Final RC Results Received from the Arrakis Prospect
Diamond Drilling to Commence
• Results from the final three holes from the broadly spaced 7-hole Arrakis RC
program completed earlier in September have been received.
• Result and geological observations suggest that 25IWBRC0044 and
25IWBRC0046 ended short of the targeted Arrakis structure, and diamond
tails extending both holes will be prioritised and completed in the coming
weeks.
• A diamond core rig has been mobilised with drilling to commence in the
coming days.
• Diamond drilling will also be completed below recently reported intercepts
(see ASX releases 22 & 24 September 2025) that include:
o 54m*1 @ 1.2g/t Au from 108m to EOH in 25IWBRC0040, including
24m @ 2.1g/t Au from 138m to EOH. This interval further includes:
• 8m @ 4.7g/t Au from 154m to EOH.
o 50*1m @ 1.3g/t Au from 122m in 25IWBRC0042 (ETW of 24m), including
28m @ 1.9g/t Au from 143m. This interval further includes:
• 9m @ 2.1g/t Au from 145m, and
• 7m @ 2.7g/t Au from 164m.
*1: Down-hole width reported, as true width is uncertain, and further drilling is required to confirm the geometry of
mineralisation.
• The approximately 2,000m diamond drilling program is anticipated to be
completed in four to six weeks, with results expected in December.
• Preparations are also underway for a circa. 5,000m RC program at Arrakis
across 200m spaced lines that will commence in November.
• The recently completed A$13.5 million capital raising enables Yandal
Resources to expand and accelerate exploration across the Ironstone-Well
Barwidgee Gold Project, including the Arrakis discovery, New England
Granite target area and Flushing Meadows deposit.
ASX Announcement
13 October 2025
yandalresources.com.au | ASX:YRL 2
For further information or to ask questions in relation to this announcement, please visit
our Investor Hub at https://yandalresources.com.au/link/e958Ve
Commenting on the new results, Yandal Resources’ Managing Director, Mr. Chris Oorschot,
said: “Geological logging from previous intercepts indicate that a zone of intense silica
alteration or micro-crystalline veining marks the eastern boundary of mineralisation, and
while intense alteration and deformation were observed in these last three RC holes,
particularly within 25IWBRC0044 and 25IWBRC0046, a comparison of alteration types and
zonation suggests they finished before the targeted Arrakis structure. While it is
disappointing that these final RC holes did not penetrate the targeted Arrakis structure,
they provide a perfect pre-collar for diamond drilling, potentially enabling speedy access
to oriented diamond core intercepting the Arrakis structure.
Arrakis is the result of an exploration strategy that is centred on delivering large-scale
discoveries. The Caladan target area and the discovery of Arrakis therein have progressed
rapidly over the last three months. This progress has been made utilising broad 800m and
400m spaced drill lines that were applied to identify evidence of the broad mineralised
system. There is plenty of work ahead, with early results suggesting an extensive mineralised
system. Looking ahead, the team will focus on understanding the full extent of
mineralisation over the coming months.”
Yandal Resources Ltd (ASX: YRL, “Yandal Resources” or the “Company”) is pleased to report that
the results from 25IWBRC0044, 25IWBRC0045, and 25IWBRC0046, part of the recently completed
reverse circulation (RC) drilling program across the Arrakis Prospect, have been received. The RC
drilling program included seven (7) RC holes for a total of 1,374m, across 400m and 800m spaced
lines targeting mineralisation intercepted within recent air-core drilling that defines the more than
2.2km long mineralised Arrakis structure (see Figure 3). The RC program was designed to confirm
the continuity and geometry of mineralisation within fresh rock below several significant air-core
intercepts that occurred in either fully or partially weathered rock.
RC holes 25IWBRC0044 and 25IWBRC0046 (see Figure 1) did not return significant intercepts. A
geological review indicates that neither of the RC holes intercepted the targeted Arrakis
mineralisation. Furthermore, the targeted Arrakis structure is likely to be intercepted if both holes
are extended, with diamond core tails designed and scheduled for completion in the coming
weeks.
