Oblique Phase Two RC Drilling Results Confirm Broad Zones of Gold
Mineralisation and Define Key Structure
Key Points:
• Assay results have been received from the 2,574m reverse circulation (RC) program across the Oblique
Prospect at the Ironstone Well-Barwidgee Gold Project in the northern Yandal Greenstone Belt.
•
The results confirm the presence of multiple mineralised structures cross-cutting the magnetic stratigraphy.
Notable intercepts include:
o
o
24m @ 1.8 g/t Au from 60m (YRLRC1177),
3m @ 11. 4g/t Au from 102m (YRLRC1175),
o
9m @ 1.9 g/t Au from 63m (YRLRC1171),
o
including 2m @ 16.9g/t Au from 102m
including 2m @ 6.5g/t Au from 66m
13m @ 1.1g/t Au from 93m (YRLRC1169)
•
Geological interpretation of results suggests a large structure, designated OBL01, as a major prospect
scale control on mineralisation. Significantly, this structure is essentially un-tested to the northwest
and southeast, potentially opening up additional exploration targets peripheral to the main Oblique
mineralisation trend.
•
Preparation has commenced for the next phase of drilling, which is expected to commence late Q1 or early
Q2 2024 and include follow-up of key positions at Oblique as well as first pass drilling at two other highpriority prospects: Quarter Moon and New England Granite.
•
The Company is well funded after a successful $4 million capital raise in November 2023.
For further information or to ask questions in relation to this announcement, please visit our Investor Hub at:
https://investorhub.yandalresources.com.au/link/8r6wkP
Commenting on the new results, Yandal Resources’ Managing Director, Mr Tim Kennedy, said: We’re
pleased that results from this program have confirmed our view that Oblique has large-scale mineralisation
potential. Most importantly, these results highlight for the first time the importance of the cross-cutting structures
as a key control on mineralisation and provide a focus for exploration moving forward. The main OBL01
structure, which hosts a number of strong intercepts, including 24m @ 1.8g/t Au, remains open to the northwest
and also to the southeast, where the magnetite-rich unit exhibits zones of demagnetisation and is, therefore, a
compelling target. Other interpreted parallel structures are evident in the magnetic imagery and will also be a
focus of ongoing exploration. We are excited by the opportunity that Oblique presents and look forward to
commencing the next phase of drilling, which will also include testing our other priority targets at Quarter Moon
and New England Granite.
Registered Address
Board Members
Yandal Resources Limited
Tim Kennedy
Managing Director/CEO
Greg Evans
Non-Exec Chairman
Katina Law
Non-Exec Director
Chris Oorschot
Technical Director
Greg Fitzgerald
Company Secretary
T
+61 8 9389 9021
E
yandal@yandalresources.com.au
W
www.yandalresources.com.au
ACN 108 753 608
A
P
ABN 86 108 753 608
Level 1, U5/62 Ord Street
West Perth WA 6005
PO Box 1104
Nedlands WA 6909
Yandal Resources Ltd (ASX: YRL, “Yandal Resources” or the “Company”) is pleased to advise that
it has received all assay results from the 14-hole (2,406m) RC drilling program (with an additional
168m of drilling extending three previous drilled RC holes), completed at the Oblique (E 53/1882)
Prospect within the Ironstone Well – Barwidgee (IWB) Gold Project (see Figure 1).
Results received from drilling across Oblique have:
•
Highlighted broader and higher-grade mineralisation where previous drilling was unable to
effectively test the target due to difficult ground conditions,
•
Refined the geometry of broad and higher-grade mineralisation in the north, associated with
quartz veining within an interpreted north-west striking north-east dipping structure (designated
OBL01), which remains open along strike and down plunge,
o
•
Critically, this structure is relatively un-tested outside of the main Oblique trend.
Identified a number of potential parallel structures to the south that are open along strike and
at depth.
BACKGROUND
Oblique is located approximately 6km northwest along strike from the 268,000oz Flushing Meadows
Resource and 45km south of Northern Star’s (ASX: NST) Jundee Mine (see Figure 1). Oblique and
Flushing Meadows are adjacent to the Barwidgee Shear Zone, a major regional mineralised structure.
Previous drilling highlighted that Oblique has strongly anomalous gold over a 1.9km long zone and
returned numerous intercepts, some of which are broad and contain higher-grade cores.
