Caladan Air-Core Drilling Demonstrates Discovery Potential
With 11m @ 1.7g/t Au from 97m to EOH
•
Air-core drilling results from Caladan returned several significant intercepts,
including:
11m*1 @ 1.7 g/t Au from 97m to end-of-hole in 24IWBAC063,
•
including 3m @ 3.5 g/t Au from 102m.
•
The significant intercepts are associated with the >3.0km long historic,
low-level, in-situ Au regolith anomaly CAL-01 (See ASX release 15 July
2024).
•
The Caladan Fold structure is approximately 8km long and 3km wide.
•
Mineralisation in 24IWBAC063 is hosted within an interpreted intermediate
volcaniclastic unit proximal to a mafic contact.
•
The new prospect has been named Arrakis, and follow-up drilling will be
scheduled for the coming weeks with the RC rig already on-site at Siona.
•
Only a single line of air-core drilling was completed across Caladan;
additional heritage surveys are required prior to further drilling.
•
All assay results from the 2024 first-pass air-core drilling program have been
received. Seventeen AC holes were completed for 1,688m of drilling,
testing across 2.3km of the Caladan Fold stratigraphy in October 2024.
•
Drilling programs are underway and upcoming across several target areas
and prospects, including diamond drilling at Siona.
*1 All intercept lengths are reported as down-hole lengths as the true width is unknown.
For further information or to ask questions in relation to this announcement, please visit
our Investor Hub at https://investorhub.yandalresources.com.au/link/WPGOZP.
Contact Us
A: Level 1 Unit 5/62 Ord Street,
West Perth WA 6005
T: +61 (0)8 9389 9021
E: yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL
Board and Management
Chris Oorschot
Managing Director/CEO
Greg Evans
Non-Exec Chair
Katina Law
Non-Exec Director
Tim Kennedy
Non-Exec Director
Greg Fitzgerald
Company Secretary
Commenting on the new results, Yandal Resources’ Managing Director, Mr. Chris Oorschot,
said: “This is an extremely satisfying result for Yandal and is the product of excellent work
completed by the Exploration Team. The Caladan target area was only a concept six
months ago. The re-capture and analysis of historic data identified a 3km long low-level
geochemical anomaly under transported cover associated with the Caladan Fold axis. To
have an intercept of this tenor after completing one line of first-pass air-core drilling within
this large-scale geochemical anomaly is highly encouraging and may represent the
emergence of a new greenfield discovery.
We are very excited by these initial results and will look to complete follow-up drilling on
the cleared air-core line as soon as possible, and more broadly, preparations are
underway for a larger air-core program across the Caladan target area.”
Yandal Resources Ltd (ASX: YRL, “Yandal Resources” or the “Company”) is pleased to advise that
it has received all assay results from the first line of air-core drilling across the large-scale Caladan
target area. Seventeen air-core (AC) holes were drilled along a single line that transects the core
of the Caladan Fold for a total of 2,688m (See Figure 2).
The Caladan target area (within E 53/1843, E 53/2304, E 53/2192 and E 53/1882) is part of the
broader Ironstone Well–Barwidgee (IWB) Gold Project (see Figure 4), located approximately
60km north of Northern Star’s (ASX: NST) Bronzewing mining complex, 60km south of the Jundee
mining complex (ASX: NST), and 18km north of the emerging Siona discovery, within the Yandal
Greenstone Belt.
The Caladan target area is an early-stage, large-scale exploration search space identified
following the completion of a ground gravity survey in early 2024 (see ASX releases dated 11 June
2024 and 15 July 2024). In late 2024, air-core drilling was completed along one line across the
core of the Caladan target area, testing the core of the CAL-01 anomaly. The AC results represent
the first effective drilling (testing the full regolith sequence through transported cover) across the
Caladan target area. Holes are variably spaced between 200m to 50m along the single drill line.
The significant results were intercepted close to the core of the > 3.0km long Cal-01 geochemical
anomaly (See Figures 1 & 2). Follow-up drilling on the existing AC line will be scheduled in the
coming weeks, and the Company is scheduling a heritage survey to clear additional lines for a
large-scale AC drilling program that will explore along strike to both the north and south.
yandalresources.com.au | ASX:YRL
2
Caladan Air-Core Results
All intercept lengths are reported as down-hole lengths as the true width is unknown.
