ 2.1g/t Au from 393.2m
• Several different styles of mineralisation within fresh rock
• Highlighted planar controlling structures that can be projected into
Conceptual
structural target
where shear zones
interact with the
intrusive contact
favourable settings
Follow up RC program just completed
• Follow up RC program completed in early October
• Results due in 3-5 weeks
Basalt
Granitoid
ASX: YRL | YANDALRESOURCES. COM. AU
16
IRONSTONE WELL & BARWIDGEE
TARGETING A GOLD CAMP
Oblique
Exploration Target
90 – 140koz @ 1.0-1.3g/t Au
Ironstone Well Gold Camp Exploration Target*
• 7.0 to 16.0Mt, grading between 1.1 to 1.4 g/t Au, for 280Koz to 880Koz
• Exploration Target does not include the current Inferred Resource
at Flushing Meadows of 268,000oz @ 1.1g/t Au
• Majority oxide, with mineralisation from the surface
Three Target areas within a 5km radius, each with a large footprint
• Aim is to define a significant “gold camp”
• Located approximately 50km from Jundee Mill
* The potential quantity and grade of the Exploration Target is conceptual in nature. There has
been insufficient exploration to estimate a Mineral Resource, and it is uncertain that further
exploration will result in the estimation of a Resource. Key assumptions of the Exploration Target
are appended to this presentation. Refer to Appendix 1 at the back of this presentation for
assumptions underpinning the target ranges. Given the range of estimation uncertainty,
numbers have been rounded to the nearest 10,000oz. Exploration Targets will be tested by
multiple drilling programs over the next 12-18 months.
ASX: YRL | YANDALRESOURCES. COM. AU
Quarter Moon
Exploration Target
100 - 390koz @ 1.4 -1.8g/t Au
Flushing Meadows
MRE 268koz @ 1.1g/t Au
Exploration Target
90 - 350koz @ 1.2 -1.5g/t Au
17
IRONSTONE WELL & BARWIDGEE
NEXT STEPS
New England Granite
• RC follow-up complete - All results expected in 3-5 weeks
Caladan
• AC drilling commenced last week
• Additional heritage surveys to be completed ASAP
Irulan
• AC drilling to commence after Caladan AC is completed
Quarter Moon
• Targeting underway with follow-up RC to be scheduled
Oblique
• Design of follow-up RC drilling to be finalised in November
Emerging gold targets
• Follow up soil sampling program completed and results due in the coming
weeks
• Field reconnaissance over soils and gravity target areas is ongoing
ASX: YRL | YANDALRESOURCES. COM. AU
18
YANDAL RESOURCES HIGHLIGHTS
KEY INVESTMENT HIGHLIGHTS
Three Strategically Located Projects in Tier-1 Belts in WA
Current Resource Inventory of 0.47Moz Au (granted ML’s)
Real Potential For Significant New Discoveries
Focused, Funded, Technically Driven and Determined
Highly Leveraged For Exploration Success
For further info
Contact Chris Oorschot
+61 (0)8 9389 9021
yandal@yandalresources.com.au
Lvl 1, Suite 5, 62 Ord St West Perth, WA, 6005
ASX:YRL
yandalresources.com.au
YANDAL RESOURCES LIMITED
Relevant Previous ASX Announcements
Further details relating to the information provided in this Presentation can be found in the following Yandal Resources Limited ASX announcements:
• Air-core Drilling Commences Across Caladan & Irulan (10/10/2024)
• $2.5m Share Placement to Accelerate Exploration (02/02/2024)
• Quarter Moon Diamond Drilling Results (08/10/2024)
• Oblique Phase Two RC Drilling Results (12/01/2024)
• New England Diamond Drilling Results (24/09/2024)
• Yandal Investor Update (1/11/2023)
• Oblique Diamond Drilling Results (03/09/2024)
• Drilling at Oblique Confirms Large Scale Potential (25/10/2023)
• IWB Soil Results & NEG Diamond Drilling Complete (12/08/2024)
• Ironstone Well-Barwidgee Drilling Update (20/09/2023)
• Large Scale Gold Anomalies Across Emerging Targets (15/07/2024)
• Operations Update (25/08/2023)
• Quarter Moon RC Drilling Results (03/07/2024)
• Resource Update boosts Yandal's gold inventory to 404,000oz
• Oblique RC Drilling Results (18/06/2024)
• Exploration Update – IWB Ground Gravity Survey (11/06/2024)
• Diamond Drilling Commences at Ironstone Well-Barwidgee
(24/05/2024)
(20/09/2022)
• Initial Mineral Resource Estimate of 75,000oz Au at Success
(06/09/2022)
• Initial Resource Estimate of 44,000oz Au at Challenger (22/08/2022)
• Initial RC Results From Oblique (29/04/2024)
• Mineral Resource Update - Flushing Meadows Gold Deposit (04/11/20)
• Ironstone Well – Barwidgee Exploration Update (26/02/2024)
• Replacement Prospectus (12/12/18)
ASX: YRL | YANDALRESOURCES. COM. AU
21
YANDAL RESOURCES LIMITED
MINERAL RESOURCE SUMMARY
Due to the effects of rounding, totals may not represent the sum of the individual components. 1- Reported above 0.5g/t Au lower cut-off
grade; refer to Yandal Resources Ltd ASX announcement dated 4 November 2020 for full details. 2- Reported above 1.0g/t Au lower cut-off grade;