RC hole 25IWBRC0045 was drilled to test below an air-core intercept of 5m @ 0.7g/t from 112m to
EOH in 25IWBAC0052, located 800m northwest of the 2.2km mineralised Arrakis trend. The RC hole
has effectively tested below this intercept and returned only low-level gold anomalism within
fresh rock. Logging indicates a broad zone of shearing was intercepted with intense chlorite
alteration; however, the alteration styles associated with Arrakis mineralisation were not
observed.
yandalresources.com.au | ASX:YRL 3
The broadly spaced seven-hole RC program has successfully confirmed Arrakis as a new gold
discovery and achieved its core aims of assessing mineralisation continuity into fresh rock and
verifying the geometry of mineralisation on section. The results of this program demonstrate the
potential for a mineralised system of regional significance. Diamond core drilling is scheduled to
commence in the coming days and will include several re-entries of RC holes (diamond tails, see
Figure 2) and several deeper diamond holes below recently reported intercepts (see ASX releases
22 September 2025 and 24 September 2025). In addition to this, RC drilling across 200m spaced
lines is scheduled to commence in November to define the extent of mineralisation across the
Arrakis discovery.
The Arrakis Prospect is located within the Caladan target area (tenements E 53/1843, E 53/2304,
E 53/2192 and E 53/1882), part of the broader Ironstone Well-Barwidgee Gold Project (see Figure
4), located 60km south of the Jundee mining complex (ASX: NST), and 18km north the recent
Siona discovery, within the Yandal Greenstone Belt.
Next Steps
An approximately 2,000m diamond core program will commence in the coming days. The
program will aim to complete several re-entries extending RC holes that ended within or adjacent
to mineralisation. In addition to this, several new diamond holes from the surface will be
completed to test below the recent intercepts from 25IWBRC0040 and 25IWBRC0042 (see Figure
2).
A heritage survey clearing 100m spaced lines across the Arrakis Prospect is underway to provide
significant capacity for closer spaced drilling across the Arrakis discovery.
A 5,000m RC drilling program has been scheduled for November. This drilling will aim to complete
drilling on 200m spaced lines across the 2.2km striking Arrakis trend, to delineate the extent of the
mineralised system and begin to understand how gold mineralisation varies along strike and at
depth.
yandalresources.com.au | ASX:YRL 4
Figure 1: Cross-section showing all RC drilling results from 25IWBRC0046, with a simple preliminary
interpretation of geology. The section location is shown in Figure 3. The section shows all drilling within
+/- 50m of the section plane. A proposed diamond tail, that will extend 25IWBRC0046 through the
interpreted Arrakis mineralisation, is shown on the section.
Cross-Section A
northwest facing
Transported Cover
Surface
Dolerite
Planned
Diamond
Tail
22m @ 0.5 g/t Au incl.
4m @ 1.7 g/t Au
RC EOH 210m
Intermediate/
Sediments
yandalresources.com.au | ASX:YRL 5
Figure 2: Cross-section showing all RC drilling results from 25IWBRC0040 and 25IWBRC0041, with
a simple preliminary interpretation of geology. The section location is shown in Figure 3. The
section shows all drilling within +/- 50m of the section plane. The dark blue line represents
planned diamond core drilling, including a diamond tail extending 25IWBRC0041 with diamond
drilling.
Cross-Section B
northwest facing
Transported Cover
Surface
Dolerite
11m @ 1.4 g/t Au
incl. 6m @ 2.3 g/t Au
6m @ 1.1 g/t Au to EOH
Regolith
Anomalies
54m @ 1.2 g/t Au incl.
24m @ 2.1 g/t Au to EOH
Planned
Diamond
Tail
Planned
Diamond
Drill Hole
RC EOH 186m
yandalresources.com.au | ASX:YRL 6
Figure 3: A collar plan over the Arrakis Prospect within the Caladan target area, showing simplified
bedrock geology interpretation. All Yandal drilling is plotted (historic drilling has been excluded.
Collars are thematically coloured by max Au (g/t) in the hole. The red line represents the
approximate position of the interpreted Arrakis mineralised structure. Dashed yellow polygons
represent air-core regolith anomalies (Results include ~4m @ 0.1 g/t Au or greater, with the upper
profile or the bottom-of-hole sample is 0.1g/t Au or greater).
