HRZ: Acquisition of Gordons Dam Project near Black Swan
Released
Released
Announcement PDF
ASX: HRZ
ASX ANNOUNCEMENT
5 AUGUST 2025
ACQUISITION OF PROJECTS NEAR BLACK SWAN INCLUDING
GORDONS DAM PROJECT
Horizon Minerals Limited (ASX: HRZ) (“Horizon” or “the Company”) is pleased to announce
commencement of regional consolidation of assets (“Acquisition”) near the 100% owned Black Swan
processing facility via executing a Binding Tenement Sale Agreement (“TSA”) with Yandal
Resources Limited (ASX: YRL) (“Yandal”).
HIGHLIGHTS
•
Binding TSA executed with Yandal for the acquisition of 100% interest in the Gordons, Mt
Jewell, Malone and Mulgarrie gold projects in the Western Australian goldfields
•
Projects comprise 34 granted mining, prospecting, exploration and miscellaneous licences
covering an area of approximately 77 km2 strategically located in close proximity to the Black
Swan processing plant:
•
o
Gordons Dam project, 10km west-south-west of Black Swan with an established
mineral resource of 365 kt grading 1.7 g/t Au for 20 koz with mineralisation open at
depth and along strike and on a granted Mining Lease 1
o
Multiple drilling targets identified including the advanced Star of Gordon and Malone
prospects
Projects acquired for total consideration of A$2.810m on the following terms:
o
$0.2m refundable cash deposit on execution of the TSA (paid)
o
$1.0m cash from existing reserves (Cash Payment) on completion, and
o
$1.610m in fully paid ordinary Horizon shares (Consideration Shares) on completion
at an issue price equal to a 10% discount to the 15 trading day volume weighted
average price up to and including the day immediately prior to the date of execution
of the TSA. The issued shares will not be subject to any escrow restrictions. The
share consideration may also be paid as cash, at Horizon’s election at the time of
completion.
Commenting on the Acquisition, Managing Director and CEO Mr Grant Haywood said: 2
“We are pleased to acquire these projects in close proximity to our processing infrastructure. Our
key focus is completing study work with the aim of generating a five-year life of mine plan processing
through our Black Swan processing plant.”
“In addition to the resource at Gordons Dam, these assets complement our current large strategic
land holdings in the WA goldfields. We see great potential in this area for further resource growth
along with enormous exploration upside.”
1
See Competent Persons Statement on page 16 and JORC Tables on page 19.
See Forward Looking and Cautionary Statements on Page 17.
2
Level 2, 16 Ord Street
West Perth WA 6005
PO Box 1064
West Perth WA 6872
T: +61 8 9386 9534
E: info@horizonminerals.com.au
horizonminerals.com.au
ACN 007 761 186
ABN 88 007 761 186
ASX ANNOUNCEMENT
Overview
Horizon Minerals Limited (ASX: HRZ) (“Horizon” or the “Company”) is pleased to announce it has
executed a binding TSA with Yandal for 100% interest in tenure located proximal to our Black Swan
processing facility, located approximately 40 km to the northwest of Kalgoorlie in the heart of the
Western Australian Goldfields (Figures 1 and 2).
Figure 1: Gordons Project location in context to Horizon Minerals tenement holdings, regional
geology and surrounding infrastructure
The Company is focussed on becoming a standalone gold producer by refurbishing and repurposing
the Black Swan processing plant into a gold plant with a nominal throughput of 1.5Mtpa. Horizon is
undertaking a Pre-Feasibility Study (PFS) to develop a five-year life of mine plan to feed the plant.
This acquisition is very close to Black Swan and complements the Company’s existing extensive
tenement portfolio.
Project Summary
The Gordons Project area comprises of 34 granted mining, prospecting and exploration licences
covering a mostly contiguous area of approximately 77 km as well as four pending mining and
miscellaneous licenses (Figures 1 and 2). A complete list of the tenements in Appendix E Table 2.
The Project is located within a prospective Archean Greenstone sequence of lithologies which also
Page 2 of 69
ASX ANNOUNCEMENT
hosts the Mulgarrie and Gordon Sirdar Gold Mines (Figure 2). Several gold prospects and targets at
various stages of exploration and development as well as the Gordons Dam Deposit comprise the
Gordons Project (Figure 3). Horizon Minerals is of the opinion that there is potential to identify
extensions to mineralisation across numerous gold targets and prospects.