The 2024 AC drilling program across the Caladan target area included seventeen holes for 1,688m
of drilling, variably spaced (80m to 200m) along a single northeast-trending (towards 045°) drilling
line. Results from the 2024 AC drilling program across the Caladan fold returned a cluster of
significant intercepts, all within or proximal to the in-situ regolith Au anomaly CAL-01 (See Figures
1 and 2), including:
o
11m @ 1.7 g/t Au from 97m to end-of-hole in 24IWBAC063, including
3m @ 3.5 g/t Au from 102m
o
2m @ 1.2 g/t Au from 74m in 24IWBAC013
o
4m @ 0.5 g/t Au from 88m in 24IWBAC016
o
3m @ 0.2 g/t Au from 81m in 24IWBAC015
The significant intercept in 24IWBAC0063 is located on the northeast margin of the CAL-01 regolith
anomaly. This result, combined with the adjacent intercepts, demonstrates a potential correlation
between the shallow CAL-01 regolith Au anomaly and a primary mineralisation source. This new
prospect has been named Arrakis.
The 11m @ 1.7g/t intercept within 24IWBAC063 is hosted within an interpreted sheared intermediate
(andesite) volcaniclastic unit, displaying strong sericite alteration, up to 3% veining and 5-10% fine
disseminated sulphides as a combination of both pyrite and arsenopyrite (see Figure 3).
The Arrakis Prospect is overlain by 10-14m of transported cover.
yandalresources.com.au | ASX:YRL
3
Figure 1: Cross section showing air-core results from 24IWBAC015, 24IWBAC016 and
24IWBAC063 with a simple preliminary interpretation of geology. The section location is shown
in Figure 2. The section shows all drilling +/-25m away from the section plane
yandalresources.com.au | ASX:YRL
4
Figure 2: A collar plan over the Caladan target area, showing simplified bedrock geology
interpretation across the Caladan and northern Irulan target areas within the IWB Gold Project.
The collars of the 2024 air-core drilling and the historic 1995 RAB drilling are plotted and
thematically coloured by max Au (g/t Au). In-situ regolith Au (ppb) anomalies derived from
the 1995 RAB drilling are contoured on the plan. The blue outline represents the YRL tenements.
The underlying processed ground gravity image is derived from Bouguer anomaly 0.5 vertical
derivative with north-west shade and a non-linear colour scale image.
yandalresources.com.au | ASX:YRL
5
20mm
Figure 3: Air-core chips/stubs from 107-108m (bottom-of-hole) of 24IWBAC063 displaying
foliated, medium-grained, intermediate (andesitic) volcaniclastic lithology, with strong sericite
alteration, up to 3% veining and 5-10% fine disseminated sulphides as a combination of both
pyrite and arsenopyrite.
yandalresources.com.au | ASX:YRL
6
Caladan Target Area
The Caladan target area presents a large-scale northwest plunging (interpreted) fold, truncated
by the Idaho Shear, interpreted as a second-order structure linking the Ockerburry Shear Zone to
the east and the Barwidgee Shear Zone to the west (see Figure 4). The only systematic drilling
across the fold structure was completed in 1995 (see ASX 15 July 2024), where shallow vertical
RAB holes on a 400m by 400m spacing were completed. The drilling was designed to penetrate
through shallow transported cover and sample in-situ upper saprolite clays. A review of this drilling
yielded several low-level saprolite anomalies, the largest of which (the 3km long CAL-01
anomaly) is situated in the core of the Caladan Fold (see Figure 2 above).
The Caladan Fold structure is 3km wide, over 8km long, and lies under 2m to 20m of loose to
partially cemented transported cover (the average depth of transported cover is 8m). The broad
structural setting is similar to the Kalgoorlie district, where the Boulder-Lefroy Fault truncates the
folded mafic stratigraphy of the Boomerang anticline. The under-explored nature of the Caladan
Fold, combined with several low-level regolith anomalies, presents the Caladan target area as a
high-priority early-stage exploration target area within the Company’s project portfolio.