A review of previous drilling indicated that mineralisation occurs in multiple sub-parallel
positions with many holes ending in mineralisation or not having effectively tested the full
width of the host stratigraphic sequence. The scale of the regolith and surface anomaly, combined
with the limited effectiveness of previous drilling, prompted the prioritisation of Oblique for drilling in
2023. The recently completed RC program aimed to:
•
Further test mineralisation within the currently defined Exploration Target extents,
•
Test for mineralisation 400m south of previous RC drilling and
•
Obtain several intercepts of mineralisation within fresh rock.
ASX Announcement 12th January 2024
Page 2
FIGURE 1: IRONSTONE WELL / BARWIDGEE PROJECT OVERVIEW SHOWING THE OUTLINE OF YRL TENURE, REGIONAL
INTERPRETED BEDROCK GEOLOGY, AND THE LOCATION OF PROSPECTS DISCUSSED IN THIS REPORT. THE DASHED RED LINE IS
A CIRCLE WITH A 5KM RADIUS HIGHLIGHTING THE PROXIMITY BETWEEN THE FLUSHING MEADOWS DEPOSIT AND THE OBLIQUE
AND QUARTER MOON PROSPECTS.
ASX Announcement 12th January 2024
Page 3
TECHNICAL SUMMARY
RC Drilling Results
The Oblique RC program comprised 14 holes for 2,406m along 1,100m of strike. In addition to
these holes, three previously drilled RC holes were extended for a total of 168m. Despite difficult
drilling conditions, all holes were completed to the designed depth. The program successfully achieved
its purpose, namely to:
•
Further test mineralisation within the currently defined Exploration Target extents,
•
Test for mineralisation 400m south of previous RC drilling and
•
Obtain several intercepts of mineralisation within fresh rock.
High water volumes, particularly within quartz veining, around intrusive contacts and high sulphide
zones, meant that wet samples were recovered in lieu of dry samples, with some evidence of sample
volume loss observed, particularly in deeper holes.
Results for all submitted samples have been received. Significant intercepts are summarised below,
illustrated in Figures 2 to 7, and listed in Tables 1 and 2.
o
o
24m @ 1.8 g/t Au from 60m (YRLRC1177),
3m @ 11.4 g/t Au from 102m (YRLRC1175),
o
9m @ 1.9 g/t Au from 63m (YRLRC1171),
o
including 2m @ 16.9 g/t Au from 102m
including 2m @ 6.5 g/t Au from 66m
13m @ 1.1 g/t Au from 93m (YRLRC1169)
The results build on previous RC drilling completed in October 2023 (see ASX release 25th October
2023).
Geology
The Oblique Prospect is interpreted to be hosted within the same Archaean greenstone volcanosedimentary sequence (greenschist facies metamorphosed) as the Company’s nearby 268,000oz
Flushing Meadows Mineral Resource. The prospect is characterised by a prominent magnetic northwest striking magnetic high (see Figure 2). Limited historical mapping identified chert, shale, and
felsic/intermediate volcaniclastics outcropping across the prospect. Previous historic drilling confirmed
cherts, shales and felsic to intermediate volcaniclastic lithologies; however, the source of the magnetic
anomaly was never identified. The stratigraphic sequence is northeast dipping and striking
approximately to the northwest. The regionally significant Barwidgee Shear Zone is interpreted to
strike just west of the prospect (parallel to stratigraphy), while multiple second-order, north-striking
shears cross-cut stratigraphy, possibly offsetting the stratigraphic sequence.
The recently completed RC drilling across Oblique has refined the Company’s interpretation of the
local stratigraphy and identified the primary source of the magnetic anomaly across the prospect
The linear magnetic anomaly across Oblique correlates with a 12-16m wide magnetite-chlorite
(altered) unit variably intruded by a number of intermediate porphyry bodies. The protolith for this unit
ASX Announcement 12th January 2024
Page 4
is unknown. A massive sulphide (pyrite dominant) unit, prevalent in historical drilling in the north of the
prospect, is likely the same unit but altered by reduced fluids.
The regolith across the prospect is interpreted to be a partially eroded in-situ regime with a thin veneer
of transported colluvium in places. Weathering is deep across the prospect, with fresh rock only
evident at vertical depths between 60m and 100m.
Mineralisation
The recently completed RC program has provided a more comprehensive test of mineralisation.