refer to Yandal Resources Ltd ASX announcement dated 22 August 2022 for full details. 3- Reported above 1.0g/t Au lower cut-off grade; refer to
Yandal Resources Ltd ASX announcement dated 6 September 2022 for full details. 4- Reported above 1.0g/t Au lower cut-off grade; refer to Yandal
Resources Ltd ASX announcement dated 20 September 2022 for full details. 5- Reported above 0.5g/t Au lower cut-off grade; refer to Yandal
Resources Ltd ASX announcement dated 3 October 2022 for full details. 6- Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources
Ltd ASX announcement dated 3 October 2022 for full details. 7- Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX
announcement dated 3 October 2022 for full details. 8- All Resources are reported as global estimates, not constrained by optimised pit shells.
ASX: YRL | YANDALRESOURCES. COM. AU
22
IRONSTONE WELL & BARWIDGEE
Appendix 1: Exploration Target
The potential quantity and grade of the exploration target is conceptual in nature and,
therefore, is an approximation. There has been insufficient exploration to estimate a Mineral
Resource, and it is uncertain if further exploration will result in the estimation of a Mineral
Resource. The exploration target is based on the current geological understanding of the
mineralisation geometry, the continuity of mineralisation and the regional geological setting.
This understanding is driven by an extensive drill hole database, aerial magnetic data and
regional mapping, coupled with the current level of understanding of mineralisation across the
four prospects. The Exploration Target has been prepared and reported in accordance with
the 2012 edition of the JORC Code.
Prospect Exploration Target Assumptions
Oblique
The diamond drilling results from the Oblique Prospect have been received, and the
Exploration Target for the Prospect has been revised accordingly. See ASX release 25th
October 2023 for the previous Exploration Target.
The Exploration Target for the Oblique Prospect was derived from AC, RC and diamond drilling.
The current drill spacing across the prospect is insufficient to define a Mineral Resource
Estimate but provides some indication of the volume and grade of potential mineralisation.
Historic AC and RC drilling across Oblique were completed on 100m spaced sections across
700m of the strike. Historic RC drilling tests mineralisation to a maximum vertical extent of 140m.
Yandal Resources has since completed 32 RC holes and five diamond holes across the
prospect. Drilling provides confidence in the geometry of mineralisation with the main OBL-01
structure and has demonstrated mineralisation continuity over 500m of strike. Several parallel
positions have been included in the exploration target. However, the continuity of these
positions has not been well-tested.
The strike length of mineralisation was derived from the extent of >0.5 g/t intercepts within the
interpreted OBL-01 structure across the prospect. The average width of significant intercepts
>0.3 g/t Au was used as an assumption for the width of mineralisation for the lower target. The
average width of significant intercepts >0.5 g/t Au was used for the upper target.
average width of significant intercepts >0.5 g/t Au was used for the upper target. Mineralisation
was then projected down dip by 125m (the approximate depth of base-of-fresh rock). The
volume was converted to a tonnage range using a 2.4 g/cm3 density for both the lower and
upper ranges; the OBL01 structure is dominated by quartz veining and silica alteration. A
limited number of density measurements from the diamond core sample of the OBL-01
structure within transitional material ranges between 2.8 g/cm3 to 3.9g/cm3. The lower range
target grade was derived from the average grade of intercepts, including historic RAB and AC
drilling; the upper range target grade was based on the RC drilling results within oxide and
transitional zones only and used a higher cut of grade of >0.5g/t Au (compared to >0.3g/t Au)
when calculating the average grade of mineralisation. There is evidence for several parallel
mineralised structures across the Oblique Prospect. Only a single structure was applied for the
lower-range target where there is evidence of grade continuity along the strike. Three
additional mineralised structures were included for the upper-range target. The strike length
applied to these structures equals the approximate drill line spacing (50m to 100m).
The Exploration Target for Oblique has been updated (See ASX 25 September 2023) only to
consider mineralisation hosted within oxidised and transitional material, limiting the assumption
to a maximum down-dip extent of 125m.
