First Arrakis Diamond Results & RC Drilling Underway
Released
Released
Announcement PDF
Contact Us
A: Suite 1, Level 3, 1138 Hay Street,
West Perth WA 6005
T: +61 (0)8 9389 9021
E: yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL
Board and Management
Chris Oorschot Managing Director/CEO
Greg Evans Non-Exec Chair
Katina Law Non-Exec Director
Greg Fitzgerald Company Secretary
Owen Casey Exploration Manager
Arrakis Diamond Drilling Complete With First Results
Received & RC Drilling Now Underway
• First diamond drilling results received from re-entries of 25IWBRC0040 and
25IWBRC0041, upgrade the original intercepts to:
o 56.50m @ 1.3g/t Au from 108m in 25IWBRC0040D, including
14.75m @ 3.3g/t Au from 149m, and
o 37.00m @ 0.6g/t Au from 180m in 25IWBRC0041D, including
6.50m @ 1.5g/t Au from 180m
• Results indicate mineralisation on this section is broader than earlier
interpretations, with an apparent true width of approximately 35m.
• Arrakis diamond drilling program is complete with 1,931m drilled across four
diamond-tails and four holes from surface.
• Geological observations from diamond drilling indicated mineralisation is
primarily associated with a heavily deformed and altered sedimentary
package bracketed by pillow basalts to the northeast and dolerite to the
southwest.
• Diamond drilling combined with previous RC drilling indicates that the host
sedimentary unit of varying thickness is laterally continuous across more
than 2.2km and open towards the southeast.
• Results from the remainder of the diamond drilling program are anticipated
throughout December.
• Three 400m spaced air-core lines have been completed to the southeast
of the current Arrakis discovery to test for the Arrakis stratigraphy, with results
anticipated from mid-December.
• A ~5,000m RC drilling program, across 200m spaced lines across the
currently defined Arrakis trend, has commenced.
ASX Announcement
24 November 2025
For further information or to ask questions in relation to this announcement, please
visit our Investor Hub at https://yandalresources.com.au/link/rLwlqe
yandalresources.com.au | ASX:YRL 2
Commenting on the exploration update and new results, Yandal Resources’ Managing
Director, Mr. Chris Oorschot, said: “The Yandal team has continued to ramp up exploration
activities over October and November as we pursue the recent Arrakis Discovery and
finalise preparations for our extensive 2026 programs across Arrakis, the New England
Granite target area and the Flushing Meadows deposit.
The completed diamond drilling, together with previous RC drilling, has allowed the team
to develop a preliminary geological model around the Arrakis discovery. This will provide
strong context for the diamond drilling results and a clear geological framework to support
final drill-hole designs for the November Arrakis RC program that has now commenced.
Critically, the identified structure and host to mineralisation has been confirmed over more
than 2.2km of strike in both fresh rock RC drilling and diamond drilling, and remains open
along strike to the southeast. Our first diamond drilling results have confirmed early
interpretations and demonstrated that the apparent true width of the mineralisation is
broader than earlier interpretations suggested. Diamond core also indicates mineralisation
is relatively visual in terms of alteration and deformation. The team is eagerly awaiting
results from the remaining diamond holes.
Our recently completed air-core drilling has tested for the southeastern continuation of
the Arrakis structure and stratigraphy.
RC drilling has recommenced at Arrakis, and will allow further refinements to the
geological model and a more refined assessment of the scale of the Arrakis mineralised
system ahead of the 2026 drilling season.”
Yandal Resources Ltd (ASX: YRL, “Yandal Resources” or the “Company”) is pleased to provide an
exploration update for the Arrakis Prospect within the Ironstone Well-Barwidgee Gold Project. The
maiden Arrakis diamond drilling program is complete with four re-entries (diamond tails to
previously reported RC holes) and four new holes drilled for a total of 1,931m. First results from two
of four diamond tails have been received and confirm apparent true widths of 35m for the
25IWBRC0040D and 25IWBRC0041D section (Arrakis discovery holes), as shown in Figure 1.
Geological observations from the diamond drilling program have enabled the development of
a preliminary geological model. The preliminary geological model will provide a robust
framework for assessing results as they are received.
A small follow-up air-core drilling program has been completed across three 400m spaced lines
to the south of Arrakis. An additional 16 air-core holes for 1,872m were drilled to test for the Arrakis
stratigraphy and structure directly along strike to the southeast of the currently defined trend.
