Air-core drilling has commenced across the Caladan target area, including
five lines across the Arrakis Prospect.
•
The Caladan target area is defined by a large-scale, 8km by 3km, fold
structure truncated to the southwest by the Idaho Shear Zone, presenting a
geological architecture with similarities to several well-endowed gold
districts, including the Kalgoorlie district.
•
The Caladan target area is covered by shallow transported cover, and
broad-spaced historic drilling is predominantly ineffective, exposing
investors to a large-scale greenfield exploration opportunity within the
Northeastern Goldfields of Western Australia.
•
Recent air-core and RC drilling across a single line has confirmed primary
gold mineralisation associated with a 3km long low-level regolith anomaly,
defining the Arrakis Prospect.
•
An initial 200m hole spacing will be applied across broad 800m or 400m
spaced lines testing 6.4km of strike, with closer spaced holes (100m to 50m)
to be drilled across interpreted structures of interest.
•
The planned 12,500m, 100 air-core hole program will be completed in four
to six weeks, with assay results expected from early July through to the end
of August.
For further information or to ask questions in relation to this announcement, please visit
our Investor Hub at https://investorhub.yandalresources.com.au/link/0PQabP
Contact Us
A: Suite 1, Level 3, 1138 Hay Street,
West Perth WA 6005
T: +61 (0)8 9389 9021
E: yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL
Board and Management
Chris Oorschot
Managing Director/CEO
Greg Evans
Non-Exec Chair
Katina Law
Non-Exec Director
Greg Fitzgerald
Company Secretary
Yandal Resources Ltd (ASX: YRL, “Yandal Resources” or the “Company”) is pleased to advise that
its air-core (AC) drilling testing the large-scale Caladan target area has commenced. The AC
program will see drilling completed across ten lines, for a planned 12,500m of drilling, testing the
Caladan target area over 6.4km of strike (See Figure 1). Lines are 800m spaced with two 400m
spaced lines along strike to the north and south of previous drilling completed across the Arrakis
Prospect earlier this year. The Caladan target area, including the Arrakis Prospect (within E
53/1843, E 53/2304, E 53/2192 and E 53/1882), is part of the broader Ironstone Well-Barwidgee
Gold Project (see Figure 4), located 60km south of the Jundee mining complex (ASX: NST), and
18km north of the recent Siona discovery, within the Yandal Greenstone Belt.
Caladan is a large-scale exploration target area identified following the completion of a ground
gravity survey in early 2024 (see ASX releases dated 11 June 2024 and 15 July 2024). In late 2024,
initial air-core drilling was completed on one line across the Caladan target area, testing the core
of the CAL-01 regolith anomaly. The air-core results returned several significant intercepts,
including 11m at 1.7 g/t Au from 97m to the end of hole in 24IWBAC0063 (see ASX release, 15
January 2025). All significant intercepts occur within or directly adjacent to the 3km long CAL-01
regolith anomaly, renamed the Arrakis Prospect. A small program of shallow RC drilling was
completed to infill around air-core hole 24IWBAC0063, defining the geometry of the mineralised
structure (see ASX release 25 February 2025). Subsequent RC drilling then confirmed primary gold
mineralisation (see Figure 2) and the potential for multiple mineralised structures within a
basalt/dolerite host (see ASX release 30 April 2025).
Caladan Air-core Program Details
A 12,500m air-core program has commenced testing the Caladan Fold structure (Caladan
target area) and the program includes:
o
Eight 800m spaced drill lines (See Figure 1);
o
Two 400m spaced lines north and south of the existing Arrakis line of drilling
(See Figure 1);
o
Drill lines across the Caladan Fold will test approximately 6.4km of strike;
o
Initial hole spacing of 200m across each line, with closer-spaced holes
within the CAL-01 regolith anomaly and across interpreted lithological
boundaries and structures;
o
Routine bottom-of-hole multi-element sampling to be completed on all
holes;
o
All holes will be drilled at -60 ° to the southwest, with an average drill depth
of 100m assumed for the program;
yandalresources.com.au | ASX:YRL
2
Caladan Fold
CAL-01
Regolith
Anomaly
Arrakis
Prospect
Figure 1: A collar plan over the Caladan target area, showing simplified bedrock geology
interpretation across the Caladan and northern Irulan target areas within the IWB Gold Project.
The collars of YRL drilling, the historic 1995 RAB drilling, and all historic drilling >20m in depth are
plotted. All collars are thematically coloured by max Au (g/t Au). Also plotted are the
approved air-core drill lines for the current drill program.
yandalresources.com.au | ASX:YRL
3
Arrakis Cross-Section
northwest facing
Surface
Transported Cover
BOCO
9m @ 0.4 g/t Au
3m @ 0.2 g/t Au
8m @ 0.4 g/t Au
TOFR
11m @ 1.7 g/t Au to EOH
incl. 3m @ 3.5 g/t Au
Target
Target
11m @ 0.5 g/t Au
Incl. 3m @ 1.2g/t Au
Mafic
5m @ 1.3 g/t Au
Incl. 2m @ 2.7g/t Au
Intermediate
Figure 2: Cross-section showing all drilling results from Arrakis with a simple preliminary
interpretation of geology. The section location is shown in Figure 1. The section shows all drilling
+/-50m away from the section plane.
yandalresources.com.au | ASX:YRL
4
Caladan Target Area Summary
The Caladan target area presents a large-scale northwest plunging (interpreted) fold, truncated
by the Idaho Shear to the southwest. The Idaho Shear is interpreted as a second-order structure
linking the Ockerburry Shear Zone to the east and the Barwidgee Shear Zone to the west (see
Figure 3). The only systematic drilling across the fold structure was completed in 1995 (see ASX
release 15 July 2024), where shallow (average depth of 22m) vertical RAB holes on a 400m by
400m spacing were completed. The drilling was designed to penetrate through shallow
transported cover (2-20m deep) and sample in-situ upper saprolite clays. A review of this drilling
yielded several low-level in-situ saprolite anomalies, the largest of which (the 3km long CAL-01
anomaly) is situated in the core of the Caladan Fold (see OBL-01 Figure 1 above).