Project History
No economic scale historical mining activities within the Gordons Project exist however there is
evidence of mining activities such as shafts dating back to 1901. Prior to the Gordons Project and
underlying area being acquired by Yandal Resources in 2018, extensive exploration activities
occurred by multiple companies and parties (refer Appendix B JORC Table 1, Project Gordons Dam
– Exploration, Section 2).
Historical drillholes (drilling activities undertaken prior 2018 and Yandal Resources ownership) as
well as drilling conducted by Yandal Resources are identified in figures 2 and 3 as well as Table 1
(Appendix D) and Figure 1 (Appendix E) of this announcement. Drill collars represented as maximum
downhole assays (ppm). The historical drillhole data was compiled originally by Yandal Resources
from open file WAMEX reports, then reviewed and validated by Horizon Minerals. WAMEX open file
reports that include historical drillhole data include A037661, A044420, A048153, A051519,
A057836, A059314, A60036, A60913, A064353 and A06613.
Hole location and drilling type for all previous drilling within the entire project area are highlighted in
Figure 1 of Appendix E in this Announcement. Numerous significant intercepts from drilling activities
undertaken by Yandal Resources have been identified within the database with better intercepts
identified in Table 1 (Appendix E). Significant intercepts determined on samples returning a gold
assay value >1.0 ppm Au over an interval of greater than 2m without the inclusion of internal material
of < 1.0 ppm Au.
Project Geology
The Gordon’s Project contains tenements covering an area within the Boorara Domain of the
Kalgoorlie Terrane, part of the larger Norseman-Wiluna Archean Greenstone Belt bounded by the
Bardoc Shear Zone to the west and the Mount Monger Fault to the east. The geology of the Project
is dominated by a sequence of mafic, ultramafic and felsic rocks with numerous porphyry intrusions
thrust against the large granite body of the Scotia-Kanowna Granite to the west.
The major structural feature of the Project is the Gordon Sirdar Shear Zone (GSSZ) that extends
throughout the entire area and is interpreted as being coincident with a number of gold prospects as
well as the gold deposits of Gordon Sirdar and Mulgarrie. The GSSZ and related splays is interpreted
to be associated with the steepening of the eastern margin of the Scotia-Kanowna Granite and is a
key feature to investigate for further gold prospectivity.
Page 3 of 69
ASX ANNOUNCEMENT
Figure 2: Gordons Project tenements, prospects and regional geology. Historical and Yandal
Resources drilling represented as maximum downhole assays (ppm). Insert map shown as Figure 3.
Page 4 of 69
ASX ANNOUNCEMENT
Figure 3: Zoomed in insert map from Figure 2. Gordons Dam MRE, and other gold prospects.
Historical and Yandal Resources drilling represented as maximum downhole assays (ppm).
Page 5 of 69
ASX ANNOUNCEMENT
Mineral Resource Estimate (MRE)
Located within the Gordons Dam project area is the Gordons Dam deposit which has a MRE of
365,000t @ 1.7g/t Au for 20,000oz (> 1g/t Au lower cut-off grade) (Figure 3).
The Gordon’s Dam deposit includes mineralisation hosted within laterite, transported cover
sediments (paleochannel material) and weathered and fresh bedrock. Primary mineralisation occurs
in quartz veins that occur at the margins of pillow basalts intruded by later microgranite/porphyrys.
Mineralisation within the MRE extends from approximately 30m below surface to a current maximum
depth of 120m. Zones of mineralisation are associated with a laterally extensive paleochannel at the
base of oxidation and at depth into the fresh bedrock with an overall mineralised north-west trend of
approximately 320m in strike length. Further detailed information on the Gordons Dam MRE is
presented in the Technical Overview section of this announcement.
Acquisition Key Terms
The Company has executed a binding Tenement Sale Agreement (“TSA”) to acquire the project areas
from Yandal Resources Limited, for a total consideration of A$2.810m.
The A$0.2m refundable cash deposit already been paid, with deferred consideration of A$1.0m in
cash and $1.610m in Horizon shares payable at settlement with the shares to be issued at an issue
price equal to a 10% discount to the 15 trading day volume weighted average price up to and including
the day immediately prior to the date of execution of the TSA
The consideration will be funded from existing cash reserves and placement capacity.
Conditions precedent to settlement include:
•
Regulatory approvals typical of a transaction of this nature
•
Consent of the Minister required under the Mining Act for the transfer of the tenements having
been obtained
•
The execution of any third-party agreements required
•
The provision of all mining information
Settlement of the transaction is expected in the current September quarter 2025.