Geological observations have enabled a revised interpretation of the bedrock across the drill
area (see Figure 2). Results from the AC program are anticipated from mid-December onwards.
The November Arrakis RC drilling program has commenced, with circa. 5,000m set to be drilled
by mid-December on 200m spaced drill lines covering 2.2km of strike, with results enabling the
Company to assess the scale of the recently discovered mineralised system.
yandalresources.com.au | ASX:YRL 3
Arrakis Diamond Drilling Results
First results from the Arrakis diamond drilling program have been received. These results are from
diamond extensions (or diamond tails) to RC holes 25IWBRC0040 and 25IWBRC0041 (see ASX
release 22 September 2025). Extending these holes with diamond drilling enabled rapid access
to diamond core through the Arrakis mineralisation. This has allowed the team to study the Arrakis
mineralisation style and geometries in preparation for the broader RC program, which has now
commenced. Results from the first two diamond tails include:
o 56.50m @ 1.3g/t Au from 108m in 25IWBRC0040D, including
14.75m @ 3.3g/t Au from 149m
o 37.00m @ 0.6g/t Au from 180m in 25IWBRC0041D, including
6.50m @ 1.5g/t Au from 180m
Using a 0.1g/t lower cut-off grade, this intercept can be more
broadly reported as 56.2m @ 0.5g/t Au from 180m.
Results from both holes suggest mineralisation has an apparent true width of approximately 35m
on this section. Diamond drilling also confirms a vertical-to-subvertical geometry of the host
sedimentary unit.
Geological observations from drilling indicate two different mineralisation types:
• A broad lower-grade style of mineralisation hosted within a silica-sericite altered
volcano-sedimentary unit that has been broadly and weakly fractured to brecciated
with chlorite-biotite-filled fractures that also contain pyrite, and with fine disseminated
pyrite throughout (Figure 4).
• A higher-grade style of mineralisation that is associated with a more intense level of
brittle-ductile deformation and strong silica-pyrite alteration (Figure 3). This style of
mineralisation can also be sheared and intercalated (mixed) with the bounding basalts
and dolerites.
Mineralisation appears to be broadly strata-bound (contained within the host sedimentary unit),
though there is some subordinate mineralisation hosted within deformed and altered basalt and
dolerite.
Results from 25IWBDD0011, located approximately 100m below 25IWBRC0041D (see Figure 1), are
expected in 2-3 weeks. This drill hole intercepted the host sequence from 310.25m to 322.7m, with
strong brecciation and alteration observed across most of the interval.
yandalresources.com.au | ASX:YRL 4
Figure 1: Cross-section showing all RC drilling results from 25IWBRC0040D and 25IWBRC0041D, with a
simple preliminary interpretation of geology. The section location is shown in Figure 2. The section shows
all drilling within +/- 50m of the section plane. The red mineralisation envelope also represents the
interpreted host volcano-sedimentary unit.
Cross-Section A
northwest facing
Transported Cover
Surface
Dolerite
11m @ 1.4 g/t Au
incl. 6m @ 2.3 g/t Au
37.00m @ 0.6 g/t Au
incl. 6.50m @ 1.5g/t Au
56.50m @ 1.3 g/t Au incl.
14.75m @ 3.3 g/t Au
Completed
Diamond
Drill Hole
yandalresources.com.au | ASX:YRL 5
Arrakis Air-Core Drilling
Following access delays to the west side of the New England Granite target area, the air-core rig
was re-deployed to complete an additional 16 air-core holes for 1,872m across three 400m
spaced lines located directly southeast of the currently defined Arrakis trend. The program was
designed to test for the southeast continuation of the Arrakis mineralised trend and host
stratigraphy. Results are anticipated from mid-December onwards.
Arrakis RC Program
An approximately 5,000m RC program has commenced across the Arrakis Prospect. The program
will aim to test the 2.2km striking Arrakis trend across 200m spaced lines (see Figure 2) to define
the extent of the Arrakis mineralised system. The drilling will also begin mapping how gold
mineralisation varies along strike and at depth.
The results from this RC program, combined with recent diamond drilling, will enable an
assessment of the scale of the newly identified mineralised system and influence the extent of
future drilling in 2026.