Interpreted
Arrakis
Structure
11m @ 1.7g/t from to EOH
5m @ 0.7g/t Au
from 112m to EOH
22m @ 0.4 g/t Au
Incl. 7m @ 1.2 g/t Au
12m @ 1.1 g/t Au &
12m @ 0.5 g/t Au to EOH
11m @ 2.1g/t Au 25IWBRC0041
6m @ 1.1 g/t Au to EOH
25IWBRC0040
54m @ 1.2 g/t Au incl.
24m @ 2.1 g/t Au to EOH
25IWBRC0042
50m @ 1.3 g/t Au incl.
28m @ 1.9g/t Au
25IWBRC0043
16m @ 1.1 g/t Au
25IWBRC0046
To be extended
25IWBRC0044
To be extended
25IWBRC0045 - NSA
yandalresources.com.au | ASX:YRL 7
Looking Ahead
The Company maintains a strong cash position and a very active exploration schedule for
the remainder of 2025 and into 2026. Notable near-term activities and news flow include;
1. A second heritage survey to clear 100m spaced lines across the Caladan target area,
including the Arrakis Prospect, is underway;
2. A diamond core rig has arrived on site with drilling to commence in the coming days;
3. RC drilling on 200m spaced line across the Arrakis Prospect is scheduled for November;
4. First results from AC drilling across the New England Granite target area are anticipated
in the coming weeks;
5. Completion of the Gordons Gold Project Tenement Sale Agreement for total
consideration of A$2.81m is expected shortly.
6. 23.6m unlisted YRL options with an exercise price of $0.11 will expire at 5:00pm (WST)
on Monday, 17 November 2025. The total value of these options if exercised is
A$2.6m.
Authorised by the board of Yandal Resources
For further information, please contact:
Chris Oorschot
Managing Director
Yandal Resources Limited
yandal@yandalresources.com.au
Greg Fitzgerald
Company Secretary
+61 8 9389 9021
yandal@yandalresources.com.au
yandalresources.com.au | ASX:YRL 8
About Yandal Resources Limited
Yandal Resources has a portfolio of advanced gold exploration projects in the highly prospective Yandal
and Norseman-Wiluna Greenstone Belts of Western Australia.
Figure 4: Yandal Resource exploration Project locations within the Yandal
Greenstone Belt. The Arrakis Prospect is located within the Caladan target area.
King of the Hills
Thunder Box
Darlot
Bellevue
Kathleen Valley
Mt Keith
Wiluna
Jundee
Bronzewing
Wiluna
Leinster
Ironstone Well-
Barwidgee
Mt McClure
NEG |Siona Discovery
Flushing
Meadows Caladan | Arrakis Discovery
0 20 40 60 80km
yandalresources.com.au | ASX:YRL 9
Table 1 – Yandal Resources Ltd - Mineral Resource Summary
Deposit
Indicated Inferred Total
Tonnes
(‘000s)
Grade
(g/t)
Au
(oz)
Tonnes
(‘000)
Grade
(g/t)
Au
(oz)
Tonnes
(000’s)
Grade
(g/t)
Au
(Oz)
Ironstone Well
Flushing Meadows1 2,141 1.3 91,000 5,245 1.1 177,000 7,386 1.1 268,000
Mt McClure
Challenger2 718 1.9 44,000 718 1.9 44,000
Success3 1,255 1.9 75,000 1,255 1.9 75,000
Parmelia4 252 2.1 17,000 252 2.1 17,000
HMS Sulphur5 1010 1.2 39,000 1010 1.2 39,000
Gilmore6 134 1.7 7,200 134 1.7 7,200
Sub-total - MMC 3,369 1.7 182,200 3,369 1.7 182,200
Gordons
Gordons Dam7 365 1.7 20,000 365 1.7 20,000
Grand-total8 2,141 1.3 91,000 8,979 1.3 379,200 11,120 1.4 470,200
Due to the effects of rounding, totals may not represent the sum of the individual components.