Page 6 of 69
ASX ANNOUNCEMENT
Appendix 1 – Material Information Summary (Listing Rule 5.8.1)
Technical Overview – information required by Listing Rule 5.8.1
Pursuant to ASX listing rule 5.8.1, and in addition to the information contained in the attached JORC
Code tables, the Company provides the following details in respect of the Gordons Dam MRE.
Material Information Summary – Mineral Resources
Location
The Gordons Project is located on Mt Vetters pastoral station approximately 45km northeast of
Kalgoorlie- Boulder. The project is 15km north of the Kanowna Bell Gold Mine and surrounds the
Gordon-Sirdar Gold Mine.
Access is via Yarri Road to Kanowna, then approximately 5 kms north on the Mulgarrie-Kanowna
Gazetted Road. Numerous prospector and historical mine tracks cross the area provide excellent
access to most areas of the project.
Regional Geology
The Gordons project lies within the Boorara domain of the Kalgoorlie Terrane, part of the broader
Norseman-Wiluna Archaean greenstone belt. The Norseman-Wiluna greenstone belt is
approximately 600 km long and is characterised by very thick, possibly rift-controlled accumulations
of ultramafic, mafic and felsic volcanics, intrusive and sedimentary rocks. The Kalgoorlie Terrane of
the south-eastern Goldfields has since been formally subdivided into numerous tectono-stratigraphic
domains. These include four major domains, Coolgardie, Ora Banda, Kambalda and the Boorara
Domain.
The Boorara domain, bounded by the Bardoc Shear Zone to the west and the Mount Monger Fault
to the east, is interpreted as the easternmost portion of the Kalgoorlie Terrane. This terrane is
regarded as an originally coherent volcano-sedimentary basin formed between 2.72 Ga and 2.68 Ga
and is characterised by a regional lithostratigraphy; a lower tholeiitic basalt, komatiite, upper highMg basalt and a composite felsic unit. In the Boorara domain, the Gordon project area contains a
lower pillowed basalt unit overlain by large homogenous dacite and komatiite intercalations, the
uppermost komatiite unit is overlain by an extrusive basaltic sequence. These units generally trend
north- east, and prominent shear zones strike to the north-west. The Gordons tenements lie on the
eastern limb of the Scotia Kanowna Dome.
Deposit Geology and Mineralisation
Primary mineralisation at the Gordons Dam deposit is hosted within pillow basalts (observed from
drill core) and a discordant felsic intrusive that dips moderately to the north-east. Gold mineralisation
transects the felsic intrusive. The intrusion has a probable rheological control on mineralisation with
gold being deposited preferentially where the mineralising structure(s) interact with the intrusion. The
dominant structural fabric is controlled by a series of discontinuous faults and weak shear zones with
an overall trend to the north-north-west. A second structural feature in the area is a “kink” zone
Page 7 of 69
ASX ANNOUNCEMENT
defined by a 400m wide zone nearer to north-trending, very open Z-style folding in the stratigraphy.
Gordons Dam is hosted within the interplay of this kink zone and the dominant north-north-west
trend.
There are multiple generations of veining at Gordons Dam, with both quartz dominant, quartzcarbonate +/- sulphides and carbonate plus sulphide veins observed in chips and diamond core.
Current observations suggest that only the quartz dominant veining is associated with gold
mineralisation. These veins are quartz rich (grey and cloudy), with minor carbonate and pyrite as
thin selvages and rarer disseminations. Chalcopyrite has been noted in polished thin sections.
Narrow alteration halos develop around the veining dominated by sericite, chlorite, silica and minor
pyrite.
Mineral Resource Statement Overview
The Gordons Dam mineral resource was completed by Yandal Resources. Horizon Minerals has
conducted a detailed review and audit of the Mineral Resource Estimate and confirms the veracity
of the MRE.
BM Geological Services (BMGS) were engaged by Yandal Resources to complete a Mineral
Resource Estimate (MRE) for the Gordons Dam deposit situated 45 kilometres northeast of
Kalgoorlie-Boulder, during November 2022.
The MRE is based on recent and historical reverse circulation (RC) and diamond (DH) drill hole data.
The MRE utilised four diamond (DDH) and 91 Reverse Circulation (RC) drill holes to create3dimensional (3D) mineralisation wireframes and weathering surfaces. The interpretation was then
used to flag drilling data to be used in the estimation of gold grades into a block model constructed
using the Geovia Surpac software package (Surpac). The mineralisation interpretation was
completed on 20 metre spaced drill sections, using a nominal 0.5 g/t Au lower cut-off.