Geological logging suggests higher-grade mineralisation is associated with quartz veining and
sulphide alteration in combination with shearing and/or brecciation. Within oxidised to
transitional intercepts, mineralisation shows abundant quartz veining with associated vuggy/box work
textured, medium to coarse iron oxides, often seen with relict sulphides in transitional zones. Fresh
rock intercepts typically display quartz veining with semi-massive pyrite as disseminations, blebs and
laminations.
At the prospect scale, mineralisation appears to be broadly controlled by northwest striking (striking
300° to 310°) and northeast dipping structures slightly oblique to stratigraphy (striking 320° to 330°).
The intersection of this structural trend with stratigraphy would produce a moderate (45°) plunge
towards the north.
Section B in Figure 4 demonstrates the need to effectively drill through the target sequence across
the Oblique Prospect with a majority of previous drilling ending in mineralisation due to difficult drilling
conditions. YRLRC1177 provides a significant intercept of:
o
24m @ 1.8g/t Au from 60m
o
13m @ 1.7g/t Au from 86m (CYPFRC15) – Historic
This result is directly along the strike of several partial intercepts (drilling ended in mineralisation),
including:
o
o
12m @ 1.1 g/t Au from 84m (YRLRC1157) – ASX 25th October 2023
21m @ 0.96 g/t Au from 51m (YRLRC481)
Including 4m @ 1.9 g/t Au from 68m to EOH – ASX 9th March 2021
Current interpretations suggest the broad intercept in YRLRC1177 correlates with the interaction of
an oblique northwest striking, northeast dipping mineralised structure with the magnetite-chlorite
unit. This structure has been designated OBL01 (Figure 2). Previous drilling combined with the
most recent results suggests this structure is mineralised over 300m of strike extent and open to the
north. This represents a key insight from the 2023 RC drilling program that will drive the next round
of exploration drilling across the Oblique Prospect. Significantly, the OBL01 structure, when
projected along strike to the northwest and southeast, is critically un-tested, presenting new
structural targets for future exploration beyond the Oblique Prospect.
Section A in Figure 3 shows YRLRC1175, the deepest hole completed across the Oblique prospect
with an intercept of 31m @ 0.4 g/t Au from 163m, confirming the presence of mineralisation at depth
within fresh rock (noting that samples collected were wet with some volume loss). The same drill hole
also returned a high-grade intercept in the hanging wall of:
ASX Announcement 12th January 2024
Page 5
o
3m @ 11.4 g/t Au from 102m (YRLRC1175),
including 2m @ 16.9 g/t Au from 102m
This result represents a parallel structure within the hanging wall of the main mineralised trend.
Drilling to the south confirms the broader potential for additional mineralised structures to the south.
These intercepts include (see Sections C and D in Figures 5 & 6):
o
o
o
9m @ 1.9g/t Au from 63m (YRLRC1171), and
9m @ 1.0 g/t Au from 75m (YRLRC1168), and
13m @ 1.1g/t Au from 93m (YRLRC1169)
These results suggest that additional oblique structures comparable to OBL01 may be present
to the south and provide clear targets for follow-up drilling. In addition to this, historical drilling to the
north presents a number of trends comparable to OBL01, see Figure 2.
ASX Announcement 12th January 2024
Page 6
FIGURE 2: PLAN OF THE OBLIQUE PROSPECT SHOWING ALL COLLARS COLOUR-CODED BY MAX AU IN HOLE (G/T AU) AND
ALL NEW DRILLING (NOT COLOUR-CODED). OVERLYING A COMPOSITE AERIAL MAGNETIC IMAGE OF REDUCED TO POLE
(1VD, NON-LINEAR) AND REDUCED TO POLE (2VD, NON-LINEAR). INTERPRETED SURFACE PROJECTIONS OF THE
MAGNETITE-CHLORITE ALTERED UNIT AND THE OBL01 STRUCTURE ARE ALSO PLOTTED AND LABELLED.
ASX Announcement 12th January 2024
Page 7
FIGURE 3: OBLIQUE CROSS-SECTION A (SEE LONGITUDINAL SECTION FOR SECTION LOCATION), SHOWING RC DRILLING
COMPLETED BY THE COMPANY IN NOVEMBER 2023 AND ASSAY RESULTS, WITH A PRELIMINARY INTERPRETATION OF
MINERALISATION (RED POLYGONS).