Arrakis Geological Setting
Diamond drilling across Arrakis, covering 2.2km of strike (see Figure 2), has enabled the
development of a simplified geological model for the prospect, based on geological
observations and structural measurements collected from diamond core. Key geological
interpretations include:
• Mineralisation is associated with a sequence of heavily deformed sediments dominated
by interpreted intermediate volcanic sediments with minor shales and cherts;
• These sediments are often sheared and intercalated with a pillow basalt sequence to
the northeast and a dolerite sequence to the southwest;
• Diamond drilling combined with previous RC drilling demonstrates that the host
sedimentary unit of varying thickness is laterally continuous across more than 2.2km and
open towards the southeast.
• Two key shear trends have been observed within the diamond core: a moderately
northeast-dipping group of shear zones and shear fabric sub-parallel to the strike and
dip of the sedimentary unit.
• Kinematic indicators, including shallow northwest plunging mineral lineations in
mylonites, suggest a dominant sinistral (left-lateral) strike-slip deformation event.
yandalresources.com.au | ASX:YRL 6
Figure 2: A collar plan over the Arrakis Prospect within the Caladan target area, showing simplified
bedrock geology interpretation. All Yandal drilling is plotted (historic drilling has been excluded.
Collars are thematically coloured by max Au (g/t) in the hole. The red line represents the
approximate position of the interpreted Arrakis mineralised structure over more than 2.2km in strike
length. Dashed yellow polygons represent air-core regolith anomalies (Results include ~4m @ 0.1
g/t Au or greater, with the upper profile or the bottom-of-hole sample is 0.1g/t Au or greater).
Caladan
Fold
Interpreted Arrakis
Trend
25IWBRC0041D
37m @ 0.6 g/t Au incl.
6.5m @ 1.5g/t Au
25IWBRC0042
50m @ 1.3 g/t Au incl.
28m @ 1.9g/t Au
25IWBRC0040D
56.50m @ 1.3 g/t Au incl.
14.75m @ 3.3 g/t Au
25IWBRC0046D
Assays Pending
25IWBDD0013
Assays Pending
25IWRC0044D
Assays Pending
25IWRC0036D
Assays Pending
25IWDD0012
Assays Pending
25IWDD0011
Assays Pending
25IWBRC0043
16m @ 1.1 g/t Au
1000m
Recent AC
Drilling Area
yandalresources.com.au | ASX:YRL 7
Figure 3: Example of higher-grade Arrakis mineralisation from HQ core (~63.5mm diameter
core) intercepted in 25IWBRC0040D.
Figure 4: Example of higher-grade Arrakis
mineralisation from HQ core (~63.5mm diameter
core) intercepted in 25IWBRC0041D.
25IWBRC0041D 187.5m to
187.8m – HQ Core @
0.5g/t Au
yandalresources.com.au | ASX:YRL 8
Looking Ahead
The Company maintains a strong cash position and a very active exploration schedule for
the remainder of 2025 and into 2026. Notable near-term activities and news flow include;
Arrakis Discovery
• Air-core results from three 400m spaced lines southeast of Arrakis are anticipated
from mid-December;
• Further assay results from the now completed Arrakis diamond drilling are
anticipated throughout December;
• The Arrakis RC drilling program on 200m spaced lines has commenced, with
results expected from late December and throughout January;
New England Granite Target Area
• All results from AC drilling across the New England Granite target area are
anticipated from mid-December;
Key Exploration Infrastructure
• Operational and scheduling preparations are underway for a ramp-up of
exploration following the wet season in 2026, including upgrades to site
infrastructure and the expansion of the operational team.
Authorised by the board of Yandal Resources
For further information, please contact:
Chris Oorschot
Managing Director
Yandal Resources Limited
yandal@yandalresources.com.au
Greg Fitzgerald
Company Secretary
+61 8 9389 9021
yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL 9
About Yandal Resources Limited
Yandal Resources has a portfolio of advanced gold exploration projects in the highly prospective Yandal
and Norseman-Wiluna Greenstone Belts of Western Australia.
Figure 5: Yandal Resource exploration Project locations within the Yandal
Greenstone Belt. The Arrakis Prospect is located within the Caladan target area.