The MRE was classified as Inferred based on drill density, geological understanding, grade continuity
and economic parameters of Open Pit mining. The MRE contains 365,000 tonnes at 1.7 g/t Au for
20,000 ounces of gold using a 1.0 g/t gold lower reporting cut-off (Table 1). Results were originally
announced by Yandal Resources in April 2023. 3
Table 1 - Gordons Dam Mineral Resource Estimate (1.0g/t Au Lower Grade Cut-off) above 136m vertical depth.
Category
Tonnes
Grade (g/t Au)
Total Ounces
Inferred
365,000
1.7
20,000
Note: Due to the effects of rounding, totals may not represent the sum of all individual components
Drilling, Sampling and QA/QC
The drilling database used to compile the MRE comprised 95 drill holes. A summary of hole types
used in the estimation process are listed in Table 2. Figure 4 indicates the location of the drillholes
3
As announced to the ASX by Yandal Resources on 6 April 2023.
Page 8 of 69
ASX ANNOUNCEMENT
used to compile the MRE as well as the location of other previous drillhole collars and types within
the immediate area.
Table 2 - Drilling type used in the Gordons Dam MRE
Hole Type
Number of Holes
Total Metres
DDH
4
1206.3
RC
91
8970.0
Total
95
10176.3
Figure 4: Plan view Gordons MRE drillhole location and type including surrounding previous drilling.
Page 9 of 69
ASX ANNOUNCEMENT
The QAQC process for monitoring the sampling and assaying included:
•
•
•
•
•
•
Collection of 4 m composites using a PVC spear and 1 m samples through a rig mounted
cone splitter.
The inspection of drill samples to check recovery, moisture, and contamination.
The assaying of samples using the fire assay method.
The inclusion of certified reference standards (standards) for a range of gold grades to test
the accuracy of the laboratory.
The inclusion of fine blanks to test for contamination at the sample preparation stage and the
assaying stage.
The collection of field duplicate samples by collecting 2 samples at the same time from the
cone splitter to test the repeatability of the samples.
RC Samples were returned through a hose into a cyclone which then emptied its contents into an
RC bag. At the time of drilling, 1 m splits were taken using a riffle splitter then a 4 m composite was
collected using a 450 mm by 50 mm PVC spear-tube. If an anomalous gold grade was return (>0.1
g/t) from the composite sample, the four single metre splits were submitted for assaying.
All RC samples were visually checked for recovery and moisture content. No issues were reported
with sample recoveries. All samples were assayed using 50 g charge lead collection Fire Assay.
Eleven different standards (certified reference material - CRM) representing the range of grades
expected at Gordons Dam were submitted with samples sent to the laboratory. Standards were
inserted at an average rate of 1 in every 20 samples collected. Duplicates were collected at a
nominal rate of 1 in every 33 samples resulting in 384 duplicate pairs.
Hole collar locations have been confirmed and updated by field personnel checking locations on site.
All drill holes use the MGA Zone 51 Datum GDA 94. All holes used either a gyro or digital downhole
camera at 30 m intervals for downhole survey orientations.
All RC and DD holes have been geologically logged; the data was then entered into a Microsoft
Excel spreadsheets and imported into a Microsoft Access database.
Estimation Methodology
The model was estimated using both Ordinary Kriging (OK) and Inverse Distance Squared (ID2).
Domains were estimated separately using the wireframe as hard boundaries to prevent smearing of
grades.
Wireframes
Mineralisation wireframes were provided to BGMS by the project geologists. The wireframes consist
of a stacked series of 26 parallel lodes that have an overall trend striking towards 310° and a 30° dip
to the northeast. An additional six domains (27-32) sit in the transported and oxide zone, have
various strikes and are flat lying. A nominal cut-off of 0.5 g/t gold was used to define mineralisation
boundaries; however, lower grades were sometimes included to maintain continuity. The
Page 10 of 69
ASX ANNOUNCEMENT
mineralised lodes were flagged to the “domain” attribute in the model.
mineralisation wireframes in plane and long section views respectively.
Figure 5 shows the
Figure 5: Gordons Dam Wireframes: Plan (left), Long-section viewing north-east (top right)
Weathering
Base of alluvial (BOA), base of complete oxidation (BOCO) and top of fresh rock (TOFR) surfaces
were interpreted by the project geologists and are based on the oxidation and lithology logging in
the database.
Compositing
With over 99% of samples being 1.0 m or less in length, 1.0 m was chosen as the compositing length.