ASX Announcement 12th January 2024
Page 8
FIGURE 4: OBLIQUE CROSS-SECTION A (SEE LONGITUDINAL SECTION FOR SECTION LOCATION), SHOWING RC DRILLING
COMPLETED BY THE COMPANY IN NOVEMBER 2023 AND ASSAY RESULTS, WITH A PRELIMINARY INTERPRETATION OF
MINERALISATION (RED POLYGONS).
ASX Announcement 12th January 2024
Page 9
FIGURE 5: OBLIQUE CROSS-SECTION A (SEE LONGITUDINAL SECTION FOR SECTION LOCATION), SHOWING RC DRILLING
COMPLETED BY THE COMPANY IN NOVEMBER 2023 AND ASSAY RESULTS, WITH A PRELIMINARY INTERPRETATION OF
MINERALISATION (RED POLYGONS).
ASX Announcement 12th January 2024
Page 10
FIGURE 6: OBLIQUE CROSS-SECTION A (SEE LONGITUDINAL SECTION FOR SECTION LOCATION), SHOWING RC DRILLING
COMPLETED BY THE COMPANY IN NOVEMBER 2023 AND ASSAY RESULTS, WITH A PRELIMINARY INTERPRETATION OF
MINERALISATION (RED POLYGONS).
ASX Announcement 12th January 2024
Page 11
Exploration Target
The Exploration Target for the Oblique Prospect remains unchanged with these new results (See ASX
release 25th of October 2023).
Next Steps
Results from this most recent drilling program justify further exploration with future programs to focus
on identifying new and extending known mineralised structures, with a particular focus on where these
structures interact with magnetite-rich stratigraphy.
An initial diamond drilling program is scheduled for March/April 2024 to provide detailed information
regarding the host stratigraphy, structures, intrusive types and the nature of the magnetite-rich unit
across the Oblique Prospect.
In addition to this, the Company will assess options for capturing more detailed aerial magnetics
across the prospect to aid in geological interpretations and exploration targeting.
Subject to further analysis of the results and logged geology, follow-up RC drilling will be designed to
test the OBL01 structure and equivalent parallel structures along strike with a focus on completing
additional drilling in the northern half of the Prospect and further delineating newly identified structures
in the south. The aim of this work will be the projection of any newly identified structures into the
magnetite-chlorite unit to delineate high-priority targets for future drilling.
In addition to this, a broader projection of the interpreted OBL01 structure to the northwest and
southeast also presents new exploration targets outside of the Oblique Prospect. Subject to further
verification of the OBL01 structure in the next drilling program, the projected extensions will also be
evaluated as exploration targets going forward (see Figure 2).
ASX Announcement 12th January 2024
Page 12
ASX Announcement 12th January 2024
Page 13
FIGURE 7: SOUTH-WEST FACING, COMPOSITE LONGITUDINAL SECTION ACROSS THE OBLIQUE PROSPECT SHOWING ALL INTERCEPTS >0.3 G/T AU (MAXIMUM TOTAL LENGTH OF
WASTE 4M, WITH NO MORE THAN 2M OF CONSECUTIVE WASTE INTERVALS). COLOURED BY INTERCEPT GRADE (AU PPM) AND SIZED BY INTERCEPT LENGTH (M). AT 2X VERTICAL
EXAGGERATION. INTERCEPTS PLOTTED ARE HOSTED IN SEVERAL PARALLEL POSITIONS.
LOOKING AHEAD
The Company has a very active H1 CY 2024 planned and is well funded after a successful $4 million
capital raise in November 2023, with priority exploration activities including;
1. Follow-up diamond drilling is scheduled for March/April across the Oblique Prospect;
2. The refinement of exploration targets for follow-up RC drilling across the 4.2km eastern
granite margin of the New England Granite (NEG) Prospect is underway. This will be assisted
through Exploration Incentive Scheme co-funding to support the completion of two deep
(400m) diamond holes across the NEG prospect. Drilling is being scheduled for April.
3. Preparation for RC drill testing Quarter Moon (IWB Project) in H1 2024.
4. Finalisation of exploration targets and drilling strategy across the expanded Gordons Gold
Project.