The Oblique Exploration Target will be subject to exploration drilling within the next three to
eighteen months.
Quarter Moon
The Exploration Target for the Quarter Moon Prospect was derived from a limited amount of RC
and AC/RAB drilling that is insufficient to define a Mineral Resource Estimate but provides some
indication of the volume and grade of potential mineralisation. Historic RC drilling across
Oblique was completed on 100m spaced sections across 700m of strike, in addition to AC/RAB
drilling on a similar spacing. Historic RC drilling tests mineralisation down to a maximum vertical
extent of 140m. Historic RC drilling has been validated by limited YRL RC drilling.
ASX: YRL | YANDALRESOURCES. COM. AU
23
IRONSTONE WELL & BARWIDGEE
Appendix 1: Exploration Target (Continued)
The mineralisation strike was derived from the extent of >1.0 g/t intercepts across the prospect.
The average width of significant intercepts (>0.3 g/t) was used as an assumption for the width
of mineralisation, which was then projected down dip by 250m (approximately 200m vertical).
The volume was converted to a tonnage range by using a density of 2.5 g/cm3 for the lower
range and 2.7 g/cm3 for the upper range, assuming deeper and shallower weathering,
respectively, within a basalt or dolerite host (oxide + transitional material to 100m down dip,
fresh to 200m down dip
The lower range target grade was derived from the average grade of intercepts, including
RAB/AC, which increased by 20%, based on the assumption that the grade improved
moderately with depth. The upper range target grade was based on the same value but
increased by 50%, assuming a significant improvement in grade with depth. There is evidence
for parallel mineralised structures across the Quarter Moon Prospect, which are poorly tested.
For the lower-range target, only a single structure was applied; however, for the upper-range
target, two mineralised structures were applied.
Flushing Meadows
The exploration target for the Flushing Meadows was derived by extending a portion of the
current Mineral Resource Estimate for the deposit down dip an additional 80-120m to an
approximate vertical depth of 200m; a depth consistent with open-cut extraction methods. An
average density of 2.6g/cm3 was applied to the volume, assuming material at depth will be
transitional to fresh, with a density of 2.52 g/cm3 and 2.7 g/cm3 being applied for transitional
and fresh rock in the 2020 MRE, respectively. Flushing Meadows exhibits several parallel
mineralised structures; for the low-range assumption, only a single mineralised volume was
extended beyond the current bounds of the MRE. For the upper range, two additional
mineralised structures were projected down to 200m vertical. The grade for the lower range
was based on the average of mineralised intercepts >0.5g/t Au below a depth greater than
50m from the surface within YRL RC drilling. The upper range grade assumes a moderate 25%
increase in grade within fresh rock at depth.
The above exploration target for Flushing Meadows does not include the Current Mineral
Resource Estimate of 268,000 Oz @ 1.1 g/t Au (see ASX; YRL release dated 4th of November
2020).
New England Granite
The Exploration Target for the New England Granite Prospect was derived from a limited
amount of broad-spaced historic AC/RAB drilling (100m to 400m spaced lines), two historic RC
holes (125m spacing along strike), and the four holes reported in this release. The Exploration
Target range is also informed by the lithological and structural similarities to known gold
deposits within the region, as it is, in part, an early-stage conceptual target. Current drilling is
insufficient to define a Mineral Resource Estimate but provides some indication of the scale
and grade of potential mineralisation. Historic RAB and AC drilling across the NEG Prospect
delineated several regolith anomalies striking between 400m (used for lower range strike
extent) and 500m (used for the upper range strike extent).
RAB and AC drilling intercepts occur within oxidised material and are broad; a lower range of
10m and an upper range of 16m was applied as width to generate volumes projected downdip by 250m (approximately 200m vertical). Typically, it is between 10m and>24m in length
(down holes). A density of 2.5 g/cm3 was applied to the lower range, and a density of 2.6
g/cm3 was applied to the upper range based on a granitic host. A 0.75g/t Au grade was
applied for the lower range based on the average grade of anomalous intercepts >0.3g/t
across the prospect. A nominal grade of 1.2 g/t Au was applied to the upper range; this
assumes the grade improves significantly at depth. The low range value assumes two
mineralised trends are present across the prospect, while the high range values assume there
are three mineralised trends present.
Testing Exploration Targets
The above targets are being actively tested through exploration drilling. Diamond drilling results
from across the Quarter Moon and NEG Prospects are expected in the coming weeks, and
additional drilling across the Flushing Meadows Deposit and the Oblique Prospect in the next 618 months.
ASX: YRL | YANDALRESOURCES. COM. AU
24
Share your feedback
Discover