King of the Hills
Thunder Box
Darlot
Bellevue
Kathleen Valley
Mt Keith
Wiluna
Jundee
Bronzewing
Wiluna
Leinster
Ironstone Well-
Barwidgee
Mt McClure
NEG |Siona Discovery
Flushing
Meadows Caladan | Arrakis Discovery
0 20 40 60 80km
yandalresources.com.au | ASX:YRL 10
Figure 6: Yandal Resource exploration target areas and prospect locations within the northern
Yandal Greenstone Belt. The Arrakis Prospect is located within the Caladan target area.
yandalresources.com.au | ASX:YRL 11
Table 1 – Yandal Resources Ltd - Mineral Resource Summary
Deposit
Indicated Inferred Total
Tonnes
(‘000s)
Grade
(g/t)
Au
(oz)
Tonnes
(‘000)
Grade
(g/t)
Au
(oz)
Tonnes
(000’s)
Grade
(g/t)
Au
(Oz)
Ironstone Well
Flushing Meadows1 2,141 1.3 91,000 5,245 1.1 177,000 7,386 1.1 268,000
Mt McClure
Challenger2 718 1.9 44,000 718 1.9 44,000
Success3 1,255 1.9 75,000 1,255 1.9 75,000
Parmelia4 252 2.1 17,000 252 2.1 17,000
HMS Sulphur5 1010 1.2 39,000 1010 1.2 39,000
Gilmore6 134 1.7 7,200 134 1.7 7,200
Sub-total - MMC 3,369 1.7 182,200 3,369 1.7 182,200
Grand-total7 2,141 1.3 91,000 8,614 1.3 359,200 10,755 1.3 450,200
Due to the effects of rounding, totals may not represent the sum of the individual components.
1. Reported above 0.5g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 4 November 2020 for full
details. 2. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 22 August 2022 for
full details 3. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 6 September
2022 for full details. 4. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 20
September 2022 for full details. 5. Reported above 0.5g/t Au lower cut-off grade within this announcement 6. Reported above 1.0g/t
Au lower cut-off grade within this announcement. 7. All Resources are reported as global estimates, not constrained by optimised pit
shells.
Competent Person Statement
The information in this document related to Exploration Targets and Exploration Results, geology and data
compilation is based on information reviewed or compiled by Mr Christopher Oorschot, a Competent
Person who is a Member of The Australasian Institute Geoscientists. Mr Oorschot is the Managing Director
of the Company, is a full-time employee and holds shares and options in the Company. Mr Oorschot has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Oorschot consents to the inclusion in this announcement of the matters based on this information in the
form and context in which it appears.
The information in this announcement that relates to the Flushing Meadows, Mt McClure and Gordons Dam
Mineral Resource Estimates is based on information compiled and generated by Andrew Bewsher, an
employee of BM Geological Services Pty Ltd (“BMGS”). Both Andrew Bewsher and BMGS hold shares in
the company. BMGS consents to the inclusion, form and context of the relevant information herein as
derived from the original resource reports. Mr Bewsher has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration and to the activity which is being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the JORC ‘Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves’.
YRL confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
yandalresources.com.au | ASX:YRL 12
Forward Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include, but
are not limited to, statements concerning Yandal Resources Limited’s (Yandal’s) current expectations,
estimates and projections about the industry in which Yandal operates, and beliefs and assumptions
regarding Yandal’s future performance. When used in this document, words such as “anticipate”, “could”,
“plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are
forward-looking statements. Although Yandal believes that its expectations reflected in these forward-
looking statements are reasonable, such statements are subject to known and unknown risks, uncertainties
and other factors, some of which are beyond the control of Yandal and no assurance can be given that
actual results will be consistent with these forward-looking statements. Drilling results presented indicate
geological potential for mineralisation but there can be no certainty that these results will eventually form
part of a Mineral Resource Estimate.
Table 2 – Arrakis diamond drilling program collar location summary. Please note, collars are yet to
be formally surveyed; the coordinates below are derived from a handheld GPS, accurate to within
+/- 5m.
Hole ID
Hole
type
East
(m)
North
(m)
RL
(mAHD)
Azimuth
(degrees)
Dip
(degrees)
Pre-collar
Depth
(m)
Total
Depth
(m)
25IWBRC0040D RCD 287381 7027046 523.3 049.6 -58.8 162 304
25IWBRC0041D RCD 287513 7027189 523.2 228.6 -57.6 186 294
25IWBRC0044D RCD 286563 7027921 523.0 230.9 -59.9 168 216
25IWBRC0046D RCD 288075 7026618 525.1 230.9 -60.1 210 370
25IWBDD0011 DD 287541 7027217 523.0 229.6 -59.7 N/A 369
25IWBDD0012 DD 287207 7027427 522.5 230.1 -58.7 N/A 360
25IWBRC0036D RCD 286954 7027757 523.0 228.4 -60.0 138 456
25IWBDD0013 DD 286061 7027962 525.0 46.9 -60.1 N/A 417
yandalresources.com.au | ASX:YRL 13
Table 3 – Caladan October air-core drilling program collar location summary. Please
note, the coordinates below are derived from a handheld GPS, accurate to within +/-
5m.