5. Awaiting orientation soil sampling results from Oblique. These results will be used to assess
the viability of a broader soil sampling program across the Project for targeting lithium-bearing
pegmatites. In addition to this, a review of the lithium-bearing pegmatite prospective for the
Mt McClure and Gordons Project will be completed in Q1 CY 2024.
Authorised by the board of Yandal Resources
For further information, please contact:
Tim Kennedy
Managing Director
Yandal Resources Limited
yandal@yandalresources.com.au
Greg Fitzgerald
Company Secretary
+61 8 9389 9021
yandal@yandalresources.com.au
About Yandal Resources Limited
ASX Announcement 12th January 2024
Page 14
Yandal Resources was listed on the ASX in December 2018 and has a portfolio of advanced gold exploration
projects in the highly prospective Yandal and Norseman-Wiluna Greenstone Belts of Western Australia.
Yandal Resources’ gold project locations.
Yandal Resources Ltd - Mineral Resource Summary
Deposit
Ironstone Well
Flushing Meadows1
Mt McClure
Challenger2
Success3
Parmelia4
HMS Sulphur5
Gilmore6
Sub-total - MMC
Gordons
Gordons Dam7
Grand-total8
Tonnes
(‘000s)
2,141
2,141
Indicated
Grade
(g/t)
Au
(oz)
1.3
91,000
1.3
91,000
Inferred
Grade
(g/t)
Au
(oz)
5,245
1.1
177,000
718
1,255
252
1010
134
3,369
1.9
1.9
2.1
1.2
1.7
1.7
365
8,979
1.7
1.3
Tonnes
(‘000)
Total
Grade
(g/t)
Au
(Oz)
7,386
1.1
268,000
44,000
75,000
17,000
39,000
7,200
182,200
718
1,255
252
1010
134
3,369
1.9
1.9
2.1
1.2
1.7
1.7
44,000
75,000
17,000
39,000
7,200
182,200
20,000
379,200
365
11,120
1.7
1.4
20,000
470,200
Tonnes
(000’s)
Due to the effects of rounding, totals may not represent the sum of the individual components.
1. Reported above 0.5g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 4 November 2020 for full
details. 2. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 22 August 2022
for full details 3. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 6 September
2022 for full details.4. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 20
September 2022 for full details 5. Reported above 0.5g/t Au lower cut-off grade within this announcement 6. Reported above 1.0g/t
Au lower cut-off grade within this announcement 7. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd
ASX announcement dated 6 April 2023 for full details 8. All Resources are reported as global estimates, not constrained by optimised
pit shells.
Competent Person Statement
ASX Announcement 12th January 2024
Page 15
The information in this document related to Exploration Targets and Exploration Results, geology and data
compilation is based on information reviewed or compiled by Mr Christopher Oorschot, a Competent
Person who is a Member of The Australasian Institute Geoscientists. Mr Oorschot is the Exploration
Manager and Technical Director for the Company, is a full-time employee and holds options in the
Company. Mr Oorschot has sufficient experience which is relevant to the style of mineralisation and type
of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person
as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Mr Oorschot consents to the inclusion in this announcement of the matters
based on this information in the form and context in which it appears.
The information in this announcement that relates to the Flushing Meadows, Mt McClure and Gordons
Dam Mineral Resource Estimates is based on information compiled and generated by Andrew Bewsher,
an employee of BM Geological Services Pty Ltd (“BMGS”). Both Andrew Bewsher and BMGS hold shares
in the company. BMGS consents to the inclusion, form and context of the relevant information herein as
derived from the original resource reports. Mr Bewsher has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration and to the activity which is being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the JORC ‘Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves’.
YRL confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement. The company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
Forward Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include, but
are not limited to, statements concerning Yandal Resources Limited’s (Yandal’s) current expectations,
estimates and projections about the industry in which Yandal operates, and beliefs and assumptions
regarding Yandal’s future performance. When used in this document, words such as “anticipate”, “could”,
“plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are
forward-looking statements. Although Yandal believes that its expectations reflected in these forwardlooking statements are reasonable, such statements are subject to known and unknown risks, uncertainties
and other factors, some of which are beyond the control of Yandal and no assurance can be given that
actual results will be consistent with these forward-looking statements. Drilling results presented indicate
geological potential for mineralisation but there can be no certainty that these results will eventually form
part of a Mineral Resource Estimate.