A composite string file was created in Surpac from all RC and DD drilling. The composite file was
passed through each domain wireframe and any composites falling within a wireframe were coded
with the domain number. The individual composites were combined into one file representing all
mineralisation to be used in statistical evaluation and grade estimations. All samples that fell outside
of the wireframe solids were put in another file that represents the background waste material in the
deposit.
Grade Bias Analysis
The dataset was assessed for bias from extreme grades that would require adjustment or top cut.
Composite statistics for each lode, where there were sufficient samples for statistical analysis, were
reviewed and top cuts were selected based on the coefficient of variation, the max composites value
Page 11 of 69
ASX ANNOUNCEMENT
and the grade distribution. Domains with limited samples were visually reviewed to ensure high
value composites were not having an undue effect on the mean grade.
A top cut of 19.5 g/t Au was selected by analysing the spatial characteristics of the dataset using the
series of graphs displayed in Figure 6.
Histogram With Topcut for au_uncut
M
Points:939
Total:1331.9843
99.9
99.8
Mean:1.4185
Std Dev:
4.0704
Variance:
16.5679
50
99
98
CV:2.8695
Skewness:
10.3314
Kurtosis:142.7193
Maximum:
72.9700
75%:
1.2200
40
50% (median):
0.5700
25%:
0.1900
Minimum:
0.0050
30
Cumulative Probability %
Frequency (% of 939 points)
Log Probability Plot for au_uncut
99.99
M
255075
60
95
90
80
70
60
50
40
30
20
10
20
5
10
2
1
0.5
0
0.2
0.1
0.05
0.02
0.01
10
20
30
40
50
60
70
0.01
au_uncut
0.1
1
10
au_uncut
255075
M
Points:939
Total:1331.9843
Mean:1.4185
Std Dev:
4.0704
Variance:
16.5679
CV:2.8695
Skewness:
10.3314
Kurtosis:142.7193
Maximum:
72.9700
75%:
1.2200
50% (median):
0.5700
25%:
0.1900
Minimum:
0.0050
Figure 6: Top-Cut Analysis Charts
Variography was carried out in Snowden’s Supervisor software. Experimental variograms were
generated for the lodes with sufficient samples to assess the continuity and allow for generation of
a variogram model.
To ensure the composited data accurately reflected a normal histogram for Variogram analysis a
normal scores transformation was completed. Continuity fans were then used to select the
orientations of major and minor continuities. Experimental variograms were generated for these
orientations with downhole continuity being utilised to select the nugget and the subsequent
directional variograms were fitted with models best matched to the data. The variogram model was
back transformed before being exported into a Surpac variogram file to be used in estimation.
Variography was attempted on each domain individually, however the small number of composites
available did not produce any usable variograms. To increase the number of composites available
for analysis variography was carried out on the whole dataset.
Page 12 of 69
ASX ANNOUNCEMENT
Density
There is no density data currently available for the Gordons Dam deposit. Assumed densities were
applied to the weathering profiles based on similar style deposits in the area. The densities used are
shown in Table 3.
Table 3 - Densities By Weathering Profile
Profile
Density
Alluvial
1.6
Oxide
2.1
Transitional
2.4
Fresh
2.7
Grade Tonnage Curve
The grade-tonnage calculations are tabulated in Table 4 and illustrated in Figure 7 below.
Table 4. Grade-tonnage calculations.
Cut Off
Tonnes
Cut Grade (g/t Au)
Ounces (cut)
0.5
693,086
1.24
27,720
0.75
527,779
1.43
24,333
1
365,312
1.68
19,767
1.25
254,647
1.93
15,801
1.5
179,772
2.17
12,548
1.75
130,480
2.38
9,988
2
86,492
2.64
7,336
2.25
63,304
2.82
5,742
2.5
45,614
3
4,398
2.75
27,403
3.23
2,848
3
21,794
3.32
2,328
Page 13 of 69
ASX ANNOUNCEMENT
Figure 7: Gordons Dam March 2023 MRE Grade-Tonnage Plot
Mineral Resource Classification
The Gordons Dam MRE was classified as Inferred based on several factors such as density of drill
data, geological understanding, consistency of gold assay grades and economic potential for mining.
Modifying Factors
No modifying factors were applied to the reported MRE. Parameters reflecting mining dilution, ore
loss and metallurgical recoveries will be considered during any future mining evaluation of the
project. Resources are reported as a global estimate, not constrained by an optimised pit shell.