In addition to the significant intercept, the air-core drilling has also confirmed gravity highs to
coincide with fractionated dolerites, separated by a sequence dominated by variably altered
intermediate (andesite) volcaniclastics. Drilling results combined with observed geology have
reaffirmed the Company’s prioritisation of the Caladan target area within the 2025 exploration
strategy.
Next Steps
Follow-up drilling will be scheduled and completed across the Arrakis Prospect in the coming
weeks. Follow-up drilling will be limited to the existing single air-core line until further heritage
surveys can be completed to clear additional drill lines across the 8km long, 3km wide Caladan
Fold structure. This will include drill lines north and south of the Arrakis intercepts.
yandalresources.com.au | ASX:YRL
7
Figure 4: A simplified bedrock geology interpretation across the IWB Gold Project with the
main features of the preliminary ground gravity interpretation, including conceptual target
areas. The red oval marks the position of the Flushing Meadows Gold Deposit, and the blue
outline represents the YRL tenement outline. The underlying processed ground gravity image
is derived from Bouguer anomaly 0.5 vertical derivative with north-west shade and a non-linear
colour scale image.
yandalresources.com.au | ASX:YRL
8
Looking Ahead
The Company enters CY 2025 with a strong cash position and a very active March Quarter
scheduled. Notable near-term activities and news flow include;
1.
2024 Air-core drilling results from across the Irulan target area are anticipated before
the end of January;
2.
2025 RC Drilling has commenced across the New England Granite, prioritising structural
targets proximal to the Siona discovery, with first results anticipated in February;
3.
Follow-up RC drilling to be completed across the Arrakis Prospect in January;
4.
Diamond drilling at Siona is scheduled to commence in January.
Authorised by the board of Yandal Resources
For further information, please contact:
Chris Oorschot
Managing Director
Yandal Resources Limited
yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL
Greg Fitzgerald
Company Secretary
+61 8 9389 9021
yandal@yandalresources.com.au
9
Relevant Previous ASX Announcements
o
Air-core Drilling Commences Across Caladan and Irulan, 10 October 2024
o
Oblique Diamond Drilling Results, 3 September 2024
o
IWB Soil Results and NEG Diamond Drilling Complete, 12 August 2024
o
Large-scale Gold Anomalies Across Emerging Targets, 15 July 2024
o
Gold Coast Investment Showcase Presentation, 20 June 2024
o
Exploration Update – IWB Ground Gravity Survey, 11 June 2024
yandalresources.com.au | ASX:YRL
10
About Yandal Resources Limited
Yandal Resources has a portfolio of advanced gold exploration projects in the highly prospective Yandal
and Norseman-Wiluna Greenstone Belts of Western Australia.
Yandal Resources’ gold project locations.
Table 1 – Yandal Resources Ltd - Mineral Resource Summary
Indicated
Inferred
Deposit
Tonnes Grade
Au
Tonnes
Grade
Au
(‘000s)
(g/t)
(oz)
(‘000)
(g/t)
(oz)
Ironstone Well
Flushing Meadows1
2,141
1.3
91,000
5,245
1.1
177,000
Mt McClure
Challenger2
718
1.9
44,000
3
Success
1,255
1.9
75,000
Parmelia4
252
2.1
17,000
5
HMS Sulphur
1010
1.2
39,000
6
Gilmore
134
1.7
7,200
Sub-total - MMC
3,369
1.7
182,200
Gordons
Gordons Dam7
365
1.7
20,000
2,141
Grand-total8
8,979
1.3
379,200
1.3
91,000
Total
Tonnes
(000’s)
Grade
(g/t)
Au
(Oz)
7,386
1.1
268,000
718
1.9
44,000
1,255
1.9
75,000
252
2.1
17,000
1010
1.2
39,000
134
3,369
1.7
1.7
7,200
182,200
365
1.7
20,000
11,120
1.4
470,200
Due to the effects of rounding, totals may not represent the sum of the individual components.