ASX Announcement 12th January 2024
Page 16
Table 1 – Oblique - Summary of significant RC drilling assay results >0.3g/t Au with no more than 2m of
continuous internal waste included unless otherwise stated.
Prospect
Hole
Id
Sample
type / Sub
Interval
From
(m)
To
(m)
Interval
(m)
Au
(g/t)
Oblique
YRLRC1164
RC 1m
43
44
1
0.6
Oblique
YRLRC1165
RC 1m
72
73
1
0.6
Oblique
YRLRC1166
RC 1m
114
117
3
0.4
Oblique
YRLRC1166
RC 1m
126
127
1
0.4
Oblique
YRLRC1167
RC 1m
15
16
1
0.5
Oblique
YRLRC1168
RC 1m
75
84
9
1
Oblique
YRLRC1168
RC 1m
87
88
1
0.5
Oblique
YRLRC1168
RC 1m
91
97
6
0.8
Oblique
YRLRC1168
RC 1m
102
106
4
0.4
Oblique
YRLRC1168
Or
75
106
31
0.6
Oblique
YRLRC1168
RC 1m
114
115
1
0.4
Oblique
YRLRC1168
RC 1m
123
125
2
0.4
Oblique
YRLRC1169
RC 1m
83
84
1
0.5
Oblique
YRLRC1169
RC 1m
93
106
13
1.1
Oblique
YRLRC1169
RC 1m
110
111
1
1.1
Oblique
YRLRC1169
RC 1m
118
123
5
0.4
Oblique
YRLRC1169
Or
93
123
30
0.6
Oblique
YRLRC1169
RC 1m
135
136
1
0.4
Oblique
YRLRC1169
RC 1m
164
165
1
0.4
Oblique
YRLRC1170
RC 1m
145
146
1
0.4
Oblique
YRLRC1170
RC 1m
169
171
2
0.8
Oblique
YRLRC1170
RC 1m
208
210
2
0.6
Oblique
YRLRC1171
RC 1m
63
72
9
1.9
Oblique
YRLRC1171
Including
66
68
2
6.5
Oblique
YRLRC1171
RC 1m
77
81
4
1.3
Oblique
YRLRC1171
Or
63
81
18
1.3
Oblique
YRLRC1171
RC 1m
109
110
1
0.3
Oblique
YRLRC1172
RC 1m
54
55
1
0.4
Oblique
YRLRC1172
RC 1m
92
93
1
1.3
Oblique
YRLRC1172
RC 1m
105
107
2
0.4
Oblique
YRLRC1172
RC 1m
112
118
6
0.5
Oblique
YRLRC1173
RC 1m
6
10
4
0.4
Oblique
YRLRC1173
RC 1m
15
17
2
0.8
Oblique
YRLRC1173
RC 1m
21
24
3
0.9
Oblique
YRLRC1173
RC 1m
29
37
8
0.4
Oblique
YRLRC1173
RC 1m
57
58
1
0.6
Oblique
YRLRC1173
RC 1m
115
116
1
0.5
Oblique
YRLRC1173
RC 1m
141
146
5
0.5
Oblique
YRLRC1174
RC 1m
98
103
5
0.8
Oblique
YRLRC1175
RC 1m
102
105
3
11.4
Oblique
YRLRC1175
Including
102
104
2
16.9
Oblique
YRLRC1175
RC 1m
108
109
1
0.5
Oblique
YRLRC1175
RC 1m
112
113
1
0.4
Oblique
YRLRC1175
RC 1m
163
194
31
0.4
ASX Announcement 12th January 2024
Comment
Using a > 0.1g/t Au Cut-off
Using a > 0.1g/t Au Cut-off
Using a > 0.1g/t Au Cut-off
Note: Wet samples from 174m
Page 17
Prospect
Hole
Id
Sample
type / Sub
Interval
From
(m)
To
(m)
Interval
(m)
Au
(g/t)
Oblique
YRLRC1175
RC 1m
230
235
5
0.6
Oblique
YRLRC1175
RC 1m
247
252
5
0.4
Oblique
YRLRC1176
RC 1m
96
112
16
0.4
Oblique
YRLRC1176
RC 1m
148
150
2
5.8
Oblique
YRLRC1176
RC 1m
194
195
1
1.5
Oblique
YRLRC1177
RC 1m
60
84
24
1.8
Oblique
YRLRC1177
RC 1m
92
94
2
1.2
Oblique
YRLRC1177
RC 1m
107
109
2
0.6
Oblique
YRLRC1160
RC 1m
153
154
1
0.3
Oblique
YRLRC1160
RC 1m
158
161
3
Oblique
YRLRC1162
RC 1m
Oblique
YRLRC1163
RC 1m
111
118
7
0.7
Oblique
YRLRC1163
RC 1m
155
156
1
0.7
Oblique
YRLRC1163
RC 1m
173
174
1
0.5
Comment
0.9
NSA
Table 2 –Oblique RC collar location summary for this release.