The Caladan Fold structure is 3km wide, over 8km long, and lies under loose to well-cemented
transported cover (the average depth of transported cover is 8m). The broad structural setting is
similar to the Kalgoorlie district, where the Boulder-Lefroy Fault truncates the folded mafic
stratigraphy of the Boomerang anticline (see Figure 3).
A single line of air-core drilling completed in 2024 (see ASX release 15 January 2025) has
confirmed:
o
Strong gold depletion in the upper portion of the regolith profile;
o
The 3km long CAL-01 anomaly is likely associated with primary mineralisation
hosted within a deformed and altered mafic unit;
o
Gravity highs coincide with fractionated dolerites, separated by a sequence
dominated by variably altered intermediate (andesite) volcaniclastics.
Follow-up RC drilling completed in early 2025 (see ASX release 30 April 2025) suggests:
o
Primary gold mineralisation is present on the margins of a sub-vertical 20-30m wide
shear zone hosted within a mafic unit (basalt and dolerite);
o
There is potential for multiple mineralised structures, with several remaining
untested in fresh rock.
The under-explored nature of the Caladan Fold, combined with several low-level regolith
anomalies, resulted in the Caladan target area being ranked as one of the highest priority target
areas within the Company’s project portfolio. Recent drilling results combined with observed
geology have reaffirmed the Company’s prioritisation of the Caladan target area within the
exploration strategy.
yandalresources.com.au | ASX:YRL
5
Scale Comparison
Kalgoorlie
District
Mt Charlotte
Super
Pit
Figure 3: A scale comparison of the Caladan Fold (target area) and the Kalgoorlie district, showing
simplified bedrock geology interpretations. Kalgoorlie interpreted geology adapted from N.M. Vielreicher,
D.I. Groves, N.J. McNaughton. 2016. The giant Kalgoorlie Goldfield revisited. Geoscience Frontiers, volume
7, pp. 359-374.
yandalresources.com.au | ASX:YRL
6
Looking Ahead
The Company maintains a strong cash position and a very active exploration schedule for
2025. Notable near-term activities and news flow include;
1.
Completion of the large-scale 12,500m Caladan AC program in four to six weeks;
2.
An AC drilling program across the New England Granite will be scheduled following the
completion of heritage surveys;
3.
All results from the Caladan AC program are anticipated before the end of the
September Quarter.
Authorised by the board of Yandal Resources
For further information, please contact:
Chris Oorschot
Managing Director
Yandal Resources Limited
yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL
Greg Fitzgerald
Company Secretary
+61 8 9389 9021
yandal@yandalresources.com.au
7
About Yandal Resources Limited
Yandal Resources has a portfolio of advanced gold exploration projects in the highly prospective Yandal
and Norseman-Wiluna Greenstone Belts of Western Australia.
Jundee
Wiluna
Ironstone WellBarwidgee
Wiluna
Caladan
Flushing
Meadows
Mt Keith
Mt McClure
New England
Granite
Bronzewing
Kathleen Valley
Bellevue
Darlot
Leinster
Thunder Box
King of the Hills
Figure 4: Yandal Resource exploration Project locations within the Yandal Greenstone Belt.
yandalresources.com.au | ASX:YRL
8
Competent Person Statement
The information in this document related to Exploration Results, geology and data compilation is based on
information reviewed or compiled by Mr Christopher Oorschot, a Competent Person who is a Member of
The Australasian Institute Geoscientists. Mr Oorschot is the Managing Director of the Company, is a full-time
employee and holds shares and options in the Company. Mr Oorschot has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration and to the activity which he
is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Oorschot consents to the
inclusion in this announcement of the matters based on this information in the form and context in which it
appears.
YRL confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement. The company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
Relevant Previous ASX Announcements
o
RIU Sydney Presentation, 7 May 2025
o
Arrakis RC Drilling Results, 30 April 2025
o
Ironstone Well-Barwidgee Exploration Update, 25 February 2025
o
Caladan Air-Core Drilling Demonstrates Discovery Potential, 15 January 2025
o
Air-core Drilling Commences Across Caladan and Irulan, 10 October 2024
o
Oblique Diamond Drilling Results, 3 September 2024
o
IWB Soil Results and NEG Diamond Drilling Complete, 12 August 2024
o
Large-scale Gold Anomalies Across Emerging Targets, 15 July 2024
o
Gold Coast Investment Showcase Presentation, 20 June 2024
o
Exploration Update – IWB Ground Gravity Survey, 11 June 2024
yandalresources.com.au | ASX:YRL
9
Share your feedback
Discover