Page 14 of 69
ASX ANNOUNCEMENT
Competent Persons Statement
Mineral Resources
The information in this announcement that relates to the Gordons Dam Mineral Resource Estimate
is based on and fairly represents information and supporting documentations compiled and
generated by Andrew Bewsher, an employee of BM Geological Services Pty Ltd (“BMGS”). Mr.
Bewsher is a member of the Australian Institute of Geoscientists (2945) and has sufficient experience
relevant to the style of mineralisation and type of deposit under consideration and to the activity
which is being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
JORC ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr. Bewsher consents to the inclusion in this announcement of the matters based on
this information in the form and content in which it appears.
Exploration Results
The information in this document that relates to exploration results, geology and data compilation is
based on information compiled under the supervision and review of Mr. Stephen Guy, a Competent
Person who is a Member of The Australian Institute of Geoscientists (8203).
Mr. Guy is the Chief Geologist for Horizon Minerals, is a full-time employee of the Company and
holds shares and options in the Company. Mr. Guy has sufficient experience which is relevant to
the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Guy consents
to the inclusion in this announcement of the matters based on this information in the form and context
in which it appears.
Next Steps 1
A detailed review of all historical work shall continue following the due diligence process, and
incorporated into the strategic plan for review and ranking amongst other current planned drill
programs.
Authorised for release by the Board of Directors
For further information, please contact:
Grant Haywood
Managing Director and CEO
Tel: +61 8 9386 9534
grant.haywood@horizonminerals.com.au
Michael Vaughan
Media Relations – Fivemark Partners
Tel: +61 422 602 720
michael.vaughan@fivemark.com.au
Page 15 of 69
ASX ANNOUNCEMENT
Forward Looking and Cautionary Statements
Some statements in this report regarding estimates or future events are forward looking statements.
They include indications of, and guidance on, future earnings, cash flow, costs and financial
performance. Forward looking statements include, but are not limited to, statements preceded by
words such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”,
“anticipates”, “believes”, “potential”, “could”, “nominal”, “conceptual” and similar expressions. Forward
looking statements, opinions and estimates included in this announcement are based on assumptions
and contingencies which are subject to change without notice, as are statements about market and
industry trends, which are based on interpretations of current market conditions. Forward looking
statements are provided as a general guide only and should not be relied on as a guarantee of future
performance. Forward looking statements may be affected by a range of variables that could cause
actual results to differ from estimated results, and may cause the Company’s actual performance and
financial results in future periods to materially differ from any projections of future performance or
results expressed or implied by such forward looking statements. These risks and uncertainties
include but are not limited to liabilities inherent in mine development and production, geological, mining
and processing technical problems, the inability to obtain any additional mine licenses, permits and
other regulatory approvals required in connection with mining and third party processing operations,
competition for among other things, capital, acquisition of reserves, undeveloped lands and skilled
personnel, incorrect assessments of the value of acquisitions, changes in commodity prices and
exchange rate, currency and interest fluctuations, various events which could disrupt operations
and/or the transportation of mineral products, including labour stoppages and severe weather
conditions, the demand for and availability of transportation services, the ability to secure adequate
financing and management’s ability to anticipate and manage the foregoing factors and risks. There
can be no assurance that forward looking statements will prove to be correct.
Statements regarding plans with respect to the Company’s mineral properties may contain forward
looking statements in relation to future matters that can only be made where the Company has a
reasonable basis for making those statements.
This announcement has been prepared in compliance with the JORC Code (2012) and the current
ASX Listing Rules.
The Company believes that it has a reasonable basis for making the forward looking statements in
the announcement, including with respect to any production targets and financial estimates, based on
the information contained in this and previous ASX announcements.
Page 16 of 69
ASX ANNOUNCEMENT
Appendix A – JORC Table 1
Project Gordons – Gordons Dam MRE
JORC Code (2012) Table 1, Section 1, 2 and 3
The following Table and Sections are provided to ensure compliance with the JORC Code (2012 edition) guidelines for the reporting of Mineral Resources.
Gordons Dam
SECTION 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC Code explanation
Commentary
Sampling techniques
Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
4m composite samples taken with a sample scoop thrust into the RC sample bag
laid out in individual metres in a plastic bag on the ground. 1m single splits taken
using a cone splitter at time of drilling, if 4m composites are anomalous (>100200ppb or lower depending on location), 1m single splits are submitted for
analyses. The average sample weights for 4m composites is approximately 3.0kg
and 3.0-4.0kg for 1m samples.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
For RC and AC drilling, regular air and manual cleaning of the cyclone to remove
hung up clays were
Share your feedback
Discover