1. Reported above 0.5g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 4 November 2020 for full
details. 2. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 22 August 2022 for full
details 3. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 6 September 2022 for
full details.4. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 20 September 2022
for full details 5. Reported above 0.5g/t Au lower cut-off grade within this announcement 6. Reported above 1.0g/t Au lower cut-off
grade within this announcement 7. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement
dated 6 April 2023 for full details 8. All Resources are reported as global estimates, not constrained by optimised pit shells.
yandalresources.com.au | ASX:YRL
11
Competent Person Statement
The information in this document related to Exploration Targets and Exploration Results, geology and data
compilation is based on information reviewed or compiled by Mr Christopher Oorschot, a Competent
Person who is a Member of The Australasian Institute Geoscientists. Mr Oorschot is the Managing Director
of the Company, is a full-time employee and holds shares and options in the Company. Mr Oorschot has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Oorschot consents to the inclusion in this announcement of the matters based on this information in the
form and context in which it appears.
The information in this announcement that relates to the Flushing Meadows, Mt McClure and Gordons Dam
Mineral Resource Estimates is based on information compiled and generated by Andrew Bewsher, an
employee of BM Geological Services Pty Ltd (“BMGS”). Both Andrew Bewsher and BMGS hold shares in
the company. BMGS consents to the inclusion, form and context of the relevant information herein as
derived from the original resource reports. Mr Bewsher has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration and to the activity which is being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the JORC ‘Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves’.
YRL confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement. The company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
Forward Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include, but
are not limited to, statements concerning Yandal Resources Limited’s (Yandal’s) current expectations,
estimates and projections about the industry in which Yandal operates, and beliefs and assumptions
regarding Yandal’s future performance. When used in this document, words such as “anticipate”, “could”,
“plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are
forward-looking statements. Although Yandal believes that its expectations reflected in these forwardlooking statements are reasonable, such statements are subject to known and unknown risks, uncertainties
and other factors, some of which are beyond the control of Yandal and no assurance can be given that
actual results will be consistent with these forward-looking statements. Drilling results presented indicate
geological potential for mineralisation but there can be no certainty that these results will eventually form
part of a Mineral Resource Estimate.
yandalresources.com.au | ASX:YRL
12
Table 2 – Caladan air-core collar location summary for this release.
Prospect
/ Target
Hole ID
Hole
type
East
Caladan
24IWBAC007
AC
Caladan
24IWBAC008
AC
Caladan
24IWBAC009
Caladan
24IWBAC010
Caladan
Caladan
North
(m)
RL
Azimuth
Dip
Total
Depth
(m)
(mAHD)
(degrees)
(degrees)
285896
7026635
528.2
223
-60
70
286033
7026775
527.9
223
-60
58
AC
286172
7026928
525.0
223
-60
72
AC
286308
7027075
521.3
223
-60
115
24IWBAC011
AC
286409
7027187
524.7
223
-60
82
24IWBAC012
AC
286516
7027291
524.4
223
-60
97
Caladan
24IWBAC013
AC
286570
7027347
526.1
223
-60
147
Caladan
24IWBAC014
AC
286638
7027411
523.2
223
-60
115
Caladan
24IWBAC015
AC
286720
7027506
525.1
223
-60
94
Caladan
24IWBAC016
AC
286851
7027644
525.3
223
-60
113
Caladan
24IWBAC017
AC
286977
7027774
525.1
220
-60
109
Caladan
24IWBAC018
AC
287115
7027927
522.5
223
-60
123
Caladan
24IWBAC019
AC
287258
7028074
527.8
223
-60
93
Caladan
24IWBAC020
AC
287397
7028214
522.5
219
-60
73
Caladan
24IWBAC062
AC
286679
7027453
522.1
223
-60
108
Caladan
24IWBAC063
AC
286818
7027602
526.4
223
-60
108
Caladan
24IWBAC064
AC
286925
7027716
525.1
223
-60
111
(m)
Table 3 – Caladan Target Area - Summary of significant air-core drilling assay results >0.1g/t Au with no
more than 2m of continuous internal waste included unless otherwise stated. All intercept lengths are
reported as down-hole lengths.