1. Reported above 0.5g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 4 November 2020 for full
details. 2. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 22 August 2022 for
full details 3. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 6 September
2022 for full details.4. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX announcement dated 20
September 2022 for full details 5. Reported above 0.5g/t Au lower cut-off grade within this announcement 6. Reported above 1.0g/t
Au lower cut-off grade within this announcement 7. Reported above 1.0g/t Au lower cut-off grade; refer to Yandal Resources Ltd ASX
announcement dated 6 April 2023 for full details 8. All Resources are reported as global estimates, not constrained by optimised pit
shells.
Competent Person Statement
The information in this document related to Exploration Targets and Exploration Results, geology and data
compilation is based on information reviewed or compiled by Mr Christopher Oorschot, a Competent
Person who is a Member of The Australasian Institute Geoscientists. Mr Oorschot is the Managing Director
of the Company, is a full-time employee and holds shares and options in the Company. Mr Oorschot has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Oorschot consents to the inclusion in this announcement of the matters based on this information in the
form and context in which it appears.
The information in this announcement that relates to the Flushing Meadows, Mt McClure and Gordons Dam
Mineral Resource Estimates is based on information compiled and generated by Andrew Bewsher, an
employee of BM Geological Services Pty Ltd (“BMGS”). Both Andrew Bewsher and BMGS hold shares in
the company. BMGS consents to the inclusion, form and context of the relevant information herein as
derived from the original resource reports. Mr Bewsher has sufficient experience relevant to the style of
mineralisation and type of deposit under consideration and to the activity which is being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the JORC ‘Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves’.
YRL confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement. The Company confirms that the form and context in which
yandalresources.com.au | ASX:YRL 10
the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
Forward Looking Statements
This document may contain certain forward-looking statements. Forward-looking statements include, but
are not limited to, statements concerning Yandal Resources Limited’s (Yandal’s) current expectations,
estimates and projections about the industry in which Yandal operates, and beliefs and assumptions
regarding Yandal’s future performance. When used in this document, words such as “anticipate”, “could”,
“plan”, “estimate”, “expects”, “seeks”, “intends”, “may”, “potential”, “should”, and similar expressions are
forward-looking statements. Although Yandal believes that its expectations reflected in these forward-
looking statements are reasonable, such statements are subject to known and unknown risks, uncertainties
and other factors, some of which are beyond the control of Yandal and no assurance can be given that
actual results will be consistent with these forward-looking statements. Drilling results presented indicate
geological potential for mineralisation but there can be no certainty that these results will eventually form
part of a Mineral Resource Estimate.
Table 2 – Arrakis RC program collar location summary. Please note, collars are yet to be formally
surveyed; the coordinates below are derived from a handheld GPS, accurate to within +/- 5m.
Prospect/
Target
Hole ID
Hole
type
East
(m)
North
(m)
RL
(mAHD)
Azimuth
(degrees)
Dip
(degrees)
Total
Depth
(m)
Arrakis 25IWBRC0040 RC 287381 7027046 523.3 49.6 -58.8 162
Arrakis 25IWBRC0041 RC 287513 7027189 523.2 228.6 -57.6 186
Arrakis 25IWBRC0042 RC 287037 7027245 522.9 50.3 -60.3 180
Arrakis 25IWBRC0043 RC 287190 7027344 522.3 230.3 -59.5 180
Arrakis 25IWBRC0044 RC 286563 7027921 523.0 230.9 -59.9 168
Arrakis 25IWBRC0045 RC 285838 7028911 523.2 230.9 -60.8 288
Arrakis 25IWBRC0046 RC 288075 7026618 525.1 230.9 -60.1 210
Table 3 – Arrakis Prospect - Summary of significant RC drilling assay results >0.3g/t Au with no more than
4m of continuous internal waste included unless otherwise stated. All intercept lengths are reported as
down-hole lengths.