Hole ID
Hole
type
East
(m)
North
(m)
RL
(mAHD)
Azimuth
(degrees)
Dip
(degrees)
Total
Depth
(m)
25IWBAC175 AC 288025 7025965 527.3 225 -60 150
25IWBAC176 AC 288090 7026037 526.9 225 -60 100
25IWBAC177 AC 288168 7026129 526.6 225 -60 162
25IWBAC178 AC 288259 7026200 526.3 225 -60 147
25IWBAC179 AC 288342 7026288 526.1 225 -60 141
25IWBAC180 AC 288307 7026288 526.1 225 -60 72
25IWBAC181 AC 288286 7026264 526.1 225 -60 124
25IWBAC182 AC 288289 7025670 528.3 225 -60 127
25IWBAC183 AC 288430 7025821 527.9 225 -60 153
25IWBAC184 AC 288515 7025913 527.6 225 -60 127
25IWBAC185 AC 288571 7026004 527.2 225 -60 120
25IWBAC186 AC 288457 7025308 529.3 225 -60 103
25IWBAC187 AC 288564 7025418 529.2 225 -60 135
25IWBAC188 AC 288616 7025492 529.2 225 60 34
25IWBAC189 AC 288703 7025577 529.2 225 -60 66
25IWBAC190 AC 288316 7025173 529.8 225 -60 111
Table 4 – Arrakis Prospect - Summary of significant diamond core assay results >0.3g/t Au with no more
than 4m of continuous internal waste included unless otherwise stated. All intercept lengths are reported
as down-hole lengths.
Hole
ID
Sample
type / Sub
Interval
From
(m)
To
(m)
Interva
l
(m)
Au
(g/t)
Comment
25IWBRC0040D Half HQ 108.00 165.50 56.50 1.3 Fresh rock
25IWBRC0040D Including 149.00 163.75 14.75 3.3
25IWBRC0041D Half HQ 180.00 217.00 37.00 0.6 Fresh rock
25IWBRC0041D Including 180.00 186.50 6.50 1.5
25IWBRC0041D With >0.1g/t Au 180.00 236.20 56.20 0.5
Alternative calculation of mineralised
interval calculated using a >0.1 lower
cut-off grade
yandalresources.com.au | ASX:YRL 14
Relevant Previous ASX Announcements
• Final Arrakis RC Results with Diamond Drilling to Commence, 13 October 2025
• Arrakis Gold Discovery Extended by 400m, 24 September 2025
• Arrakis Gold Discovery Confirmed With 54m @ 1.2g/t Au, 22 September 2025
• Arrakis RC Drilling Complete & All AC Results Now Received, 17 September 2025
• RC Drilling Commences Across Arrakis, 1 September 2025
• Arrakis Extended to Over 2.2km in Strike, 18 August 2025
• Caladan AC Results Further Extend Arrakis Mineralisation, 31 July 2025
• Caladan AC Shows Early Signs of Scale, 10 July 2025
• Caladan Air-Core Drilling Program Commences, 5 June 2025
• RIU Sydney Presentation, 7 May 2025
• Arrakis RC Drilling Results, 30 April 2025
• Ironstone Well-Barwidgee Exploration Update, 25 February 2025
• Caladan Air-Core Drilling Demonstrates Discovery Potential, 15 January 2025
• Air-core Drilling Commences Across Caladan and Irulan, 10 October 2024
• Oblique Diamond Drilling Results, 3 September 2024
• IWB Soil Results and NEG Diamond Drilling Complete, 12 August 2024
• Large-scale Gold Anomalies Across Emerging Targets, 15 July 2024
• Gold Coast Investment Showcase Presentation, 20 June 2024
• Exploration Update – IWB Ground Gravity Survey, 11 June 2024
ASX Announcement 24 November 2025 Page 15
Appendix 1 – Ironstone Well-Barwidgee Gold Project, Arrakis Drilling
JORC Code (2012) Table 1, Sections 1 and 2
Mr Christopher Oorschot, Managing Director of Yandal Resources, compiled the information in Section 1 and Section 2 of the following JORC Table 1 and
is the Competent Person for those sections. The following Table and Sections are provided to ensure compliance with the JORC Code (2012 edition)
requirements for the reporting of Exploration Results.