Hole
ID
Sample
type /
Sub
From
(m)
To
(m)
Interval
(m)
Au
(g/t)
Comment
24IWBAC007
1m Sample
NSA
24IWBAC008
1m Sample
NSA
24IWBAC009
1m Sample
NSA
24IWBAC010
1m Sample
NSA
24IWBAC011
1m Sample
NSA
24IWBAC012
1m Sample
NSA
24IWBAC013
1m Sample
74
76
2
1.2
Transitional weathering
24IWBAC013
1m Sample
90
91
1
0.2
Transitional weathering
24IWBAC013
1m Sample
126
130
4
0.1
Transitional weathering
24IWBAC014
1m Sample
87
88
1
0.2
Transitional weathering
24IWBAC015
1m Sample
39
40
1
0.1
Completely weathered
24IWBAC015
1m Sample
81
84
3
0.2
Transitional weathering
24IWBAC016
1m Sample
88
92
4
0.5
Transitional weathering
24IWBAC016
1m Sample
94
95
1
0.1
Transitional weathering
24IWBAC017
1m Sample
10
11
1
0.1
Transported cover
24IWBAC018
1m Sample
8
9
1
0.1
Transported cover
24IWBAC018
1m Sample
40
41
1
0.1
Transitional weathering
24IWBAC018
1m Sample
82
83
1
0.2
Transitional weathering
24IWBAC019
1m Sample
17
18
1
0.1
Completely weathered
24IWBAC020
1m Sample
NSA
yandalresources.com.au | ASX:YRL
13
From
(m)
24IWBAC062
Sample
type /
Sub
1m Sample
NSA
24IWBAC063
1m Sample
24IWBAC063
Hole
ID
To
(m)
Interval
(m)
Au
(g/t)
Comment
80
81
1
0.2
Transitional weathering
1m Sample
92
93
1
0.6
Transitional weathering
24IWBAC063
1m Sample
97
108
11
1.7
24IWBAC063
Including
102
105
3
3.5
Transitional - mineralisation to the bottom
of the hole
24IWBAC064
1m Sample
0
3
3
0.2
Transported cover
24IWBAC064
1m Sample
82
83
1
0.2
Transitional weathering
24IWBAC064
1m Sample
93
95
2
0.2
Transitional weathering
NSA - no significant assays.
yandalresources.com.au | ASX:YRL
14
Appendix 1 – Ironstone Well-Barwidgee Gold Project, Caladan Air-Core Drilling
JORC Code (2012) Table 1, Sections 1 and 2
Mr Christopher Oorschot, Managing Director of Yandal Resources, compiled the information in Section 1 and Section 2 of the following JORC Table 1 and
is the Competent Person for those sections. The following Table and Sections are provided to ensure compliance with the JORC Code (2012 edition)
requirements for the reporting of Exploration Results.
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
•
•
•
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
•
Aspects of the determination of mineralisation that are
Material to the Public Report. In cases where ‘industry
standard’ work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was used to obtain
1 m samples from which 3 kg was pulverised to produce a
•
ASX Announcement 15 January 2025
Yandal Resources has completed a single line of Air-Core (AC) drilling across the core of the
Caladan Fold structure, The drilling involved an 85mm Air-core blade reaming down to an
average down-hole depth of 98m. Hole depths vary between 58m to 147m. Holes were drilled
at an angle of -60° to the southwest. Groundwater was encountered during the process of
drilling; however, water volumes were well managed, with only one hole being stopped due
to excess groundwater.
Yandal Resources (YRL) Air-core drilling samples were collected via a rig-mounted hydraulically
operated cyclone and splitter. One split was collected for each meter and then sent to a lab
for further analysis.
Historic RAB drilling completed by Eagle Mining and Hunter Resources was detailed in the ASX
release dated 15 July 2024, the original open-file reports are referenced below:
o For historic RAB drilling completed by Eagle Mining in 1995, derived from WAMEX
Report A047408, samples were taken over discrete lithological changes of
varying lengths. Holes were terminated once a recognisable saprolitic horizon
was intercepted.
o For historic RAB drilling completed by Hunter Resources in 1995, derived from
WAMEX Report A047408, samples were collected as 4m composites from the
transported/residual interface to the bottom of the hole.