Prospect
Hole ID
Hole
type
East
(m)
North
(m)
Azimuth
(degrees
)
Dip
(degrees)
Total
Depth
(m)
Oblique
YRLRC1164
RC
275340
7034504
220
-60
150
Oblique
YRLRC1165
RC
275389
7034561
220
-60
150
Oblique
YRLRC1166
RC
275434
7034626
220
-60
150
Oblique
YRLRC1167
RC
274992
7034871
220
-60
72
Oblique
YRLRC1168
RC
275042
7034934
220
-60
168
Oblique
YRLRC1169
RC
275093
7034994
220
-60
270
Oblique
YRLRC1170
RC
274958
7035067
220
-60
216
Oblique
YRLRC1171
RC
274835
7035075
220
-60
126
Oblique
YRLRC1172
RC
274863
7035108
220
-60
174
Oblique
YRLRC1173
RC
274818
7035210
220
-60
186
Oblique
YRLRC1174
RC
274791
7035179
220
-60
108
Oblique
YRLRC1175
RC
274727
7035418
220
-60
264
Oblique
YRLRC1176
RC
274775
7035310
220
-60
240
Oblique
YRLRC1177
RC
274749
7035278
220
-60
132
Oblique
YRLRC1160 (re-entry)
RC
275129
7034874
220
-60
180 (from 138m)
Oblique
YRLRC1162 (re-entry)
RC
274905
7035004
220
-60
132 (from 72m)
Oblique
YRLRC1163 (re-entry)
RC
274931
7035035
220
-60
174 (from 108m)
ASX Announcement 12th January 2024
Page 18
Appendix 2 – Ironstone Well-Barwidgee Gold Project
JORC Code (2012) Table 1, Sections 1 and 2
Mr Christopher Oorschot, Exploration Manager of Yandal Resources, compiled the information in Section 1 and Section 2 of the following JORC Table 1 and is the
Competent Person for those sections. The following Table and Sections are provided to ensure compliance with the JORC Code (2012 edition) requirements for the
reporting of Exploration Results.
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random chips,
or specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down
hole gamma sondes, or handheld XRF instruments, etc.). These
examples should not be taken as limiting the broad meaning of
sampling.
•
•
•
•
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
•
•
Aspects of the determination of mineralisation that are Material
to the Public Report. In cases where ‘industry standard’ work
has been done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples from which 3
kg was pulverised to produce a 30 g charge for fire assay’). In
other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
ASX Announcement 12th January 2024
•
A total of 39 Reverse Circulation (RC) holes have been drilled across the Oblique Prospect for a total
of 6,489m. 27 of these RC holes were completed by Yandal Resources for a total of 4,861m, while there
are 13 historic RC holes for a total of 1,628m. There are four historic diamond holes completed across
the Oblique Prospect, for a total of 717.9m. Drill holes vary in depth from 72m to 270m.
Yandal Resources (YRL) RC Samples were collected via a rig-mounted static cone splitter, splitting
approximately 12.5% of the total sample. Two splits are collected for each metre: a primary sample and
a duplicate sample. The primary 1m samples are then sent to a lab for further analysis. While the
duplicate samples are retained on-site unless submitted as a routine duplicate.
For historical RC drilling, sampling practices by previous operators are assumed to be industry standard
at that time. Sampling procedures would be comparable to those applied by Yandal Resources as per
the above but with variations in the type of splitter used, etc.
Historic core sampling procedures are unknown and are assumed to be industry standard at that time.
Historic core samples have not been retained by the project and are unavailable for review.
For YRL RC drilling, the cone splitter is regularly cleaned and inspected. The 1m bulk samples are laid
out in drill order. These bulk samples are regularly inspected for contamination, and the volume of the
bulk sample is monitored. These bulk samp