Hole
ID
Sample
type /
Sub
From
(m)
To
(m)
Interva
l
(m)
Au
(g/t)
Comment
25IWBRC0044 1m Sample NSA Hole ended short of the target structure
25IWBRC0045 1m Sample NSA
25IWBRC0046 1m Sample NSA Hole ended short of the target structure
NSA – No significant assays
yandalresources.com.au | ASX:YRL 11
Relevant Previous ASX Announcements
o Arrakis Gold Discovery Extended by 400m, 24 September 2025
o Arrakis Gold Discovery Confirmed With 54m @ 1.2g/t Au, 22 September 2025
o Arrakis RC Drilling Complete & All AC Results Now Received, 17 September 2025
o RC Drilling Commences Across Arrakis, 1 September 2025
o Arrakis Extended to Over 2.2km in Strike, 18 August 2025
o Caladan AC Results Further Extend Arrakis Mineralisation, 31 July 2025
o Caladan AC Shows Early Signs of Scale, 10 July 2025
o Caladan Air-Core Drilling Program Commences, 5 June 2025
o RIU Sydney Presentation, 7 May 2025
o Arrakis RC Drilling Results, 30 April 2025
o Ironstone Well-Barwidgee Exploration Update, 25 February 2025
o Caladan Air-Core Drilling Demonstrates Discovery Potential, 15 January 2025
o Air-core Drilling Commences Across Caladan and Irulan, 10 October 2024
o Oblique Diamond Drilling Results, 3 September 2024
o IWB Soil Results and NEG Diamond Drilling Complete, 12 August 2024
o Large-scale Gold Anomalies Across Emerging Targets, 15 July 2024
o Gold Coast Investment Showcase Presentation, 20 June 2024
o Exploration Update – IWB Ground Gravity Survey, 11 June 2024
ASX Announcement 13 October 2025 Page 12
Appendix 1 – Ironstone Well-Barwidgee Gold Project, Caladan RC Drilling
JORC Code (2012) Table 1, Sections 1 and 2
Mr Christopher Oorschot, Managing Director of Yandal Resources, compiled the information in Section 1 and Section 2 of the following JORC Table 1 and
is the Competent Person for those sections. The following Table and Sections are provided to ensure compliance with the JORC Code (2012 edition)
requirements for the reporting of Exploration Results.
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
• Yandal Resources has completed RC drilling across several 400m and 800m spaced lines across
the Arrakis Prospect, targeting fresh rock mineralisation below recently reported air-core
intercepts. The drilling involved 139mm face sampling bit down to between 162m and 288m.
Holes were drilled at an angle of -60° to the southwest.
• Yandal Resources (YRL) RC drilling samples were collected via a rig-mounted static cone
splitter, splitting approximately 12.5% of the total sample volume. Two splits are collected for
each metre: a primary and duplicate sample. The primary 1m samples are then sent to a lab
for further analysis. The duplicate samples are retained on-site unless they are submitted as
routine duplicates.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• For YRL RC drilling, the cone splitter is regularly cleaned and inspected. The 1m bulk samples
are laid out in drill order. These bulk samples are regularly inspected for contamination, and
the volume of the bulk sample is monitored. These bulk samples are retained until all results are
received and may be used to collect additional field duplicates to verify lab results, logged
geology or any other form of analysis. If the bulk sample appears visually low in volume or
weight, this is recorded with the sample details. The same applies to damp or wet samples.
• Two splits are collected for each drilled metre: a primary and a secondary sample. The
Secondary sample is retained on-site and may be used to collect additional field duplicates
to verify lab results, logged geology or any other form of analysis
Aspects of the determination of mineralisation that are
Material to the Public Report. In cases where ‘industry
standard’ work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was used to obtain
1 m samples from which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems. Unusual
• RC drilling was used to obtain 1m samples from which a portion, between 1-5kg in weight, was
dispatched to Aurum Laboratories Pty Ltd:
• At the lab, samples were crushed and pulverised to produce a 50g charge for fire assay with
an AAS (atomic absorption spectroscopy) finish for gold determination with a 0.01ppm
detection limit.
ASX Announcement 13 October 2025 Page 13
Criteria JORC Code explanation Commentary
commodities or mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed information.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (e.g. core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type, whether
core is oriented and if so, by what method, etc).
• For YRL RC drilling, a 139mm diameter face sampling bit and hammer was used.
Drill sample
recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
• For YRL holes, RC drilling recoveries are visually assessed by the supervising geologist, and any
low-volume or weight samples are recorded, along with any damp or wet samples. Drill depths
are routinely verified at the completion of each drill rod (every 6m). The cone splitter is checked
for each drill site to ensure it is completely upright and level. Sample collection from the splitter
by drilling off-siders is monitored for any inefficiencies.