For YRL Air-core drilling, the cone splitter is regularly cleaned and inspected. The 1m bulk
samples are laid out on the ground in drill order. These samples are regularly inspected for
contamination, and the volume of the bulk sample is monitored. The cyclone was routinely
cleaned to ensure no material buildup.
AC drilling was used to obtain 1m samples from which a portion, between 1-3kg in weight, was
dispatched to one of the two following labs:
o Aurum Laboratories Pty Ltd: samples were crushed and pulverised to produce a
50g charge for fire assay with an AAS (atomic absorption spectroscopy) finish for
gold determination with a 0.01ppm detection limit.
o Intertek Minerals: samples were crushed and pulverised to produce a 50g charge
Page 15
Criteria
JORC Code explanation
Commentary
for lead collection fire assay with OES (Optical Emission Spectroscopy) finish for
gold determination with a 0.005ppm detection limit.
30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed information.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (e.g. core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type, whether
core is oriented and if so, by what method, etc).
•
For YRL Air-core drilling, an 85mm Air-core blade was used.
Drill sample
recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.
•
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
•
For YRL holes, air-core drilling recoveries are visually assessed by the supervising geologist, and
any low-volume or oversized sample piles were recorded, along with any damp or wet
samples. Drill depths are routinely verified at the completion of each drill rod (every 6m).
Within the limited drilling completed, there appears to be no correlation between sample
recovery and sample grade.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Logging
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
ASX Announcement 15 January 2025
•
•
For YRL drilling, all air-core holes have been logged in full by a qualified and experienced
geologist. Logging data was captured in MX Deposit data capture and database software.
All drilled intervals were logged for colour, weathering, lithology, deformation, veining and
sulphide species. End-of-hole samples were sieved and retained in labelled and annotated
chip trays. Chip trays are transported to Perth for long-term storage and are available for
review.
In addition to geological logging, the magnetic susceptibility of each interval is measured using
a KT-10 magnetic susceptibility metre, with a sensitivity of 1x10-6 SI Units. Magnetic susceptibility
readings are quantitative in nature.
Page 16
Criteria
JORC Code explanation
Commentary
Sub-sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter, half or
all core taken.
•
If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
•
•
•
YRL Air-core drilling utilised a rig-mounted cone splitter installed directly below and in line with
the rig-mounted cyclone. One 1-3kg sub-samples was collected into calico bags labelled with
a unique alpha-numeric ID. Most samples collected were dry; if samples were damp or wet,
this was noted in the sample records.
Field duplicates were collected at an initial rate of 1 duplicate for every 50 samples collected.
Standards and blanks were routinely inserted into the sample sequence
For labs used by YRL, internal lab quality control measures include lab duplicates and the
insertion of lab standards and blanks
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected, including
for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation,
etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
•
•
•
•
ASX Announcement 15 January 2025
For YRL air-core drilling, samples were assayed at the following labs using the following
methods:
o Aurum Laboratories in Beckenham, Western Australia, assayed using a 50g fire
assay with AAS (atomic absorption spectroscopy) finish for gold analysis with a
0.01ppm detection limit.
o Intertek Minerals in Maddington, Western Australia, assayed using a 50g charge
for lead collection fire assay with OES (Optical Emission Spectroscopy) finish for
gold determination with a 0.005ppm detection limit.
o Both are considered a total digest and appropriate for the targeted style of
mineralisation.
Magnetic susceptibility measurements were taken every meter using a KT-10 V2 instrument with
a sensitivity of 1x10-6 SI Units.
YRL QAQC field protocols include the insertion of commercially prepared certified reference
material (CRM) and blank material at a rate of approximately 1 CRM/blank for every 20
samples collected. CRMs used are un-identifiable by the lab when received. QAQC
performance is monitored upon receipt of each batch of results and re-assessed once all
samples for a program are received.
Laboratory QA/QC protocols involve inserting internal lab standards using CRMs, blanks,
Page 17
Criteria
Verification
of sampling
and assaying
JORC Code explanation
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Commentary
•
•
•
•
Discuss any adjustment to assay data.
Location of
data points
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
Specification of the grid system used.
•
•
•
•
Quality and adequacy of topographic control.
Data spacing
and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade conti
Share your feedback