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
• Yandal Resources has completed diamond drilling across the Arrakis Prospect. The drilling
involved a mix of RC pre-collars or rock-rolling down to fresh rock, followed by HQ (diameter of
~63.5mm) diamond core drilling to an average down-hole depth of 348m (between 216m and
465m. Holes were drilled at an angle of -60 ° to either the southwest or northeast. The core was
halved with a core saw, with the right-hand side (looking downhole) sampled. Before sampling,
a company geologist logs the core for lithology type, veining, alteration, and deformation.
Sample lengths vary according to logged geological intervals of interest, with a minimum of
0.2 metres and a maximum of 1.0 metres. Sample quality is considered high.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• For YRL diamond drilling, sample recovery of each metre drilled was measured and recorded,
and high-resolution photos of each tray before cutting were obtained. The unsampled half of
the drill core is also retained. Intervals where the core is unoriented have been recorded.
• For YRL diamond drilling, when the core is cut for sampling, the same side of the core, relative
to the bottom-of-hole orientation mark, is collected for analysis. For intervals without an
orientation mark, the core is pieced together, and foliation or common structures are used to
approximately orient the core for sampling purposes.
• Structural observations have also been recorded where the diamond core is oriented, and the
core was routinely checked for any structures sub-parallel to the core axis.
Aspects of the determination of mineralisation that are
Material to the Public Report. In cases where ‘industry
standard’ work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was used to obtain
1 m samples from which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems. Unusual
• For all YRL diamond drilling results, HQ core was cut in half and used to obtain 0.2m to 1.0m
half-core samples. These samples were submitted to a laboratory, where they were dried,
weighed, and crushed. The Sample pulp was then split to produce a 50g charge for fire assay
with an AAS (atomic absorption spectroscopy) finish for gold determination with a 0.01ppm
detection limit.
ASX Announcement 24 November 2025 Page 16
Criteria JORC Code explanation Commentary
commodities or mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed information.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (e.g. core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type, whether
core is oriented and if so, by what method, etc).
• YRL diamond core was drilled using HQ (63.5mm core diameter) coring bits. For both diamond
holes, diamond core drilling commenced via RC pre-collars or rock-rolling, which was
completed to fresh rock. Subject to ground conditions, the core was oriented using a
downhole orientation tool (Reflex ACT Mk3 NQ/HQ Core Ori kit).
Drill sample
recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
• For YRL diamond drilling core recovery is measured and recorded. The length of core
recovered for each metre drilled is measured to the nearest 5cm and entered into an Excel
spreadsheet along with information relating to fracture frequency (driller breaks are marked
with a red “X”). In addition, dry and wet core photos are collected before the core is cut and
retained on the company server.
• For YRL diamond drilling, the orientation of contacts, veins and shears is regularly measured
and monitored.
• No relationship or bias between sample recovery and grade within the diamond drilling results
has been observed.
Logging Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
• For YRL diamond drilling, a full log of all diamond cores was completed by the supervising
geologist in the field. Intervals were logged at various intervals based on changes in lithology,
deformation intensity, veining types, and alteration. Both planar and linear structural
measurements were also collected using a core orientation stand and a kenometer. Logging
data was captured directly into an MX Deposit database.
• Data captured through geological logging by a geologist is qualitative in nature.
• In addition to geological logging, the magnetic susceptibility of each interval is measured
using a KT-10 magnetic susceptibility metre, with a sensitivity of 1x10-6 SI Units. Magnetic
susceptibility readings are quantitative in nature.
Sub-sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter, half or
all core taken.
• For YRL diamond drilling, the HQ (63.5mm diameter) cores were halved using a core saw, and
the right-hand side of the core (looking downhole) was sampled. The second half of core
retains the orientation line, metre marks and is stored in annotated core trays within a secure
yard.
• When determining sample intervals, core is sampled to contacts where observed so that
ASX Announcement 24 November 2025 Page 17
Criteria JORC Code explanation Commentary
If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected, including
for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled.
material from a geological interval of interest is not included within the adjacent geological
interval.
• Where narrow geological intervals of interest are observed, such as quartz veining, sample
lengths are reduced so that only the feature of interest is sampled down to a minimum length
of 0.2m.
• Diamond core samples are of high q