• Within the limited drilling completed, there appears to be no correlation between sample
recovery and sample grade.
Logging Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
The total length and percentage of the relevant
intersections logged.
• For YRL drilling, all RC holes have been logged in full by a qualified and experienced geologist.
RC chips and fines from each 1m interval drilled are inspected and logged for colour,
weathering, lithology, deformation, veining and sulphide species. All 1m samples are sieved
and retained in labelled and annotated chip trays. Chip trays are transported to Perth for long-
term storage and are available for review. The quality of logging information is considered
sufficient to support Mineral Resource Estimation studies.
• Data captured through geological logging by a geologist is qualitative in nature.
• In addition to geological logging, the magnetic susceptibility of each interval is measured using
a KT-10 magnetic susceptibility metre, with a sensitivity of 1x10-6 SI Units. Magnetic susceptibility
readings are quantitative in nature.
Sub-sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter, half or
all core taken.
• YRL RC drilling utilised a rig-mounted cone splitter installed directly below and in line with the
rig-mounted cyclone. Two 1-3kg sub-samples are collected into calico bags labelled with a
unique alpha-numeric ID. A majority of the samples collected were dry; if samples were damp
or wet, this was noted in the sample records.
• For all YRL RC drilling, samples are dried at 100°C to constant mass, crushed to <10mm and
ASX Announcement 13 October 2025 Page 14
Criteria JORC Code explanation Commentary
If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected, including
for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled.
pulverised to nominally 85%, passing 75µm.
• Field duplicates were collected at an initial rate of 1 duplicate for every 50 samples collected.
• Standards and blanks (certified reference material or CRM) were routinely inserted into the
sample sequence at a rate of 1 CRM for every 20 samples collected.
• For labs used by YRL, internal lab quality control measures include lab duplicates and the
insertion of lab standards and blanks.
• Sample sizes are appropriate given the fine-to-medium-grained nature of the sampled
material.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation,
etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
• For YRL RC drilling, samples were assayed at the following labs using the following methods:
o Aurum Laboratories in Beckenham, Western Australia, assayed using a 50g fire
assay with AAS (atomic absorption spectroscopy) finish for gold analysis with a
0.01ppm detection limit.
• Magnetic susceptibility measurements were taken every meter using a KT-10 V2 instrument with
a sensitivity of 1x10-6 SI Units.
• YRL QAQC field protocols include the insertion of commercially prepared certified reference
material (CRM) and blank material at a rate of approximately 1 CRM/blank for every 20
samples collected. CRMs used are unidentifiable by the lab when received. QAQC
performance is monitored upon receipt of each batch of results and re-assessed once all
samples for a program are received.
• Laboratory QA/QC protocols involve inserting internal lab standards using CRMs, blanks,
repeat analysis of pulps and screen tests (the percentage of pulverised material passing 75µm
mesh). Laboratory QAQC results are reported with each batch. Laboratory QAQC
performance is monitored upon receipt of each batch of results and assessed again once all
samples for a program are received.
Verification
of sampling
and assaying
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
• Significant intercepts from YRL RC drilling are verified by YRL geologists through the visual
inspection of chips, reviewing the spatial location of mineralisation relative to previous
intercepts, and in the case of high-grade gold intercepts, the panning of drill fines to visually
confirm gold in samples.
• No twinned holes have been completed across the Caladan or Irulan target area.
ASX Announcement 13 October 2025 Page 15
Criteria JORC Code explanation Commentary
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
• For YRL RC drilling, primary sampling and logging data are captured directly into the MX
deposit application and uploaded directly to the cloud-hosted MX Deposit database.
• The first assay result for each sample is used for the reporting of significant intercepts, and no
adjustments have been made to the assay data.
Location of
data points
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
• All drill collar locations were initially pegged and surveyed using a handheld Garmin GPS,
which was accurate to within +/- 5m. RLs are determined using a detailed surface DTM.
• All RC holes were downhole surveyed using a gyroscopic survey tool, producing azimuth
readings relative to true north that are then converted to UTM MGA94 Zone 51s. Readings are
collected at a maximum spacing of 30m downhole or better.
• All spatial data presente